ML20248C490
| ML20248C490 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/22/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| References | |
| EA-89-159, NUDOCS 8910030480 | |
| Download: ML20248C490 (4) | |
See also: IR 05000285/1989010
Text
_ _ . _ _ _
i
.,
'O
[.* 1,7
SEP 2 21989
In Reply Refer To:
Docket:
50-285
j
!
_
Omaha Public. Power District
. ATTN:
Kenneth J. Morris, Division Manager
-Nuclear Operations
444 South 16th Street Mall
' Omaha, Nebraska. 68102-2247
Gentlemen:
This refers to the enforcement conference conducted at our request in the
Region IV office on August 28, 1989. This meeting related to activities
authorized by NRC' License No. DPR-40 for Fort Calhoun Nuclear Station and was
.
attended by Mr. W. C. Jones and members of his staff.
The subjects" discussed at this meeting are described in the enclosed meeting
summary.
It is our ' opinion that this meeting was beneficial and has provided a better
understanding of the issues involved.
In accordance with Section'2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a ' copy of this letter will be placed in
the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be-pleased to
discuss them with you.
Sincerely,
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
Meeting Summary
i'
cc w/ enclosure:
-Fort Calhoun Station
ATTN:
G. R. Peterson, Manager
P.O. Box 399
Fort'Calhoun, Nebraska 68023
(h
-
DAPowrs[
C:SEP-
C:RPB
E0$k
D:0RP
RIl " PS
BMurray
9
SahBien
JLMi
an
ABii
st/cd
{/ /1/89
9////89
[
/89
gg/89
q/4}/89 y4
9
8910030480 89o922
$DR
ADOCK 05000295
,
PNU
_____ _ _-__-_____-_-_ - -
-
--
\\
v
..
.
~
..
..
Omaha Public Power District
-2-
cc's Cont'd:
Harry H. Voigt Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Nebraska Radiation Control Program Director
Nc:
@MB (IE45)
R. D. Martin, RA
Resident Inspector
Lisa Shea, RM/ALF
RPB-DRSS
Section Chief, DRP/B
MIS System
RIV File
RSTS Operator
Inspector
Section Chief
B. Murray
B. Beach
Project Engineer, DRP/B
A. Bournia, NRR Project Manager
J. Lieberman, OE
G. Sanborn
i
l
l
l
l
.__________-_a
_ _ _ _ _
_
~\\
m,
.
( :.
,
l.
ENFORCEMENT CONFERENCE SUMMARY
L
-Licensee:
Omaha Public Power District
l
l
Facility:
Fort Calhoun Nuclear Station
l
License No.:
Docket No.:
.50-285
Subject:
APPARENT VIOLATIONS RELATED TO THE PHYSICAL SECURITY PROGRAM
On August 28, 1989, representatives of Omaha Pua ic Power District met with
l
Region IV personnel in Arlington, Texas, to discuss the apparent violations
I
discussed in Inspection Reports 50-285/89-10 and 89-31. An attendance list is
i
attached. All of the apparent violations were identified and reported by the
licensee.
During the conference, the licensee discussed a recent security
event,that occurred after the last inspection.
In the meeting,'the licensee assured the NRC staff that the apparent
violations have been corrected and that the licensee was in full compliance
with the subject regulatory requirements. The licensee addressed each of the
potential enforcement items. individually and briefed the regional staff on the
actions OPPD had taken to ensure that the apparent violations will not recur.
The apparent violations discussed included:
l
Inadequate Access Control - Packages: An unauthorized weapon was
introduced into the Protected Area.
Inadequate Compensatory Measures:
Compensatory actions related to vital
area door alarms were not initiated as required. Also, a compensatory
officer was discovered asleep at his cost.
Inadequate Protection of Safeguards Information: There have been
multiple examples where safeguards information has not been adequately
protected. These examples included safeguards containers that had been
left open and unattended and safeguards information hat had been left
unsecured and unattended overnight.
---
Am
ue. rm -
-
Physical Security Ins ctor
,
Attachment:
Attendance List
_ _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -
_ - _ - _ _ _ - _
-
.
- -.
a..,-y
,
. .
'*-....n
,
.
r
i
ATTENDANCE LIST
Attendance at the Omaha Public Power District /NRC meeting on August-28, 1989,.
- at the NRC Region IV office.
_
' OPPD
.W. Jones, Senior Vice President
K. Morris, Division Manager, Nuclear Operations
J. Sefick, Manager, Security Services-
E. Morris, Security . Training Supervisor
B. Kindred,' Security Operations Supervisor
I
NRC
A. Beach, Director,. Division of Radiation Safety and Safeguards
R. Rosano, Office of Enforcement
-
D. Powers, Chief, Security and Emergency Preparedness Section
T. Wes.terman, Chief, Reactor Projects Section B
G. Sanborn, Enforcement Officer
.
B. Earnest, Physical Security Inspector
.
I
1
l
l
l.
,
i
l.
_- _ -____-
_-_ _ __ _ - - ___ __ -