Discusses Util Response to Generic Ltr 89-08, Erosion/ Corrosion-Induced Pipe Wall Thinning, & Advises That Licensee Maintain,In Auditable Form,Records of Program
ML20246D552
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/23/1989
From: Bournia A
Office of Nuclear Reactor Regulation
To: Morris K
OMAHA PUBLIC POWER DISTRICT
References
GL-89-08, GL-89-8, TAC-73486, NUDOCS 8908280183
Download: ML20246D552 (3)


Text

_- - _ __ - __ _ . _ _ . _ - _ - _

q.

1 1

r o .j

< - August 23, 1989

! Docket No.I 502285 i

Mr.-Kenneth J.sMorris Division-Manager.-. Nuclear Operations Omaha Public Power District

1625 Harney Street.

.0maha, Nebraska 68102

Dear Mr. Morris:

SUBJECT:

RESPONSE TO GENERIC LETTER 89-08, " EROSION / CORROSION-INDUCED PIPE WALL THINNING'l (TAC NO. 73486)

On May 2,.1989, the Commission issued Generic Letter (GL) 89-08 dealing with

' pipe wall thinning. induced by erosion / corrosion. In this. letter, we requested the implementation of a:long-term erosion / corrosion monitoring program that will provide assurance that procedure or administrative controls are in place to

~

assure that the NUMARC program or another equally effective program is implemented to assure the structural integrity of all high energy carbon steel systems.

By letter dated' July.20, 1989,'you responded to our GL for the Fort Calhoun Station by describing the program in progress, the Administrative Controls and procedures, the NUMARC and EPRI programs that have been or will be implemented, i and the engineering' activities performed and updated to provide an adequate response.to GL 89-08. Your response provides assurance that erosion / corrosion will not degrade the pressure boundary to below the applicable code-design value. This fulfills your requirements in responding to GL 89-08. You should maintain, in auditable form, records of your program and the results of your implementation of the program. These records may be subject to future auditing.

'.This completes our effort under TAC No. 73486.

Sincerely,

/s/ q r: Anthony Bournia, Project Manager P

Doh$Nho!ssf PNV g Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page  ;

1 DISTRIBUTION NRC PDR Local PDR PD4 Reading l

@ Docketgjle@ F. Hebdon P. Noonan l G. Holahan ADR4 E

OGC-Rockville A. Bournia E. Jordan B. Grimes ACRS(10) PD4 Plant File I L

DOCUMENT NAME: FC LTR/73486 ' b
  • SEE PREVIOUS CONCURRENCES

.PD4/LA* PD4/PM* EMCB* PD4/D PNoonan ABournia:bj CYCheng

'08/21/89 08/21/89 08/21/89 FHebdon h .

08/2.5/89

m'b,..um-.'D UNITED STATES

'l,fy, ;

' *]J r 9; "

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

%- ,. ,/ , August 23, 1989 Docket No. 50-285

.Mr. Kenneth J. Morris Division Manager - Nuclear Operations, 0maha Public' Power District 1625 Harney' Street Omaha, Nebraska 68102 iecar Mr. Morris:

. WJECT: RESPONSE TO GENERIC LETTER 89-08, " EROSION / CORROSION-INDUCED' PIPE.WALLTHINNING"(TACNO.73486)

.On May 2, 1989, the' Commission issued Generic' Letter (GL) 89-08 dealing with pipe wall thinning induced by. erosion / corrosion. In this letter, we. requested the implementation of a long-term erosion / corrosion monitoring program.that will provide assurance that procedure or administrative controls are in place to assure that the NUMARC program or another equally effective program is implemented

'to assure the. structural integrity of all high energy carbon steel systems.

By letter dated' July 20,1989,'you responded to our GL for the Fort Calhoun Station by describing the program in ;. ogress, the Administrative' Controls and procedures, the NUMARC and EPRI programs that have been or will be iirplemented, and the engineering activities performed and updated to provide an adequate response to GL 89-08. Your response provides assurance that erosion / corrosion will not' degrade the pressure boundary to below the applicable code design value. .This fulfills your requirements in responding to GL 89-08. You should maintain, in~ auditable form, reccrds of your program and the results of your implementation of the program. These records may be subject to future auditing.

This completes our effort under TAC No. 73486.

Sincerely, Q j. pa ., Ib aa t u s Anthony Bournia, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of NJclear Reactor Regulation cc: See next page o__ _ _

~- @ ] ' ..

9l ;; .

I Mr.c Ken'neth J. Morris .

' Fort Calhoun Station f t 0maha~Public Power-District. Unit No._l'

'CC:

. Harry H. Voigt, Esq.

tLeBoeuf, Lamb, Leiby & MacRae 1333.New Hampshire'. Avenue, NW Washington...D.C.20036

' Mr. Jack Jensen, Chairman Washington County Board-

of Supervisors:

" 'Blair, Nebraska68008-Mr.' Phillip'Harrell, Resident Inspector;

'U.S. Nuclear Regulatory Commission P. O. Box 309' Fort Calhoun, Nebraska 68023 Mr.. Charles <B. Brinkman, Manager.

Washington Nuclear Operations.

Combustion Engineering, Inc.

12300'Twinbrook Parkway, Suite 330 Rockville, MD: 20852

. Regional Administrator, Region IV 10.S. Nuclear Regulatory Commission

-Office of Executive Director

~for Operations 611 Ryan Plaza Drive, Suite 1000.

Arlington, Texas 76011 Harold Borchert, Director

' Division'of Radiological Health Department of Health 301. Centennial Mall, South P.O. Box'95007 Lincoln, Nebraska .68509 Mr.'G.:R. Peterson, Manager

~ Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023