ML20217G926

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted
ML20217G926
Person / Time
Site: Fort Calhoun 
Issue date: 10/15/1999
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20217G933 List:
References
50-285-99-10, NUDOCS 9910220016
Download: ML20217G926 (5)


See also: IR 05000285/1999010

Text

l

.

.

f ""%y

t$

UNITED STATES

J

t

NUCLEAR REGULATORY COMMISSION

E

E

II.

gj

REGloN IV

611 RYAN PLAZA DRIVE, sulTE 400

y,g

ARLINGTON, TEXAS 760118064

October 15, 1999

S K. Gambhir, Division Manager

Nuclear Operations

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

l

P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

SUBJECT: NRC INSPECTION REPORT NO. 50-285/99-10

Dear Mr. Gambhir:

This refers to the inspection conducted on September 13-17,1999, at the Fort Calhoun Station

facility. The results were discussed with Mr. R. Short and other members of your staff. The

enclosed report presents the results of this inspection.

Based on the results of this inspection, the NRC found that, with the exception of one noncited

violation discussed below and the associated examples of untimely monitoring of Maintenance

Rule Functional Group performance, the portion of the Maintenance Rule Program reviewed in

this inspection was implemented in accordance with the requirements of your license.

The NRC has determined that three examples of one violation of NRC requirements occurred.

This violation is being treated as a noncited violation, consistent with the interim Enforcement

Policy for pilot plants. This noncited violation is described in the subject inspection report. If

you contest the violation or severity level of the noncited violation, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

,

the Nuclear Regulatory Commission, ATTN: Document Co.itrol Desk, Washington DC 20555-

{

0001; with a copies to the Regional Administrator, Region IV; the Director, Office of

1

Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001;

{

and the NRC Resident inspector at the Fort Calhoun Station facility.

j

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

9910220016 991015

PDR

ADOCK 05000285

G

PDR

-

,

.

Omaha Public Power District

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

h,

/

y

Dr. Dale A. Powers, Chief

Engineering and Maintenance Branch -

Division of Reactor Safety

Docket No.:

50-285

License No.: DPR-40

Enclosure:

NRC Inspection Report No.

50-285/99-10

cc w/ enclosure:

Mark T. Frans, Manager

Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023 0309

James W. Chase, Division Manager

Nuclear Assessments

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

J. M. Solymossy, Manager - Fort Calhoun Station

Omaha Public Power District

Fort Calhoun Station FC-1-1 Plant

>

P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023

Perry D. Robinson, Esq.

Winston & Strawn

1400 L. Street, N.W.

Washington, D.C. 20005-3502

-

,

.

O

LOm^h.i Public Power District

-3-

Chairnan .

Washington County Board of Supervisors.,

Blair, Nebraska 68008

Cheryl K. Rogers, Pregram Manager

Nebraska Health ar.r : .una, Services System

Division of Public Her,ith Assurance

Consumer Services Section

301 Centennial Mall,' South

P.O. Box 95007

Lincoln, NE 68509-5007

.

i'

l

I

{

!

t

f,.

)

e

' Omaha Public Power District '

-4

E-Mail report to D. Lange (DJL)

.

' E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail all documents to Jim Isom for Pilot Plant Program (JAI)

E-Mail all documents to Sampath Malur for Pilot Plant Program (SKM)

bec to DCD (IE01)

bec distrib by RIV:

Regional Administrator

RIV File

DRP Director

RITS Coordinator

DRS Director

Resident inspector

Branch Chief (DRF/C)

Project Engineer (DRP/C)

1

)

\\

i

. DOCUMENT NAME: R:\\_FCS\\FC910RP.CAC,wpd

To receive copy of document, indicate in box: "C' = Copy without enclosures "E" = copy with enclosures "N" = No copy

RIV:RI:DRS

C:EMB

E

C:PBC '

,

C:EMB

CAClark/Im@G- DAPowers. ?

CMarschallCM'S DAPowers , P

_

10//f99

10/#99

"\\

10/499

106/99

'

OFFICIAL RECORD COPY

j

,

..

.

Omaha Public Power District

-4-

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E Mail all documents to Jim Isom for Pilot Plant Program (JAI)

E-Mail all documents to Sampath Malur for Pilot Plant Program (SKM)

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator

RIV File

DRP Director

RITS Coordinator

DRS Director

Resident inspector

Branch Chief (DRP/C)

'

Project Engineer (DRP/C)

DOCUMENT NAME: R:\\_FCS\\FC910RP.CAC.wpd

To receive copy of document, Indicato in box: 'C" = Copy without enclosures "E" = Copy with enciosures "N" = No copy

RIV:RI:DRS

C:EMB

E

C:PBC

,

C:EMB

l

l

CAClark/ImtCd6 DAPowers t, p

CMarschallCM DAPowers tif

10//'/99

10AV99 M

10/699

10(499

'

_

OFFICIAL RECORD COPY

,