IR 05000285/1999004

From kanterella
Jump to navigation Jump to search
Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy
ML20196D250
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/11/1999
From: Marschall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20196D238 List:
References
50-285-99-04, 50-285-99-4, NUDOCS 9906240240
Download: ML20196D250 (2)


Text

,

.-

,

" "'%

UNITED STATES NUCLEAR REGULATORY COMMISSION e

SUBJECT:

NRC ROUTINE INSPECTION REPORT NO. 50-285/99-04

Dear Mr. Gambhir:

This refers to the inspection conducted on April 25 through May 31,1999, at the Fort Calhoun l

Station facility. The enclosed report presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements occurred. This violation is being treated as a noncited violation, consistent with Appendix C of the Enforcement Policy. The noncited violation is described in the subject inspection report. If you contest the violation or severity level of this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident inspector at the Fort Calhoun Station facility.

In.accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response, if requested, will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, 9906240240 990621 Charles S. Marschall, Chief DR ADOCK 05000285 Project Branch C G

PDR Division of Reactor Projects Docket No.:

50-285 License No.: DPR-40

_

i

']:

.., s:

.

Omaha Public Power District-1-g gg g

'

' E-Mail report to T. Frye (TJF)

. E-Mail report to D. Lange (DJL) -

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

. y

-.bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator DRS-PSB DRP Director MIS System DRS Director '

RIV File Branch Chief (DRP/C)

Branch Chief (DRP/TSS)

Project Engineer (DRP/C)

Resident inspector

<

!,

DOCUMENT NAME: R:\\._FCS\\FC904COR.wpd To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/C -

CSMarschall;dinui 6/21/99 Wt OFFICIAL RECORD COPY -

l I

g.u-1.[

....

_ _ _