Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2)
ML20211J923
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/02/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Gambhir S
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20211J928 List:
References
TAC-MA4968, NUDOCS 9909070065
Download: ML20211J923 (3)


Text

, ..: i September 2, 1999 Mr. S. K. Gambhir Division Manager- Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

. Post Office Box 399 Hwy. 75 - North of Fort Calhoun

. Fort Calhoun, Nebraska 68023-0399 SL*BJECT: FORT CALHOUN STATION, UNIT NO 1 - EVALUATION OF THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUESTS FOR RELIEF (TAC NO. MA4968) )

Dear Mr. Gambhir:

By letter dated March 1,1999. Omaha Public Power District (OPPD) submitted two requests for relief related to the third 10-year inservice inspection (ISI) interval for the Fort Calhoun Station, Unit No.1. The rel.ief requests propose alternatives to requirements in ASME Boiler and Pressure Vessel Code Section XI,1989 Edition, paragraphs IWA-5242(a) and IWA-5250(a)(2).

Paragraph IWA-5242(a) requires removal of insulation and inspection of bolted connections in systems that are borated for the purpose of controlling reactivity. Paragraph IWA-5250(a)(2) requires removal and examination of bolts if leakage occurs in pressure-retaining bolted connections. The staff's evaluation and conclusions are contained in the enclosed safety evaluation. The staff finds that the proposed alternatives provide an acceptable level of quality and safety and therefore, pursuant to 10 CFR 50.55a(s)(3)(i) the proposed alternatives are authorized for the remainder of the third 10-year ISI interval.

Sincerely, SIGNED: L. Raghavan for Stephen Dembek, Chief, Section 2.

Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION Docket File SBailey PUBLIC bn'" rg9 GHill(2)

PDIV-2 Reading RScholl(e-mail SE)

SRichards(clo) CMarschall, RGN-IV /'

A RS bNI#DM To receive a cei,y or mis Gecy.T r.i ir.G;c_; v in the Dox

,,o 3r OFFICE - PDIL-W C PDIV-2/LA @b/BC OG N PDIV-2/Sfr ,

NAME RMrb:rb EPeyfDE hN Mg/gpg// SDeb [

DATE 8 / jf /99 2/ IS /99 f / /T /99 f//I/99 M /2S /99 DOCUMENT NAME: G:\PDIV-2\FortCalhoun\REL4968.wpd

. OFFICIAL RECORD COPY

~

9909070065 990902 ADOCK 05000285 PDR G PDR

pa ctxuq p *, UNITED STATES j

t NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001

\*****/ September 2, 1999 Mr. S. K. Gambhir Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

FORT CALHOUN STATION, UNIT NO.1 - EVALUATION OF THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUESTS FOR RELIEF (TAC NO. MA4968)

Dear Mr. Gambhir:

By letter dated March 1,1999, Omaha Public Power District (OPPD) submitted two requests for relief related to the third 10-year inservice inspection (ISI) interval for the Fort Calhoun Station, Unit No.1. The relief requests propose alternatives to requirements in ASME Boiler and Pressure Vessel Code Section XI,1989 Edition, paragraphs IWA-5242(a) and IWA-5250(a)(2).

Paragraph IWA-5242(a) requires removal of insulation and inspection of bolted connections in systems that are borated for the purpose of controlling reactivity.- Paragraph IWA-5250(a)(2) requires removal and examination of bolts if leakage occurs in pressure-retaining bolted connections. The staff's evaluation and conclusions are contained in the enclosed safety evaluation. The staff finds that the proposed alternatives provide an acceptable level of quality and safety and therefore, pursuant to 10 CFR 50.55a(a)(3)(i) the proposed alternatives are authorized for the remainder of the third 10-year ISI interval.

Sincerely, i

A ' __

Stephen Dembek, Chief, Section 2 Project Directorate IV & Decom.nissioning Division of Licensing Project Mr.nagement Office of Nuclear Reactor Reg Jlation Docket No. 50-285

Enclosure:

Safety Evaluation cc w/ encl: See next page i

E.. ,

f. . .

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn ' )

ATTN: Perry D. Robinson, Esq.  !

1400 L Street, N.W. . J Washington, DC' 20005-3502 L

Mr. Jack Jensen, Chairman Washington County Board

'of Supervisors Blair, Nebraska 68008

< Mr. Wayne Walker, Resident inspector U.S. Nuclear Regulatory Commission .

Post Office Box 309 Fort Calhoun, Nebraska 68023 L ' Regional Administrator, Region IV

. U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

' Arlington, Texas 76011 l Ms. Cheryl Rodgers, LLRW Program Manager

! Environmental Protection Section l Nebraska Department of Health

! 301 Centennial Mall, South l' P.O. Box 95007 Lincoln, Nebraska 68509-5007 l Mr. J. M. Solymossy l_ Manager- Fort Calhoun Station, ,

L . Omaha Public Power District l Fort Calhoun Station FC-1-1 Plant Post Omce Box 399 ~

l Hwy. 75 - North of Fort Calhoun -

Fort Calhoun, Nebraska 68023 Mr. Mark T. Frans Manager- Nuclear Licensing Omaha Public Power District.

Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 I

L < ,

_