March 2, 2006

SUBJECT:

ANNUAL ASSESSMENT LETTER - FORT CALHOUN STATION (NRC INSPECTION REPORT 05000285/2006001)

Dear Mr. Ridenoure:

On February 8, 2006, the NRC staff completed its performance review of Fort Calhoun Station.

Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, Fort Calhoun Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix, based on one finding of low to moderate safety significance (White) in the Mitigating Systems Cornerstone involving an emergency diesel generator. This finding also resulted in the Emergency AC Power System Unavailability PI being White for the first two quarters of 2005. A supplemental inspection was conducted in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, and was completed in June 2005. That inspection concluded that your staff had performed a comprehensive evaluation of the circumstances related to the emergency diesel generator failure and appropriate corrective actions were taken to address the root and contributing causes associated with the failure.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through September 30, 2007. In addition to the baseline inspection program, we also plan to conduct Inspection Procedure 50001, Steam Generator Replacement Inspections; Inspection Procedure 50003, Pressurizer Replacement Inspection; and Inspection Procedure 71007, Reactor Vessel Head Replacement Inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine

Omaha Public Power District-2-resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. David Graves at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur T. Howell III, Director Division of Reactor Projects Docket: 50-285 License: DPR-40 Enclosure:

Fort Calhoun Station Inspection/Activity Plan cc:

Timothy F. Dunning, Sheriff Douglas County 3601 N. 156th Street Omaha, NE 68116 Carol McBride Pirsch, Chairperson Douglas County Board of Commissioners Civic Center 1819 Farnam LC2 Omaha, NE 68183 Steve Lee, Director Douglas County Emergency Management Agency Civic Center, EOC, Room 114 1819 Farnam Street Omaha, NE 68183 Todd Baber Emergency Management Agency Harrison County 111 South 1st Avenue Logan, IA 51546-1305 Terry Baxter, Sheriff Harrison County 111 South 1st Avenue Logan, IA 51546 Rolland Roberts, Chairman Harrison County Board of Supervsiors 111 North 2nd Avenue Logan, IA 51546 The Honorable Doris Stillwell Mayor of Missouri Valley

Omaha Public Power District-3-City Hall 223 E. Erie Missouri Valley, IA 51555 Terry Hummel, Coordinator Pottawattamie County Emergency Management Coordinator 227 S. 6th Street, Court House Council Bluffs, IA 51501 Loren Knauss, Chairman Pottawattamie County Board of Supervisors 227 South 6th Street Council Bluffs, IA 51501 Mike Robinson, Sheriff Washington County Courthouse 16th and Colfax Blair, NE 68008 Gary Fanoele, President Blair City Council 218 S. 16th Street Blair, NE 68008 The Honorable Jim Realph Mayor of Blair 218 South 16th Street Blair, NE 68008 The Honorable Paul Oestmann Mayor of Fort Calhoun P.O. Box 394 Fort Calhoun, NE 68023 David Genoways, President Fort Calhoun City Council P.O. Box 577 Fort Calhoun, NE 68023 Bill Pook, Director Region 5/6 Emergency Management 435 N. Park Avenue, Suite 400 Fremont, NE 68025 Dick Hainje, Regional Director Federal Emergency Management Agency Region VII 9221 Ward Parkway, Suite 300 Kansas City, MO 64114-3372 Dianne Munns, Chairperson Department of Commerce Utilities Division Iowa Utilities Board 350 Maple Street Des Moines, IA 50319-0069 Donald A. Flater, Chief Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th floor 321 East 12th Street Des Moines, IA 50319 Robert Leopold, Administrator Nebraska Health and Human Services Division of Public Health Assurance Department of Regulation and Licensure 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 John Blackhawk Tribal Chairman Winnebago Tribe of Nebraska P.O. Box 687 Winnebago, NE 68071-0687 Donald Grant Tribal Chairperson Omaha Tribal Council P.O. Box 368 Macy, NE 68039-0368 Al Berndt, Assistant Director Nebraska Emergency Management Agency 1300 Military Road Lincoln, NE 68508-1090 Joe l. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Omaha Public Power District-4-Fort Calhoun, NE 68023-0550 David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.

Washington, DC 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Omaha Public Power District-5-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (JDH1)

Resident Inspector (LMW1)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPS1)

T. Bergman, Chief, TRPS, OEDO (TAB)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

A. Wang, NRR Project Manager for FCS (ABW)

RidsNrrDirslpab SUNSI Review Completed: _dng__ ADAMS: : Yes G No Initials: __dng__

Publicly Available G Non-Publicly Available G Sensitive
Non-Sensitive S:\\DRP\\DRPDIR\\EOC 05\\Assessment Letters\\FCS.wpd RIV:C:DRP/E D:DRS D:DRP DNGraves;mjs DDChamberlain ATHowell III VGGaddy for RJCaniano for /RA/

2/23/06 2/23/06 2/24/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Fort Calhoun Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2006 08:31:35 Report 22

EB1-REPL

- EQUIP REPLACEMENT ACTIVITIES & ISI Other Routine 01/01/2006 12/29/2006

50001 IP Steam Generator Replacement Inspection Safety Issues 01/01/2006 12/29/2006

50003 IP Pressurizer Replacement Inspection Other Routine 01/01/2006 12/29/2006

71007 IP Reactor Vessel Head Replacement Inspection Baseline Inspections 01/01/2006 12/29/2006

7111108P IP Inservice Inspection Activities - PWR

EB-FCS-1

- PHASE ONE - MAJOR EQUIPMENT REPLACEMENTS Other Routine 03/06/2006 03/17/2006

50001 IP Steam Generator Replacement Inspection Safety Issues 03/06/2006 03/17/2006

50003 IP Pressurizer Replacement Inspection Other Routine 03/06/2006 03/17/2006

71007 IP Reactor Vessel Head Replacement Inspection

FCS-2

- PHASE 2 FCS REPLACEMENT ACTIVITIES Other Routine 07/10/2006 07/21/2006

50001 IP Steam Generator Replacement Inspection Safety Issues 07/10/2006 07/21/2006

50003 IP Pressurizer Replacement Inspection Other Routine 07/10/2006 07/21/2006

71007 IP Reactor Vessel Head Replacement Inspection

EB2-07B

- HX PERFORMANCE Baseline Inspections 05/01/2006 05/05/2006

7111107B IP Heat Sink Performance

RP TEAM

- RP SAFETY TEAM Baseline Inspections 05/08/2006 05/12/2006

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 05/08/2006 05/12/2006

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 05/08/2006 05/12/2006

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/08/2006 05/12/2006

7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program

BRQ SIM

- BIENNIAL RQ SIM ONLY Baseline Inspections 06/19/2006 06/23/2006

7111111B IP Licensed Operator Requalification Program

EP2

- EMERG PREP PROGRAM Baseline Inspections 06/19/2006 06/23/2006

7111402 IP Alert and Notification System Testing Baseline Inspections 06/19/2006 06/23/2006

7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/19/2006 06/23/2006

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/19/2006 06/23/2006

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/19/2006 06/23/2006

71151 IP Performance Indicator Verification

OB-RQ

- FCS REQUALIFICATION INSP Baseline Inspections 08/07/2006 08/11/2006

7111111B IP Licensed Operator Requalification Program

EB1-2/17

- PERMANENT MODS/50.59 Baseline Inspections 08/07/2006 08/11/2006

7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/07/2006 08/11/2006

7111117B IP Permanent Plant Modifications

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 09/11/2006 09/15/2006

7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Fort Calhoun Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2006 08:31:35 Report 22

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 09/11/2006 09/15/2006

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/11/2006 09/15/2006

71151 IP Performance Indicator Verification

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 09/25/2006 09/29/2006

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/25/2006 09/29/2006

7112102 IP ALARA Planning and Controls Baseline Inspections 09/25/2006 09/29/2006

71151 IP Performance Indicator Verification

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 11/27/2006 12/01/2006

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/27/2006 12/01/2006

7112102 IP ALARA Planning and Controls Baseline Inspections 11/27/2006 12/01/2006

71151 IP Performance Indicator Verification

EB2-12B

- MAINTENANCE RULE INSPECTION Baseline Inspections 04/16/2007 04/20/2007

7111112B IP Maintenance Effectiveness

EB1-21

- CDB Baseline Inspections 05/21/2007 05/25/2007

7111121 IP Component Design Bases Inspection Baseline Inspections 06/04/2007 06/15/2007

7111121 IP Component Design Bases Inspection

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 06/11/2007 06/15/2007

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/11/2007 06/15/2007

7112102 IP ALARA Planning and Controls Baseline Inspections 06/11/2007 06/15/2007

71151 IP Performance Indicator Verification

EXAM

- INITIAL EXAM Not Applicable 07/02/2007 07/06/2007

X02354 FCS - INITIAL EXAM (08/07)

Not Applicable 08/06/2007 08/10/2007

X02354 FCS - INITIAL EXAM (08/07)

RP-ORS

- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 07/16/2007 07/20/2007

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/16/2007 07/20/2007

7112102 IP ALARA Planning and Controls Baseline Inspections 07/16/2007 07/20/2007

71151 IP Performance Indicator Verification

EB2-52B

- PIR TEAM INSPECTION Baseline Inspections 08/27/2007 08/31/2007

71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007

71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.