Forwards Insp Rept 50-285/90-26 on 900416-0512.Violations Noted.No Citations Issued for Violations Discussed in Paragraphs 5.a,5.b, & 5.c of Rept
ML20055C790
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/18/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20055C791 List:
References
NUDOCS 9006250133
Download: ML20055C790 (3)


See also: IR 05000285/1990026

Text

{{#Wiki_filter:- - -- - n y .

  kf                            '
                                                                                                                     3
       x , '-                                                           JLN 18 500
                                                                                                                       >
               m~            In Reply Refer To-                                                                        i
                             Docket: 50-285/90-26
                                                                                                                        I
                             0maha<Public Power District                                                              1
                          ; ATTN: W. G. Gates, Division Manager
                   ,                  ' Nuclear Operations
                             444' South 16th Street Mall
                           -Mail Stop 8E/EP4
                             Omaha', Nebraska 68102-2247

n Gentlemen:.

   '
       A                     This refers to the inspection conducted by Messrs. P. Harrell and T. Reis of

F

                             this office during the period April 16 through May 12, 1990,.of activities
                             authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to
                             the d.iscussion of our findings with you and other members of your staff at the
                          -conclusion of the inspection.
                          - Areas examined during the inspection included operational safety verification;
                          . monthly maintenance, surveillance, security, and radiological protection
                             observations; onsite followup of eventi.; and in-office review of reports.
                             Within these areas, the inspection consisted of selective examination of                 ,
                             procedures and representative records, interviews with personnel, and                    ;
                             observations-by the inspectors. The inspection findings are documented in the
                             en' closed inspection report.
                                  .
                                                                      .                                               t
                             During .this inspection, it was found that certain of your activities were in-
                          -violation of NRC requirements. :However, in accordance with Section V.A of the
                                         ~
                           -
                          -NRC's Enforcement Policy, no citations are being issued for the violations
                             discussed in paragraphs 5.a, 5.b, and 5.c of the enclosed inspection-report.
                           .For:the violation discussed in paragraph 5.c, your staff failed to revise a
                           : safety analysis for a field change to a design modification. Although the act
                           , constituted procedural noncompliance,- the safety significance was minor.     It-       1
                             was' evident-the staff had examined the full effect of the field change.- Fori          o
                             the violation identified in paragraphs 5.a and.5.b, your. staff failed to
                             document and report deficiencies as required by'the quality assurance plan. It           ',
                             was evident that the deficiencies were elevated to the appropriate levels of
                             management; however, documentation and formal corrective action were lacking.
                             Plant management addressed these issues identified by the inspector in a prompt
                          ,and thorough manner.
       L
                             It is our understanding that you will incorporate training on the requirements
                             to document and report deficiencies into'the general employee training-
                     >
                             curriculum. This commitment is discussed in paragraph 5.b of the enclosed
                             report.
     '
                 .           We have also examined actions you have taken with regard to previously                   ,
         ,
                     T identified inspection findings.           The status of these items is identified in           ;
                             paragraph 3 of the enclosed report.                                                       '
                             RIV:8
                                    ;d
                                                SRhk          C:DRP       /      D- @
                                                                                   Jfollins
                                           g PHa   ret 1   f(GLConstab(
                                                                                                                  p(
           :
               -
                         ,.TRep/90
                             6/l                6/g /90       6/l6/90                    0-
                                              9006230133 90061e
                                              $'DR ADOCK 05000285
       .
                       .
                                                               rDc

+W c.

 w                                                                                                                  a
                                                                                         -
                    ;
                           '
 jYs.,                                                                      !                                           l
 !g % ,7                 ;4
           .
           ,
                       i &
               '
                         -
                                    *
 ;o . ..              . . .. .
 if [3 k
         '
                 ,.
                             !'                                                                                        f
   ,
                              = Os.=ha 'Public Powt'r District;               :-2-

n

  't
                                ~Should you have any questions concerning'this inspection, we will be pleased to-       i

n discuss them with you. j

                                                                                 Sincerely,
                                                                                     Original Signed By:
                                                                                     Samuel J. Couins
                                                                                ' Samuel J. Collins, Director     .
                                                                                 Division of Reactor Projects
                                 Enclosure:.                                                                         4
                                 Appendix - NRC Inspection Report:
             '
                                      50-285/90-26
                                 cc w/ enclosure:          .
                                 LeBoeuf, Lamb, Leiby & MacRae
                                 ATTN: H_arry H. Voigt, Esq.
                                 1333 New Hampshire Avenue,.NW
                                 Washington, D,C. :20036

,

                              LWashington County Board-

L of Supervisors

                                , ATTN: Jack Jensen, Chairman
     -

l:. l, Blair, Nebraska 68008

                                 Combustion Engineering, Inc.                                                         (
  e                              ATTN: Charles B. Brinkman, Manager               ,.                                 4
                                            . Washington Nuclear Operations
                                 12300 Twinbrook Parkway, Suite 330
                                 Rockville,; Maryland ' 20852
                                 Department of Health

? .' ATTN: Harold Borchert,' Director

                                          . . Division of. Radiological Health

4 -301 Centennial Mall, South

                                 P.O. Box 95007
                                 Lincoln,' Nebraska 68509                                                           il
                                        .
                                                                                                                    a
       ,                      . Fort Calhoun Station                                                                  ,.

T -ATTN: G.'R..Peterson, Manager. 4

                                                                                                                      '
  i                            'P.O.~: Box 399
                                 Fort.Calhoun, Nebraska 68023
                                                                                                                    3
                                 U.'S Nuclear Regulatory Commission                                                 '!
                                 ATTN: ~ Resident Inspector
                                 P.O. Box 309'
                                 Fort Calhoun, Nebraska 68023
                                                                                                                    -
                                _
               ye             nt        <<

{x > % ;;. ,*; .

        .       . av; : -
       (c' w , ;..
                   Mr'                                                                             i,

in Omaha Public Pcxer District -3- P

                  '
                                 LU.S.JNuclear Regulatory Commission                                [I
                                LATIN:        Regional Administrator, Region IV                    i
                                    611'Ryan Plaza Drive, Suite 1000                                l'
.,
                    '
                               '; Arlington.. Texas 76011
m
i:                    ,      ;.g     be'c'to DMB (IE01)
                                                                                                      i
                    ,                bec.distrib by RIV:
                                                                                                       ,
                                     *R; D. Martin                        * Resident Inspector   lL
                                                                                                             '
 _. < +                              *DRSS-FRPS                           *Section Chief (DRP/C)
 "                               (* MIS System                            *RIV File
                                  '*DRP                                   *RSTS Operator
                         ,:          * Project Engineer (DRP/C)            ' Li sa Shea, RM/ALF.
14                                :*DRS
                                     *A 'Bournia, NRR Project Manager (MS:       11-H-21)_              l
                         '
    -
    -
    ,                                "w/766                                                              i
ii:-                    ,,
                                                                                                         i
                                                                                                 -
                                   -
  w-
                                                                                                          i
                                                                                                          1
                                                                                                     -{
                                                                                           ,
                                                                                                     .6
          '                                                                                                .
                           .
                         g
      (' '
   os
            ',

}}