IR 05000267/1985001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20132H003
| number = ML20132H003
| issue date = 07/08/1985
| issue date = 07/08/1985
| title = Ack Receipt of 850510 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-01
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-01
| author name = Johnson E
| author name = Johnson E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8507190513
| document report number = NUDOCS 8507190513
| title reference date = 05-10-1985
| package number = ML20132H007
| package number = ML20132H007
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 03:51, 10 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-01
ML20132H003
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/08/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20132H007 List:
References
NUDOCS 8507190513
Download: ML20132H003 (1)


Text

..

.

JUL 0 81985

, _

In Reply Refer To:

}_ Docket: 50-267/85-01 Public Service Company of Colorado ATTN: 0. R. Lee, Vice President

'

Electric Production P. O. Box 840 i Denver,-Colorado 80201 Gentlemen:

Thank you for your letter P-85163 of May 10,1985, in response to our letter and Notice of Violation dated April 15, 1985. We have. reviewed your reply and find it responsive to the concerns raised in our Notice of Violatio We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, orHrM s'-ned By E. a. rn-on E. H. Johnson, Chief Reactor Project Branch I cc:

J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 191 Platteville, Colorado 80651

!

L. Singleton, Manager, Quality Assurance Division (same address)

Colorado Radiation Control Program Director L RIV:SPES MSkow/lkgf/

SPES RP81 h L REIreland EHJohnson

'

7 / I /85 7 / l /85 ]/w/85

'

0 1

!

-

8507190513 850700 I g L- PDR ADOCK 05000267 G PDR: (

(