March 4, 2003
SUBJECT:
ANNUAL ASSESSMENT LETTER - FORT CALHOUN STATION (REPORT 50-285/03-01)
Dear Mr. Ridenoure:
On February 6, 2003, the NRC staff completed its end-of-cycle plant performance assessment of the Fort Calhoun Station. The end-of-cycle review for the Fort Calhoun Station involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Fort Calhoun Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on a White finding in the Public Radiation cornerstone. This finding involved radiation levels that exceeded required levels on the external surface of a shipment package. Your staff determined that no members of the public came in close proximity to the package during shipment; therefore, the shipment did not present an immediate safety concern to members of the public. Your staff took immediate corrective actions in response to this finding. This included performing investigations, reviews, and self-assessments. A supplemental inspection in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, was performed in August 2002 to assess the adequacy of your evaluation and to review the corrective actions you have taken. Your efforts in this matter were determined to be satisfactory.
The enclosed inspection plan details the inspections scheduled through March 31, 2004. In addition to the baseline inspection program, Temporary Instruction 2515/150, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02), will be performed at Fort Calhoun Station during this inspection cycle. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident
Omaha Public Power District-2-inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the midcycle review meeting.
As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections and conduct portions of the security baseline inspection program, as well as perform additional inspections to evaluate your compliance with new requirements that may be ordered. Based on our final determinations in this regard, we will notify you of any inspection plan changes.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Claude Johnson at (817) 860-8282 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects Docket: 50-285 License: DPR-40 Enclosure:
Fort Calhoun Station Inspection/Activity Plan cc w/enclosure:
John B. Herman, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, Nebraska 68023-0550
Omaha Public Power District-3-Richard P. Clemens, Division Manager Nuclear Assessments Fort Calhoun Station P.O. Box 550 Fort Calhoun, Nebraska 68023-0550 David J. Bannister, Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, Nebraska 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, Nebraska 68008 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, Iowa 50309 Timothy F. Dunning, Sheriff Douglas County Hall of Justice 17th and Farnam Omaha, Nebraska 68102 Carole Woods-Harris, Chairman Douglas County Board of Commissioners Civic Center 1819 Farnam Omaha, Nebraska 68183
Omaha Public Power District-4-Steve Lee, Director Douglas County E M Civic Center EOC, Room 114 Omaha, Nebraska 68183 Todd Baber Emergency Management Coordinator Harrison County 111 South 1st Avenue Logan, Iowa 51546-1305 Terry Baxter, Sheriff Harrison County Sheriff's Department Logan, Iowa 51546 Larry King, Chairman Harrison County Board of Supervsiors Court House Logan, Iowa 51546 James Long, Mayor City of Missouri Valley City Hall 223 E. Erie Missouri Valley, Iowa 51555 Terry Hummel Emergency Management Coordinator Pottawattamie County 227 S. 6th Street, Court House Council Bluffs, Iowa 51501 Melvin Houser, Chairman Pottawattamie County Board of Supervisors 227 South 6th Street Council Bluffs, Iowa 51501 Bill Pook, Civil Defense Director Region 5/6 Washington County Courthouse P.O. Box 466 Blair, Nebraska 68008 Mike Robinson, Sheriff Washington County Courthouse
Omaha Public Power District-5-1535 Culfax Blair, Nebraska 68008 John Shotwell, President Blair City Council 218 S. 16th Street Blair, Nebraska 68008 Jim Realph, Mayor City of Blair 218 South 16th Street Blair, Nebraska 68008 Paul Oestmann, Mayor City of Fort Calhoun P.O. Box 448 Fort Calhoun, Nebraska 68023 David Genoways, President Fort Calhoun City Council P.O. Box 448 Fort Calhoun, Nebraska 68023 Bill Pook Civil Defense Director Region 5/6 435 N. Park Avenue, Room B101 Fremont, Nebraska 68025 Dick Hainje, Regional Director Federal Emergency Management Agency Region VII 2323 Grand Blvd., Suite 900 Kansas City, Missouri 64108-2670 Dianne Munns, Chairman Department of Commerce Utilities Division Iowa Utilities Board 350 Maple Street Des Moines, Iowa 50319 Donald A. Flater, Chief Bureau of Environmental Health, 5th floor Iowa Department of Public Health 401 SW 7th, Suite D Des Moines, Iowa 50309
Omaha Public Power District-6-Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65102 Robert Quinn, Executive Director Missouri Public Service Commission P.O. Box 360 Jefferson City, Missouri 65102 Robert Leopold, State Liaison Officer Nebraska Health and Human Services Department of Regulation and Licensure Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Institute of Nuclear Power Operations (INPO)
700 Galleria Parkway SE Atlanta, Georgia 30339-5943
Omaha Public Power District-7-Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (JGK)
Branch Chief, DRP/C (CEJ1)
Senior Project Engineer, DRP/C (WCW)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
Jim Isom, Pilot Plant Program (JAI)
RidsNrrDipmLipb V. L. Dricks, PAO (VLD)
W. A. Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (TWP, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)
R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)
B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
S. Morris, Acting Chief, Regional Operations Staff, OEDO (SAM1)
H. Berkow, NRR Project Director (HNB)
S. Dembek, Chief, Section 2, NRR/DLPM (SXD)
A. Wang, NRR Project Manager (ABW)
S:\\DRP\\DRPDIR\\EOC 2003\\Assessment Letters\\FCS.wpd RIV:C:DRP/C D:DRS D:DRP CEJohnson;df DDChamberlain ATHowell
/RA/
/RA/
/RA/
2/27/03 2/28/03 2/28/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Fort Calhoun Inspection / Activity Plan 03/02/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/05/2003 07:36:18 Report 22
EMB
- PERMANENT MODS Baseline Inspections 03/17/2003 03/21/2003 Permanent Plant Modifications IP 7111117B
6 OB-PIR
- FC PIR INSPECTION Baseline Inspections 04/14/2003 05/02/2003 Identification and Resolution of Problems IP 71152B
3 PSB-EP1
- EP EXERCISE BASELINE INSPECTION Baseline Inspections 06/23/2003 06/27/2003 Exercise Evaluation IP 7111401
Baseline Inspections 06/23/2003 06/27/2003 Emergency Action Level and Emergency Plan Changes IP 7111404
Baseline Inspections 06/23/2003 06/27/2003 Performance Indicator Verification IP 71151
1 PSB-S1
- SECURITY BASELINE INSPECTION Baseline Inspections 08/11/2003 08/15/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizati IP 7113002
Baseline Inspections 08/11/2003 08/15/2003 Response to Contingency Events (Protective Strategy and Implementation of Protective Stra IP 7113003
Baseline Inspections 08/11/2003 08/15/2003 Performance Indicator Verification IP 71151
1 TI-150
- RPV AND VESSEL HEAD PENET. NOZZLES Safety Issues 09/12/2003 10/12/2003 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 IP 2515/150
1 ACCESSPI
- ACRSA/PI Baseline Inspections 09/29/2003 10/03/2003 Access Control to Radiologically Significant Areas IP 7112101
Baseline Inspections 09/29/2003 10/03/2003 Performance Indicator Verification IP 71151
2 EMB
- ISI/SG INSPECTION Baseline Inspections 10/20/2003 10/24/2003 Inservice Inspection Activities - PWR IP 7111108P
5 EMB
- SSD & PC Baseline Inspections 11/03/2003 11/07/2003 Safety System Design and Performance Capability IP 7111121
Baseline Inspections 11/17/2003 11/21/2003 Safety System Design and Performance Capability IP 7111121
1 EMB
- 50.59 Baseline Inspections 11/03/2003 11/07/2003 Evaluation of Changes, Tests, or Experiments IP 7111102
1 ALARA3
- ALARA PLANNING AND CONTROLS Baseline Inspections 12/08/2003 12/12/2003 ALARA Planning and Controls IP 7112102
4 OB-IN
- INITIAL EXAM Not Applicable 02/09/2004 02/13/2004 FT. CALHOUN - INITIAL EXAM (03/04)
X02259
Not Applicable 03/15/2004 03/19/2004 FT. CALHOUN - INITIAL EXAM (03/04)
X02259
1 EMB
- HX PERFORMANCE TESTING Baseline Inspections 03/01/2004 03/05/2004 Heat Sink Performance IP 7111107B
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.