IR 05000425/1988012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20155H103
| number = ML20155H103
| issue date = 06/01/1988
| issue date = 06/01/1988
| title = Ack Receipt of 880519 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-425/88-12
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-425/88-12
| author name = Brownlee V
| author name = Brownlee V
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8806200191
| document report number = NUDOCS 8806200191
| title reference date = 05-19-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 20:11, 9 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-425/88-12
ML20155H103
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/01/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
GEORGIA POWER CO.
References
NUDOCS 8806200191
Download: ML20155H103 (2)


Text

--

.

)~

'

-

~

, ,

i WM./( '

JUN 0 1 1308 Georgia Power Company ATTN: Mr. R. P. Mcdonald Executive Vice President -

Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 I Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-425/88-12 Thank you for your response of May 19, 1988, to our Notice of Violation issued on April 26, 1988, concerning activities conaucted at your Vogtle facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matter.

I

Sincerely, ORIGINAL S!GNED Sy VIRGlL L BROWNLEE Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc: P. D. Rice, Vice President, Project Director C. W. Hayes, Vogtl e Quality Assurance Manager G. Bockhold, Jr., General Manager, Nuclear Operations L. Gucwa, Manager, Nuclear Safety and Licensing J. A. Bailey, Project Licensing Manager B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge D. Kirkland, III, Counsel, Office of the Consumer's Utility Council D. Feig, Georgians Against Nuclear Energy bcc: (See page 2)

8806200191 880601 gDR ADOCK 05000425 DCD

\ D ai

--

' *

..

.' ,

Georgia Power Company 2 01 u bec: E. Reis, OGC J. Hopkins, NRR M. Sinkule, RII DRS, Technical Assistant NRC Resident Inspector Document Control Desk State of Georgie

.

RII RII RII RII ( C/ 'CPatterson:lb ( .MSinkule VLBr niee L s 06/r /88 06// /88 06/l /88 0 8