ML20247B419
| ML20247B419 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/29/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20247B425 | List: |
| References | |
| NUDOCS 8909130025 | |
| Download: ML20247B419 (2) | |
See also: IR 05000285/1989028
Text
7 -_-
__
__
_
,
, .
-
. -
'g
.
(In Reply' Refer To: _
- Docket
- 50-285/89-28
..
Omaha Public Power District-
~ ATTN:
Mr. Kenneth J. Morris, Division Manager
Nuclear Operations
444. South 16th Street Mall
Omaha Nebraska 68102-2247
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell and T. Reis of
2
< this office during' the period July 1-31, 1989, of activities authorized by NRC
Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of
our findings'with you and other members of your staff at the conclusion of the
'
inspection.
Areas examined during the. inspection included review of previously identified
items; licensee event report followup; operational safety verification; plant
tours; monthly maintenance observations; monthly surveillance observations;
security observations; radiological protection observations; in-office review-
.of- periodic, special, and nonroutine event reports; emergency preparedness; and
the Systematic. Assessment cf Licensee Performance public meeting. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel', and observations by the
inspectors. The. inspection findings are documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were -
identified. ,
One unresolved item is identified in. paragraph 5 of the enclosed inspection.
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
James L. Milboan, Director
Division of Reactor Projects
cc w/ enclosure:
(see next page)
q
h
JLMidoan$l
D:, U
'MIV:RI
- DRP/B
- C:DRP/B
I
TReis/nc
PHHarrell
RPMullikin
TFWesterman
h
/ /89
/ /89
/ /89
/ /89
/89
- previously concurred
8909130025 890829
{DR
ADOCK 05000285
FDC
.
.
.
. _ - . _ _ _ - _ - - _ _ _
.
.
.__
_-_-
- - - _ - - - - - - - - -
- - - - _ - . - - _ - -
L,.,
e
p
.a.
.
.'
Omaha Public' Power District
-2-
Enclosure:
Appetidix - NRC Inspection Report
50-285/89-28
cc w/ enclosure:
G. R. Peterson, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D.C.
20036
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec'distrib. by RIV:
R. D. Martin, RA
- MIS System
- Section Chief (DRP/B)
- DRP
- RIV File ~
- Project Engineer (DRP/B)
- RSTS Operator
- A. Bournia, NRR Project Manager (MS 13-D-14)
Lisa Shea, RM/ALF
- RRI
- DRS
- RPB-DRSS
- w/766
-_