Line 15: Line 15:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =
| stage = Approval
}}
}}



Latest revision as of 16:22, 21 August 2022

Forwards NRC Safety Evaluation & Science Applications Intl Corp SAIC-85/3056, Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station. Supplemental Summary Rept Requested within 30 Days of Ltr Receipt
ML20129C681
Person / Time
Site: Pilgrim
Issue date: 05/16/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20127D634 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8506050624
Download: ML20129C681 (2)


Text

,

e

  • - Lp May 16,1985 Docket No. 50-293 Mr. William D. Harrington-

' Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Harrington:

SUBJECT:

DETAILED CONTROL ROOM DESIGN REVIEW On September 24, 1984, you submitted a Summary Report on the Detailed Control Room Design Review (DCRDR) for the Pilgrim Nuclear Power Station.

leted our review of the report and herewith provide our Safety We have comp (SE) and the Technical Evaluation Report (TER), by the Evaluation consultants who assisted us in performing this review.

As indicated by the enclosed SE and TER, a Supplemental Summary Report should be submitted by you with the additional information identified in those documents. Please inform the NRC project manager, within 30 days after receiving this letter, of the date on which you plan to submit the supplement.

Sincerely, Original signed by/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosures:

As stated cc w/ enclosures:

See next page

,,, DISTRIBUTION-bpoetet Fue3 SNorris Gray File NRC PDR Pleech JKramer Local PDR ELJordan CMiller ORB #2 Reading BGrimes SBajwa HThompson JPartlow OELD ACRS (10)

DL:0R_B y# DL:0R DL:0RB#2 SNor Ws:ajs Pleec DVassallo 05/[(,/85 05/if85

/

05/[(/85 8506050624 850516 PDR ADOCK 05000293 F PDR _

i.

Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. Charles J. Mathis, Station Mgr. Thomas A. Murley Boston Edison Company Regional Administrator RFD #1, Rocky Hill Road Region I Office Plymouth, Massachusetts 02360 U. S. Nuclear Regulatory Commission 631 Park Avenue Resident Inspector's Office King of Prussia, Pennsylvania 1940@

U. S. Nuclear Regulatory Commission Post Office Rox 867 Mr. A. Victor Morisi

' i -

Plymouth, Massachusetts 02360 Boston Edison Company I

- 25 Braintree Hill Park Mr. David F. Tarantino Rockdale Street A "

Chairman, Board of Selectman Braintree, Massachusetts 02184

, 11 Lincoln Street

_ Plymouth, Massachusetts 02360 1 Office of the Connissioner 1 Massachusetts Department of

[~ ! Environmental Quality Engineering pe One Winter Street O! Boston, Massachusetts 0?IO8 D:

T1 Office of the Attorney General ft 1 Ashburton Place 19th Floor Boston, Massachusetts 02108

[ Mr. Robert M. Hallisey, Director

,; Radiation Control Program H- Massachusetts Department of pi Public Health

- .5 150 Tremont Street Boston, Massachusetts 02111