| number = ML20236R884
| number = ML20236R884
| issue date = 11/17/1987
| issue date = 11/17/1987
| title = Forwards Safety Insp Rept 50-293/87-41 on 870914-18.No Violations Observed.Steps Taken to Correct Three of Four Violations Noted in NRC 870310 Ltr Verified.Notice of Violation from Insp Rept 50-293/87-04 Withdrawn
| title = Forwards Safety Insp Rept 50-293/87-41 on 870914-18.No Violations Observed.Steps Taken to Correct Three of Four Violations Noted in NRC Verified.Notice of Violation from Insp Rept 50-293/87-04 Withdrawn
| author name = Johnston W
| author name = Johnston W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8711240083
| document report number = NUDOCS 8711240083
| title reference date = 03-10-1987
| package number = ML20236R887
| package number = ML20236R887
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 23:32, 19 March 2021

Forwards Safety Insp Rept 50-293/87-41 on 870914-18.No Violations Observed.Steps Taken to Correct Three of Four Violations Noted in NRC Verified.Notice of Violation from Insp Rept 50-293/87-04 Withdrawn
ML20236R884
Person / Time
Site: Pilgrim
Issue date: 11/17/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20236R887 List:
References
NUDOCS 8711240083
Download: ML20236R884 (2)


See also: IR 05000293/1987041

Text

NOV 171987

>

,

Docket No. 150-293

Boston Edison Company

ATTN: Ralph G. Bird

800 Boyleston StreetSenior Vice President - Nuclear

(

Boston' Massachusetts. 02199

,

Gentlemen:

Subject:

' Routine Safety Inspection No.

50-293/87-41

5 office on SeptemberThis refers to_ thee routine safety inspection ~ con

14-18, 1987, at Pilgrim Nuclear Po y P. Bissett of this

discussions of our findings held o.by Mr. BissettMassach

DPR-35 and to the

' members of your staff at the conclusion ofon. the inspecti, with Mr. K. Robert

Areas. examined during this inspection are described i

b

Inspection 1 Report which is enclosed with this letter n the NRC Region I

. inspection consisted of selective examinations of procedureWithin

.

records, interviews with personnel, and observations b

s and representative

y the inspector.

Our inspector also verified the steps you have tak

four violations brought to your attention en to correct inarch

our10,letter

three of the dated M

1987.

We have no further questions regarding your res

enclosed As

violation. inspection report, which discusses our graph subs2.6 of the

a result of 1 equent review of this

to our letter1987; and,Marchon

dated 2) your)Maysubsequent

l,' letter dated Jour meeting with

10, 1987, a further

,

une 8, 1987 in response

-

-(293/87-04-04)

cf ~ this review,'we withdraw thea Notice

inspection report.50-293/87-04.

.

Based of upon

Violthetiwas

results conducted duri

on, detailed in Appendix A of

Within the scope of this inspection, no violations we

re observed.

No. reply to this letter is required.

is appreciated.

Your cooperation with us in this matter

Sincerely,

p s . e. -

.

William V. Johnston, Acting Director

Enclosure: Division of Reactor Safety

NRC Region I Inspection Report Number

50-293/87 41 -

0FFICIAL RECORO COPY

8711240083 871117 IR PILGRIM 87-41 - 0001.0.0

10/23/87 p

PDR

.O ADOCK 05000293 '

PDR ih

i

it

\

_-

9

.

L

I NOV 1's 1987

L

,

o

Docket No. 50-293

i Boston Edison Company '

. ATTN.: Ralph G. Bird

Senior Vice President - Nuclear

800 Boyleston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Routine' Safety Inspection No. 50-293/87-41

This ' refers to'the routine safety-inspection conducted by P. Bissett of this

office on September. 14-18, 1987, at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts, of activities authorized by NRC License No. DPR-35 and to the

discussions of our findings held by Mr. Bissett, with Mr. K. Roberts and other

members of your staff at the conclusion of the inspection.

'

Areas examined during this inspection are . described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct three of the

. four violations brought to your attention in our letter dated March 10, 1987.

We have no further questions regarding your response to violations A, C and D.

In regard to violation B, your attention is directed to Paragraph 2.6 of the

enclosed inspectien report, which discusses our subsequent review of this

violation. As a result of 1) our meeting with representatives of your staff

on May 1,'1987; and, 2) your subsequent letter, dated June 8, 1987 in response

to our letter dated March 10, 1987, a further review of this violation

- (293/87-04-04) was conducted during this inspection. Based upon the results

of.this review, we withdraw the Notice of Violation, detailed in Appendix A of

inspection report 50-293/87-04.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

n.. _-

i

William V. Johnston, Acting Director

Division of Reactor Safety

I

Enclosure: -NRC Region I Inspection Report Number 50-293/87-41  ;

0FFICIAL RECORD COPY IR PILGRIM 87-41 - 0001.0.0

10/23/87 g] j

8711240083 871117 It  !

PDR ADOCK 05000293 \

i :- - _ _- - _-_ -_ _-_

mg ,

- - ---

= -- - - - -

m, .- ~ ,

-

.

pg M . ,

,

'*

g, %.

V2 . .

pa~

CL , Boston! Edi so'n LCompany ;

-

2

41- --

Jif%

g; , 'cclw,encli .

i

g>

.

. . . .

7 ' :: K: P..' Roberts,: Nuclear Operations Manager

f. ,

," * Pau11 Levy, Chairman,. Department:offPublic Utilities-

4 :EChairman;-: Board of' Selectmen-

4ya tiPlymouth-Civil; Defense Director

q* lu ; j,

.

.i:J ; D.= Keyes,; Boston Edison Regulatory Affairs .and Programs

go' .r EL D.<Robinso'n, Nuclear Information. Manager

4

ej

r ,/.n-

th RT N. Swanson... Nuclear Engineering Department Manager

-a The< Hon'orable'E.LJ. Markey:

Qi <

' ' ~

>

X Senator Edward P.lKirbyl

eTheJHonorable1 Peter'V. Forman

- , Peter WFAgnes','Jr., Assistant Secretary of Public Safety

-

.F t .lSharon Pollard, Secretary of Energy' Resources .

P: ;  ::a Rachel Shimshak,L MASSPIRG' .

1 u

-

.Public: Document Room (PDR);

i'

3 Local Publicl Document Room .(LPDR) .

A < Nuclearf Safety. Information- Center (NSIC)

M .NRC; Resident Inspector:

pq :w CommonwealthofMassachusetts-(2)

p[_ , ,' [becw/ enc 1r

i , . Region I Docket. Room(with. concurrences)

.,e, Management: Assistant DRMA' (w/o enc 1)

W '

iSection Chief,'DRP

y'< 1RE Wes'sman,:PM, NRRL

"b >

^

'

.PAOL(2)'SALPlReportsOnly

' Robert J.' Bores, DRSS;

'

1 * Commonwealth of Massachuse+ts

~

l l J.!Durr,'DRS;

.

4

f .

.;

,

RI:DRS

^-

0

RI:DR

-

RI:DRP

\A/V

PR.

<3

?Bissett k/rw Blumberg Blough o D 3bkosroh

M'.<

... ..;m - ;g

.

/: n ,  ::g,y,gy- 3))y,gy.

--

al

i

,gy_

-3 <,b/#7

3J,q /87 10/ 87 llllW

L

L 0FFICIAL RECORD COPY IR PILGRIM 87-41 - 0002.0.0

H< 10/23/87 l

L ,