|
|
(One intermediate revision by the same user not shown) |
Line 14: |
Line 14: |
| | document type = License-Dry Cask, ISFSI, (Amend) DKT 72 | | | document type = License-Dry Cask, ISFSI, (Amend) DKT 72 |
| | page count = 4 | | | page count = 4 |
| | project = EPID:L-2018-LLA-0275 | | | project = CAC:001028, EPID:L-2018-LLA-0275 |
| | stage = Other | | | stage = Other |
| }} | | }} |
Letter Sequence Other |
---|
CAC:001028, (Approved, Closed) EPID:L-2018-LLA-0275, Package: Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Request for Supplemental Information (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287, ML20260H376, ML20261H420... further results
|
MONTHYEARML18298A0702018-10-23023 October 2018 Letter to K. Manzione Holtec Internationals Certificate of Compliance No. 1040 - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19112A0722019-04-17017 April 2019 Letter to K. Manzione Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Request for Supplemental Information Project stage: Acceptance Review ML19112A0712019-04-17017 April 2019 Package: Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Request for Supplemental Information Project stage: Request ML19112A0732019-04-17017 April 2019 Enclosursi (Non-Proprietary)(Letter to K. Manzione Acceptance Review of Holtec International HI-STORM Umax Application for Certificate If Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Dkt No. 72-1040, EPID: L-2018-LLA-0275) Rsi) Project stage: Acceptance Review ML19164A1732019-06-24024 June 2019 Letter to K. Manzione Acceptance Review Completed for Holtec International HI-STORM Umax Application for Certificate of Compliance No. 1040, Amendment No. 4 (CAC No. 001028, Docket No. 72-1040, EPID: L-2018-LLA-0275) Project stage: Acceptance Review ML19275E8282019-09-30030 September 2019 Holtec Umax Amendment 4 RAI Project stage: Request ML19275E9082019-09-30030 September 2019 Letter - Holtec International HI-STORM Umax Application for Certificate of Compliance No. 1040, Amendment No. 4 - Request for Additional Information Project stage: RAI ML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML19345E2012019-12-0606 December 2019 Conversation Record - Clarification Call (12/6/2019) on RAI #1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI 2020-02-29
[Table View] |
|
---|
Category:License-Dry Cask
MONTHYEARML24136A1922024-04-18018 April 2024 Attachment 3: Proposed HI-STORM Umax CoC Amendment 5- Changed Pages ML20349A2102021-01-0404 January 2021 Enclosure 3 - Final CoC 1040 A4 TS App B ML20349A2092021-01-0404 January 2021 Enclosure 2 - Final CoC 1040 TS A4 App a ML20349A2082021-01-0404 January 2021 Enclosure 1 - Final CoC 1040 A4 ML20161A0892020-10-26026 October 2020 Proposed CoC 1040 A4 ML20161A0912020-10-26026 October 2020 Proposed TS - CoC 1040 A4 App B ML19295C5742019-11-26026 November 2019 Enclosure 5: CoC 1014, Amendment No. 14, Appendix B-100U ML18220A8782018-08-0202 August 2018 Generation Station Units 1, 2 and 3 - Registration of Dry Fuel Storage Canister 2024-04-18
[Table view] Category:ISFSI
MONTHYEARML24136A1922024-04-18018 April 2024 Attachment 3: Proposed HI-STORM Umax CoC Amendment 5- Changed Pages ML20349A2102021-01-0404 January 2021 Enclosure 3 - Final CoC 1040 A4 TS App B ML20349A2092021-01-0404 January 2021 Enclosure 2 - Final CoC 1040 TS A4 App a ML20349A2082021-01-0404 January 2021 Enclosure 1 - Final CoC 1040 A4 ML20161A0892020-10-26026 October 2020 Proposed CoC 1040 A4 ML20161A0912020-10-26026 October 2020 Proposed TS - CoC 1040 A4 App B ML19295C5742019-11-26026 November 2019 Enclosure 5: CoC 1014, Amendment No. 14, Appendix B-100U ML18220A8782018-08-0202 August 2018 Generation Station Units 1, 2 and 3 - Registration of Dry Fuel Storage Canister 2024-04-18
[Table view] Category:(Amend) DKT 72
MONTHYEARML24136A1922024-04-18018 April 2024 Attachment 3: Proposed HI-STORM Umax CoC Amendment 5- Changed Pages ML20349A2102021-01-0404 January 2021 Enclosure 3 - Final CoC 1040 A4 TS App B ML20349A2092021-01-0404 January 2021 Enclosure 2 - Final CoC 1040 TS A4 App a ML20349A2082021-01-0404 January 2021 Enclosure 1 - Final CoC 1040 A4 ML20161A0892020-10-26026 October 2020 Proposed CoC 1040 A4 ML20161A0912020-10-26026 October 2020 Proposed TS - CoC 1040 A4 App B ML19295C5742019-11-26026 November 2019 Enclosure 5: CoC 1014, Amendment No. 14, Appendix B-100U ML18220A8782018-08-0202 August 2018 Generation Station Units 1, 2 and 3 - Registration of Dry Fuel Storage Canister 2024-04-18
[Table view] |
Text
U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 651 (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Page 1 of 4 The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of the Code of Federal Regulations, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste" (10 CFR Part 72). This certificate is issued in accordance with 10 CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the Final Safety Analysis Report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, and the conditions specified below.
Certificate No. Effective Expiration Date Docket No. Amendment No. Amendment Effective Date Package Identification No.
Date 1040 April 6, April 6, 72-1040 4 January 25, 2021 USA/72-1040 2015 2035 Issued To: (Name/Address)
Holtec International Holtec Technology Campus One Holtec Blvd Camden, NJ 08104 Safety Analysis Report Title Holtec International Holtec International Final Safety Analysis Report for the Final Safety Analysis Report for the HI-STORM FW MPC Storage System HI-STORM UMAX Canister Storage System This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), and the conditions specified below:
APPROVED SPENT FUEL STORAGE CASK Model No.: HI-STORM UMAX Canister Storage System DESCRIPTION:
The HI-STORM UMAX Canister Storage System consists of the following components: (1) interchangeable multi-purpose canisters (MPCs), which contain the fuel; (2) underground Vertical Ventilated Modules (VVMs),
which contains the MPCs during storage; and (3) a transfer cask (HI-TRAC VW), which contains the MPC during loading, unloading and transfer operations. The MPC stores up to 37 pressurized water reactor fuel assemblies or up to 89 boiling water reactor fuel assemblies.
The HI-STORM UMAX Canister Storage System is certified as described in the UMAX Final Safety Analysis Report (FSAR) supplemented by the information on the MPCs and transfer cask in the HI-STORM FW FSAR, and in the U. S. Nuclear Regulatory Commissions (NRC) Safety Evaluation Report (SER) accompanying the Certificate of Compliance (CoC).
The MPC is the confinement system for the stored fuel. It is a welded, cylindrical canister with a honeycombed fuel basket, a baseplate, a lid, a closure ring, and the canister shell. All MPC components that may come into contact with spent fuel pool water or the ambient environment are made entirely of stainless steel or passivated aluminum/aluminum alloys. The canister shell, baseplate, lid, vent and drain port cover plates, and closure ring are the main confinement boundary components. All confinement boundary components are made entirely of stainless steel. The honeycombed basket provides criticality control.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) 10 CFR 72 CERTIFICATE OF COMPLIANCE Certificate No. 1040 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Supplemental Sheet Page 2 of 4 DESCRIPTION (continued)
There are two types of MPCs permitted for storage in HI-STORM UMAX VVM: the MPC-37 and MPC-89. The number suffix indicates the maximum number of fuel assemblies permitted to be loaded in the MPC. The MPC-37 also has an alternative design called the MPC-37 Type 1. Both MPC models have the same external diameter.
The HI-TRAC VW transfer cask provides shielding and structural protection of the MPC during loading, unloading, and movement of the MPC from the cask loading area to the VVM. The transfer cask is a multi-walled (carbon steel/lead/carbon steel) cylindrical vessel with a neutron shield jacket attached to the exterior and a retractable bottom lid used during transfer operations.
The HI-STORM UMAX VVM utilizes a storage design identified as an air-cooled vault or caisson. The HI-STORM UMAX VVM relies on vertical ventilation instead of conduction through the fill material around the VVM, as it is essentially a below-grade storage cavity. Air inlets and an air outlet allow air to circulate naturally through the cavity to cool the MPC inside. The subterranean steel structure is seal welded to prevent ingress of any groundwater in the MPC storage cavity from the surrounding subgrade, and it is mounted on a stiff foundation. The surrounding subgrade and a top surface pad provide significant radiation shielding. A loaded MPC is stored within the HI-STORM UMAX VVM in a vertical orientation.
HI-STORM UMAX Version MSE is a structurally strengthened embodiment of the VVM engineered for deployment at sites with its Design Basis Earthquake with ZPA in excess of 2.12Gs (resultant horizontal) and up to 1.0G (vertical).
CONDITIONS
- 1. OPERATING PROCEDURES Written operating procedures shall be prepared for handling, loading, movement, surveillance, and maintenance. The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9 of the FSAR.
- 2. ACCEPTANCE TESTS AND MAINTENANCE PROGRAM Written acceptance tests and a maintenance program shall be prepared consistent with the technical basis described in Chapter 10 of the FSAR. At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. This test shall include the base metals of the MPC shell and baseplate. A helium leakage test shall also be performed on the base metal of the fabricated MPC lid. The confinement boundary welds leakage rate test shall be performed in accordance with ANSI N14.5 to leaktight criterion. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB, Article NB-4450 requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.
- 3. QUALITY ASSURANCE Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important-to-safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the storage system
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) 10 CFR 72 CERTIFICATE OF COMPLIANCE Certificate No. 1040 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Supplemental Sheet Page 3 of 4
- 4. HEAVY LOADS REQUIREMENTS Each lift of an MPC or a HI-TRAC VW transfer cask must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific review of the heavy load handling procedures (under 10 CFR 50.59 or 10 CFR 72.48, as applicable) is required to show operational compliance with existing plant specific heavy loads requirements. Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 5.2 of Appendix A.
- 5. APPROVED CONTENTS Contents of the HI-STORM UMAX Canister Storage System must meet the fuel specifications given in Appendix B to this certificate.
- 6. DESIGN FEATURES Features or characteristics for the site or system must be in accordance with Appendix B to this certificate.
- 7. CHANGES TO THE CERTIFICATE OF COMPLIANCE The holder of this certificate who desires to make changes to the certificate, which includes Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), shall submit an application for amendment of the certificate.
- 8. PRE-OPERATIONAL TESTING AND TRAINING EXERCISE A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STORM UMAX Canister Storage System shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:
- a. Moving the MPC and the transfer cask into the spent fuel pool or cask loading pool.
- b. Preparation of the HI-STORM UMAX Canister Storage System for fuel loading.
- c. Selection and verification of specific fuel assemblies to ensure type conformance.
- d. Loading specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly),
including appropriate independent verification.
- e. Remote installation of the MPC lid and removal of the MPC and transfer cask from the spent fuel pool or cask loading pool.
- f. MPC welding, NDE inspections, pressure testing, draining, moisture removal (by vacuum drying or forced helium dehydration, as applicable), and helium backfilling. (A mockup may be used for this dry-run exercise.)
- g. Transfer of the MPC from the transfer cask to the VVM.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) 10 CFR 72 CERTIFICATE OF COMPLIANCE Certificate No. 1040 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Supplemental Sheet Page 4 of 4
- h. HI-STORM UMAX Canister Storage System unloading, including flooding MPC cavity and removing MPC lid welds. (A mockup may be used for this dry-run exercise.)
Any of the above steps can be omitted if the site has already successfully loaded a Holtec MPC System.
- 9. AUTHORIZATION The HI-STORM UMAX Canister Storage System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, this certificate, and the attached Appendices A and B. The HI-STORM UMAX Canister Storage System may be fabricated and used in accordance with any approved amendment to CoC No. 1040 listed in 10 CFR 72.214.
Each of the licensed HI-STORM UMAX Canister Storage System components (i.e., the MPC, overpack, and transfer cask), if fabricated in accordance with any of the approved CoC Amendments, may be used with one another provided an assessment is performed by the CoC holder that demonstrates design compatibility.
FOR THE U. S. NUCLEAR REGULATORY COMMISSION John B. Digitally signed by John B. McKirgan McKirgan Date: 2021.01.04 09:49:27 -05'00' John McKirgan, Chief Storage and Transportation Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Dated _January 4, 2021__
Attachments:
- 1. Appendix A
- 2. Appendix B