Forwards Insp Rept 50-285/89-28 on 890701-31.No Violations or Deviations Noted.One Unresolved Item Identified
ML20247B419
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/29/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20247B425 List:
References
NUDOCS 8909130025
Download: ML20247B419 (2)


See also: IR 05000285/1989028

Text

__ __ _

,

7 -_-

, . -

. - 'g .

(In Reply' Refer To: _

Docket
50-285/89-28

..

Omaha Public Power District-

~ ATTN: Mr. Kenneth J. Morris, Division Manager

Nuclear Operations

444. South 16th Street Mall

Omaha Nebraska 68102-2247

Gentlemen:

2 This refers to the inspection conducted by Messrs. P. H. Harrell and T. Reis of

< this office during' the period July 1-31, 1989, of activities authorized by NRC

Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of

'

our findings'with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the. inspection included review of previously identified

items; licensee event report followup; operational safety verification; plant

tours; monthly maintenance observations; monthly surveillance observations;

security observations; radiological protection observations; in-office review-

.of- periodic, special, and nonroutine event reports; emergency preparedness; and

the Systematic. Assessment cf Licensee Performance public meeting. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel', and observations by the

inspectors. The. inspection findings are documented in the enclosed inspection

report.

Within the scope of the inspection, no violations or deviations were -

identified. ,

One unresolved item is identified in. paragraph 5 of the enclosed inspection.

report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

James L. Milboan, Director

Division of Reactor Projects

cc w/ enclosure: (see next page) q

D:, U h

'MIV:RI

TReis/nc

PHHarrell

  • DRP/B

RPMullikin

  • C:DRP/B

TFWesterman JLMidoan$lI

/ /89 / /89 / /89 / /89 /89 h

  • previously concurred

8909130025 890829

{DR ADOCK 05000285

.

FDC .

. _ - . _ _ _ - _ - - _ _ _ . . .__ _-_- - - - _ - - - - - - - - - - - - - _ - . - - _ - -

.

L,., e

p .a.

.

.'

Omaha Public' Power District -2-

Enclosure:

Appetidix - NRC Inspection Report

50-285/89-28

cc w/ enclosure:

G. R. Peterson, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D.C. 20036

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec'distrib. by RIV:

R. D. Martin, RA * MIS System

  • Section Chief (DRP/B) *DRP
  • RIV File ~ * Project Engineer (DRP/B)
  • RSTS Operator *A. Bournia, NRR Project Manager (MS 13-D-14)

Lisa Shea, RM/ALF *RRI

  • DRS *RPB-DRSS
  • w/766

-_