Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:* |
| | . |
| | * |
| | , j ** *'49 |
| | + 0 |
| | ''. UNITED STATIS |
| | . ON |
| | 'N E NUCLEAR REGULATORY COMMISSION |
| | |
| | 'o REGION 11 Y g'O j[ 101 MARIETTA ST., N.W. |
| | |
| | e,,,, ATLANTA, GEORGIA 30323 Report No. : 50-425/88-52 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-425 License No.: CPPR-109 Facility Name: Vogtle 2 Inspection Conducted: August 29 - September 1,1988 Inspector:[ d.. (/# */ - 2 /- t' F P. A. Tayldr Date Signed Approved by: 4M 12JL- I[2/ /.P8 F. Jape, Chief (/ / Date Signed Test Programs Section Engineering Branch Division of Reactor Safety SUMMARY Scope: This routine, unannounced inspection was conducted in the areas of hot functional controlling procedure review and reactor coolant system primary hydrostatic test results evaluation. |
| | |
| | Results: In the areas inspected, violations or deviations were not identified. |
| | |
| | The review of the controlling procedure for hot functional testing indicated a well planned document had been developed 'o establish requirements and to sequence intergrated hot functional testing. Hinor procedural corrections were identified (Paragraph 2) during the review. |
| | |
| | 8910120395 880923 PDR ADOCK 05000425 O PNU |
| | - ___ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ |
| | |
| | * |
| | . |
| | - . |
| | , |
| | . |
| | REPORT DETAILS |
| | . |
| | 1. Persons Contacted Licensee Employees |
| | ' |
| | j M. Ajulni, Operations Superintendent |
| | *M. Bagale, Hot Functionals Test Manager |
| | *B. D. Carter Hot Functionals Operations Manager |
| | *A. B. Gallant, Project Compliance Coordinator |
| | *E. D. Groover, Quality Assurance Site Manager - Construction |
| | ' |
| | *S. M. Hall, Procedures Superintendent - Unit 2 |
| | *H. M. Handfinger, Project Startup Manager |
| | *M. Horton, Superintendent Test Engineers |
| | ' |
| | *P. D. Rice, Vice President and Project Director Other licensee employees contacted during this inspection ircluded engineers, and administrative personnel. |
| | |
| | NRC Resident Inspector |
| | , |
| | , R. S. Schepens |
| | * Attended exit interview |
| | ! |
| | 2. Review of Hot Functional Sequencing Procedure (70308)(70300) |
| | ] |
| | a. The licensee approved on June 21, 1988, RCS Hot Functional Test Procedure 2-300-07, Revision 0. This procedure is used to control and sequence hot functional testing during the heatup of the Reactor |
| | , |
| | ' |
| | ' |
| | Coolant System (RCS) to normal operating conditions and the subsequent cooldown demonstration of the RCS. This test procedure was reviewed to confinn that: |
| | ' |
| | - The test procedure is consistent with FSAR Chapter 14 and Regulatory Guide (RG) 1,68 comitments regarding demonstration of component and systen operability in all modes and throughout full design operating range. |
| | |
| | - Thermal ex vibration (piping and reactor vessel internals) pansion, and restraint tests are scheduled during hot |
| | ; functionals. |
| | |
| | - Water chemistry controls are established. |
| | |
| | - Preconditioning criteria for RCS internals are established, a |
| | - Overall plant testing has been identified and scheduled to be |
| | ! performed. |
| | |
| | < |
| | - - - - - - |
| | - . - - _ _ , _ _ _ _ _ . . _ , _ _ _ _ _ . . _ _ _ . _ . , _ _ . _ _ _ . _ . _ _ _ _ _ , , |
| | _ |
| | |
| | , . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ |
| | ' |
| | . |
| | * |
| | , |
| | . |
| | |
| | - Plant procedures are checked to detennine their adequacy. |
| | |
| | - The test procedure contained the required reviews, management approvals, precautions and acceptance criteria. |
| | |
| | - Prerequisites are provided which require that system open items, punch listed items, outstanding construction and preoperational tests are reviewed to determine that plant systems are ready to support the hot functional testing sequence. |
| | |
| | The review of the controlling procedure for hot functional testing resulted in the following Inspector Followup Item. |
| | |
| | (1) Inspector Followup iten (!FI) 425/88-52-01, Correct Hot functional Procedural items listed below: |
| | (a) Procedure 2-300-07 Step 6.5.2.4 Test Results Review. Add the following preoperational tests to the list of tests requiring review prior to cooldown. |
| | |
| | - Special Test-39, Metal Impact Monitoring System |
| | - 2 388-02, Pressurizer Relief Tank |
| | - 2-38G-03, Boro:: Thermal Regeneration System |
| | - 2 3AE-01, Main Feedwater (b) Provide a method to ensure test personnel are aware of requirements to document any planned or unplanned actuation of safety injection during hot conditions, RG 1.79, Revision 2. Section C.2.a. |
| | |
| | (c) 2-300-07 Step 6.6.1.4, Cooldown From Outside the Control Room. Add the specific RCS pressure which operator will be required to achieve. |
| | |
| | (d) 2 300-10, Shutdown Panel Preoperational Test. Provide for recording RCS pressure decreases on existing data table. |
| | |
| | RG 1.68.2 requires a demonstration of pressure control as well as tenperature control during the cooldown at the remote shutdown panels. |
| | |
| | (e) 2-300-10, and Abnormal Operating Procedure 18038, Operation From Remote Shutdown Panels. These two documents do not agree as to appropriate step number to use in the AOP and plant pressure to obtained and maintain. |
| | |
| | Within the areas inspected, no violations or deviations were identified. |
| | |
| | . |
| | , |
| | - |
| | .. |
| | , |
| | , . |
| | l 3 I |
| | 3. Reactor Coolant System Hydrostatic Test Results Evaluation (70562) |
| | } |
| | : The inspector reviewed the test results of Test Procedure 2-300-03, RCS t. Primary Hydrostatic Test, Revision 1. approved April 27, 1988, to verify j that: |
| | - Test steps and data sheets identified data recorders |
| | - |
| | - Test results met the acceptance criteria |
| | - Changes made to the procedure did not change the purpose of the test |
| | - |
| | , |
| | - The licensee had evaluated the test results and management approval received as requ; red by administrative controls j - Deficiencies identified during the test were evaluated and corrective action ioantified as required. |
| | |
| | l The RCS hydrostatic test was completed satisfactorily May 9,1988. |
| | |
| | ! |
| | With the areas inspected, no violation or deviations were identified. |
| | |
| | ] |
| | ) 4 Exit Interview I |
| | , |
| | The inspection scope and results were summarized on September 1.1988, |
| | ; with those persons indicated in Paragraph 1. The inspector described the |
| | ; areas inspected and discussed in detail the inspection results listed |
| | " |
| | below. Proprietary informa tion is not contained in this report. |
| | |
| | Dissenting comments were not received from the licensee. |
| | |
| | IFI 425/83-52-01, Correct Hot Functional Procedural items, Paragraph 2. |
| | |
| | 4 |
| | ! |
| | : |
| | i i |
| | i i |
| | ! |
| | ! |
| | i |
| | |
| | . |
| | .. . |
| | ' |
| | O >SEG Potmc Scruce Elecu .: and G as Cmor an / P O in E Hanuxts Bo I;e. tb ,< Jenn C3333 Salem Generating Station October 4, 1988 U. S. lluclear Regulatory Comminsion Document Co.itrol Desk Washington, DC 20555 |
| | |
| | ==Dear Sir:== |
| | SALEM GEllERATING STATIOli L I C Ell S E 11 0 . DPR-70 DOCKET 110, 50-272 Uti1T NO. 1 SUPPLEMEfiTAL SPECIAL REPORT 88-3-2 |
| | { This supplemental Special Report addresses additional fire barrier penetration irepairments which have not been restored to functional status within seven (7) dayn. These impairments have been discovered by the Penetration Seal Task Force. This report satisfies the reporting requirements of Technical Specification Action 3.7.11.a pursuant to Technical Specification 6.9.2. It is being submitted within thirty (30) days as per the Action Statement. |
| | |
| | Sincerely yours, a .- |
| | L. A. Miller General Manager-Salem Operations HJP:pc Distribution 89101f 'e DR o'3 ; |
| | w ene% em ; |
| | |
| | . |
| | - . - _ _ - - - - - - - - |
| | |
| | - _ _ _ _ _ _ _ _ _ _ _ _ _ |
| | _ |
| | ' |
| | . |
| | . UNIT 1 SPECIAb REPORT 88-3-2 P L ANT _I D ENTI FI_Q ATI_ON_;_ |
| | Salem Generating Station - Unit 1 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURR_ENCE1 Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than 7 Days Event Date(s): 7/20/88, 8/09/88, 9/07/88 l Report Date: 10/04/88 l This report was initiated by Incident Report No. 88-268. |
| | |
| | CONDITIONS PRIOR 10_O_QQURRENQE:_ |
| | N/A DESCRIPTION _OF_OC.QURRENCE:_ |
| | As identified in PSE&G 1etter NLR-N88037 dated March 4, 1988, PSE&G has initiated a comprehensive review / inspection of fire barrier penetration seals. Due to the additional review by the Penetration Seal Task Force, penetrations found impaired are not being repaired within seven days as specified by Technical Specification Action Statement 3.7.11.a. This report summarizes the task force findings associated with inadequate penetration seals. The inadequate penetration seals found, to the date of issue of this report, include: |
| | On July 13, 1988 two fire Barrier cable penetration were found degraded. The penetration contained electrical sleeving containing an electrical cable surrounded by foam type fire sealant. The area (approximately 1/8" gap and 1/4" gap respectively) surrounding the electrical sleeves were not sealed thereby constituting an impaired seal. The fire barrier is in the east wall of the 100' Elevation Relay Room. |
| | |
| | On July 25, 1988 three (3) degraded fire barrier cable penetration seals were found on the south wall in the 100* |
| | Elevation Relay Room. Two (2) of these penetrations are 3" in diameter and the other is 5.5" (located '18 feet above the floor). The 3" penetrations contain fire wrapped cabling. This fire wrap extends over the penetration. There is no foam behind the fire wrap. It provides a 1 hour rated barrier, however, the wall is a 3 hour barrier. The 5.5" penetration contains a 4" conduit surrounded by foam. The foam contains an 1/8" gap at the base of the conduit. |
| | |
| | On July 28, 1988 one (1) 3.5" degraded fire barrier cable penetration seal was found on the north wall in the 100' |
| | Elevation Relay Room. The penetration contains cabling surrounded by foam. The foam contains an 1/2" diameter hole. |
| | |
| | Between August 2, 1988 and August 30, 1998, 138 additional penetration seals were found impaired of which 134 penetrations |
| | _ . . _ _ _ _ _ _ _ _ _ _ _ . |
| | |
| | . |
| | , UNIT 1 SPECIAL REPORT 88-3-2 -2-q. |
| | |
| | ; |
| | DESCRIPTIO!LOF_pCC.URRENCE :_(cont'd)_ |
| | ' |
| | are located in the Unit 1 Relay Room and 4 penetrations are located in the Unit 1 1A 125 V Dattery Room. The penetrations range in size from ~3 inches to ~6 inches in diameter. The nature of the impairments include 6 with no seal, 14 with a hole in the seal (unknown cause), 2 with foreign material imbedded in the seal (one imbedded with a rag and the other with duct tape), i 30 with a void in the seal (due to inadequate quantity of foam l 1 injection upon installation), 6 with apparent degradation (e.g., |
| | ! |
| | J cable pulled through) 47 with inadequate color / coll structure j (reference LER 272/88-013-00) and 32 that are not deep eaough |
| | ; into the penetration per design (less than 6 inches), |
| | i Between August 31, 1988 and September 30, 1988, 74 additional i |
| | penetration seals were found impaired. The majority of : |
| | penetrations range in size from ~3 inches to ~6 inches in ; |
| | diameter. One floor penetration in the 84' Elevation Aisle #1 i |
| | * |
| | East Section is 47"x12". |
| | |
| | , |
| | Page 3 of this report contains a table of the penetration seals found impaired, between August 31, 1988 and September 30, 1988, in relation to the fire zone where they were found. The |
| | ; impairment designator terms include: I |
| | |
| | l No Seal NOS > |
| | J Hole in Seal HOL i i Void in Seal VIS l Depth Not Creat Enough DPT l Color / Cell Structure CEL L l Seal Degradation DEG |
| | < i |
| | ' |
| | ! |
| | An hourly fire watch patrol had been established for the above areas |
| | { previously due to other fire protection concerns. Therefore, the [ |
| | ; requirements of Tech. Spec. Action Statement 3.7.11.a are met. ' |
| | |
| | Technical Specification 3.7.11 states: f i ! |
| | ! "All fire penetrations (including cable penetration barriers, I |
| | ' |
| | fire doors and fire dampers), in fire zone boundaries, l protecting safety related areas shall be functional." I |
| | , |
| | i l Technical Specification Action Statement 3.7.11.a states: : |
| | i |
| | ) "With one or more of the above required fire barrier i |
| | , penetrations non-functional, within one (1) hour either l i establish a continuous fire watch on at least one (1) side of l 1 the affected penetration, or verify the OPERABILITY of fire i |
| | ' |
| | ! detectors on at least one (1) side of the non-functional fire l barrier and establish an hourly fire watch patrol. Restore the 1 non-functional fire barrier penetration (s) to functional status i j within 7 days or, in lieu of any other report required by J 3 Specification 6.9.1, prepare and submit a Special Report to the ! |
| | l Commission pursuant to Specification 6.9.2 within the next 30 l |
| | ; days outlining the action taken, the cause of the non-functional - |
| | ; penetration and plans and schedule for restoring the fire [ |
| | j barrier penetration (s) to functional status." |
| | |
| | , |
| | h |
| | ; ; |
| | . |
| | ! |
| | |
| | _ _ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ |
| | .' |
| | , |
| | ,N!/IT 1 SPECIAb REPORT 88-3-2 -3-TABLE OF INOPERABLE PENETRATION SMALS 8/31/88 - 9/30/88 i |
| | AREA NOS HUIj VI S. DPT CEL DEG. |
| | |
| | I U-1 Relay Room 8 16 17 8 2 U-1 1A 125 V Battery Room 1 * 2 1 U-l #1 250 V Battery Room 3 * 1 1 5 |
| | . |
| | #12 RHR Pump Room 2 U-1 #3 Stairwell 1 1 U-1 84' Elevation, Aisle #1 4 1 ! |
| | Auxiliary Buildinq ! |
| | ' |
| | * - |
| | Three of these penetrations are 18"x8" and one penetration is 8"x6"; all contain fire dampers with NOS around |
| | , |
| | perimeter of dampers i |
| | |
| | APPARENT _CAUSE_OF_ OCCURRENCE; |
| | ' |
| | The cause of the degraded fire barrier penetrations could not be positively determined. |
| | |
| | ' |
| | i The east wall penetrations (discovered 7/13/88) from the Relay Room |
| | ! side "appeared" nealed visually due to the use of a buching on the |
| | , |
| | sleeve which hid the gap. The 3.5" south wall penetrations |
| | ; (discovered 7/25/88) also appeared scaled from the Relay Room side, i as deceribed in the Description of Occurrence section. Closer inspection, as required by the Seal Penetration Review Group procedures, revealed the nature of the impairments. Technical Specification Surveillance 4.7.11 requires verification of the functional status of fire barrier penetrations every eighteen nontha via a visual inspection. This inspection would not necessarily |
| | ; identify the non-functional status of the subject penetrations. |
| | |
| | ' |
| | I' |
| | The 5.5" south wall penetration (found July 25) is located in a + |
| | difficult to reach location. The gap in the seal may have formed due ( |
| | to shrinkage. It does not appear as though a cable was pulled j (forming the cap). ' |
| | The 3.5" north wall pen etration (found July 28) is alao located in a l difficult to reach loca tion. The gap in the seal appearn to have i i formed as a result of a cable pull. It has not been determined when l or by whom the cable was pulled. l I |
| | The penetrations with non-functional seals, found between August 2, - |
| | 1938 and September 30, 1988, are similar in configuration (except as l i noted) to the penetrations identified in the origial issue of this Special Report, The cause of their degraded condition also could not i positively be determined. l l |
| | ; |
| | |
| | _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ |
| | * |
| | . , |
| | * |
| | . |
| | , . PlIT 1 SPECIAL REPORT 88-3-2 -4-AN ALY S I S O r* OC " Wi.- |
| | The funct' ne c. r rity of the penetration fire barriers ensures that firet; 5 i" confined or adequately retarded from spreading to adjacent po . e of the facility. This design feature minimizes the possibility of a single fire involving several areas of the facility. The fire barrier penetration seals are a passive element in the facility fire protection program and are subject to periodic inspections. This report satisfies the reporting requirements of Technical Specification 3.7.11.a pursuar.t to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire barrier impairments is greater than seven (7) days. Appropriate actions were already in place in accordance with the requirements of |
| | ) Technical Specification Action Statement 3.7.11.a to establish a one hour roving fire watch for the impaired fire barriers once the impairments were identified. |
| | |
| | . The subject fire area contains detection in addition to the roving fire watch patrol. Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve an adjacent area. This occurrence therefore involved no undue risk to the health or safety of the public. |
| | |
| | CORRECTIVE _ACTIOf[; |
| | The hourly fire watch, as addressed in the Description of Occurrence ae: tion, will continue until all fire protection concerns associated with these areas are resolved. |
| | |
| | l The repair of the penetrations was not accomplished within seven (7) |
| | ' |
| | days due to the additional review being conducted by the Penetration Seal Task Force. Upon completion of this review the penetrations will be sealed. |
| | |
| | Those penetrations in the Relay Room (a halon discharge area) which either have no seal or holes through the seal have been sealed using approved station procedure M3Y-1, "Installation of Fire Barrier and Flood Protection Seals". |
| | |
| | This review and corrective action will be completed in accordance |
| | , |
| | with PSE&G letter NLC-N88037, dated March 4, 1988, to the NRC which discusses the Penetration Seal Review Program schedule and the telecommunication between PSE&G and the NRC Region 1 office conducted on August 26, 1938. |
| | |
| | j y* |
| | General Manager - |
| | Salem Operations |
| | , |
| | i HJP:pe SORC Mtg. 88-082 |
| }} | | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARIR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings ML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
Inspection Report - Vogtle - 1988052 |
---|
|
|
Text
.
, j ** *'49
+ 0
. UNITED STATIS
. ON
'N E NUCLEAR REGULATORY COMMISSION
'o REGION 11 Y g'O j[ 101 MARIETTA ST., N.W.
e,,,, ATLANTA, GEORGIA 30323 Report No. : 50-425/88-52 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-425 License No.: CPPR-109 Facility Name: Vogtle 2 Inspection Conducted: August 29 - September 1,1988 Inspector:[ d.. (/# */ - 2 /- t' F P. A. Tayldr Date Signed Approved by: 4M 12JL- I[2/ /.P8 F. Jape, Chief (/ / Date Signed Test Programs Section Engineering Branch Division of Reactor Safety SUMMARY Scope: This routine, unannounced inspection was conducted in the areas of hot functional controlling procedure review and reactor coolant system primary hydrostatic test results evaluation.
Results: In the areas inspected, violations or deviations were not identified.
The review of the controlling procedure for hot functional testing indicated a well planned document had been developed 'o establish requirements and to sequence intergrated hot functional testing. Hinor procedural corrections were identified (Paragraph 2) during the review.
8910120395 880923 PDR ADOCK 05000425 O PNU
- ___ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
.
- .
,
.
REPORT DETAILS
.
1. Persons Contacted Licensee Employees
'
j M. Ajulni, Operations Superintendent
- M. Bagale, Hot Functionals Test Manager
- B. D. Carter Hot Functionals Operations Manager
- A. B. Gallant, Project Compliance Coordinator
- E. D. Groover, Quality Assurance Site Manager - Construction
'
- S. M. Hall, Procedures Superintendent - Unit 2
- H. M. Handfinger, Project Startup Manager
- M. Horton, Superintendent Test Engineers
'
- P. D. Rice, Vice President and Project Director Other licensee employees contacted during this inspection ircluded engineers, and administrative personnel.
NRC Resident Inspector
,
, R. S. Schepens
!
2. Review of Hot Functional Sequencing Procedure (70308)(70300)
]
a. The licensee approved on June 21, 1988, RCS Hot Functional Test Procedure 2-300-07, Revision 0. This procedure is used to control and sequence hot functional testing during the heatup of the Reactor
,
'
'
Coolant System (RCS) to normal operating conditions and the subsequent cooldown demonstration of the RCS. This test procedure was reviewed to confinn that:
'
- The test procedure is consistent with FSAR Chapter 14 and Regulatory Guide (RG) 1,68 comitments regarding demonstration of component and systen operability in all modes and throughout full design operating range.
- Thermal ex vibration (piping and reactor vessel internals) pansion, and restraint tests are scheduled during hot
- functionals.
- Water chemistry controls are established.
- Preconditioning criteria for RCS internals are established, a
- Overall plant testing has been identified and scheduled to be
! performed.
<
- - - - - -
- . - - _ _ , _ _ _ _ _ . . _ , _ _ _ _ _ . . _ _ _ . _ . , _ _ . _ _ _ . _ . _ _ _ _ _ , ,
_
, . _ _ _ _ _ _ _ - _ _ _ _ _ _ _
'
.
,
.
- Plant procedures are checked to detennine their adequacy.
- The test procedure contained the required reviews, management approvals, precautions and acceptance criteria.
- Prerequisites are provided which require that system open items, punch listed items, outstanding construction and preoperational tests are reviewed to determine that plant systems are ready to support the hot functional testing sequence.
The review of the controlling procedure for hot functional testing resulted in the following Inspector Followup Item.
(1) Inspector Followup iten (!FI) 425/88-52-01, Correct Hot functional Procedural items listed below:
(a) Procedure 2-300-07 Step 6.5.2.4 Test Results Review. Add the following preoperational tests to the list of tests requiring review prior to cooldown.
- Special Test-39, Metal Impact Monitoring System
- 2 388-02, Pressurizer Relief Tank
- 2-38G-03, Boro:: Thermal Regeneration System
- 2 3AE-01, Main Feedwater (b) Provide a method to ensure test personnel are aware of requirements to document any planned or unplanned actuation of safety injection during hot conditions, RG 1.79, Revision 2. Section C.2.a.
(c) 2-300-07 Step 6.6.1.4, Cooldown From Outside the Control Room. Add the specific RCS pressure which operator will be required to achieve.
(d) 2 300-10, Shutdown Panel Preoperational Test. Provide for recording RCS pressure decreases on existing data table.
RG 1.68.2 requires a demonstration of pressure control as well as tenperature control during the cooldown at the remote shutdown panels.
(e) 2-300-10, and Abnormal Operating Procedure 18038, Operation From Remote Shutdown Panels. These two documents do not agree as to appropriate step number to use in the AOP and plant pressure to obtained and maintain.
Within the areas inspected, no violations or deviations were identified.
.
,
-
..
,
, .
l 3 I
3. Reactor Coolant System Hydrostatic Test Results Evaluation (70562)
}
- The inspector reviewed the test results of Test Procedure 2-300-03, RCS t. Primary Hydrostatic Test, Revision 1. approved April 27, 1988, to verify j that:
- Test steps and data sheets identified data recorders
-
- Test results met the acceptance criteria
- Changes made to the procedure did not change the purpose of the test
-
,
- The licensee had evaluated the test results and management approval received as requ; red by administrative controls j - Deficiencies identified during the test were evaluated and corrective action ioantified as required.
l The RCS hydrostatic test was completed satisfactorily May 9,1988.
!
With the areas inspected, no violation or deviations were identified.
]
) 4 Exit Interview I
,
The inspection scope and results were summarized on September 1.1988,
- with those persons indicated in Paragraph 1. The inspector described the
- areas inspected and discussed in detail the inspection results listed
"
below. Proprietary informa tion is not contained in this report.
Dissenting comments were not received from the licensee.
IFI 425/83-52-01, Correct Hot Functional Procedural items, Paragraph 2.
4
!
i i
i i
!
!
i
.
.. .
'
O >SEG Potmc Scruce Elecu .: and G as Cmor an / P O in E Hanuxts Bo I;e. tb ,< Jenn C3333 Salem Generating Station October 4, 1988 U. S. lluclear Regulatory Comminsion Document Co.itrol Desk Washington, DC 20555
Dear Sir:
SALEM GEllERATING STATIOli L I C Ell S E 11 0 . DPR-70 DOCKET 110, 50-272 Uti1T NO. 1 SUPPLEMEfiTAL SPECIAL REPORT 88-3-2
{ This supplemental Special Report addresses additional fire barrier penetration irepairments which have not been restored to functional status within seven (7) dayn. These impairments have been discovered by the Penetration Seal Task Force. This report satisfies the reporting requirements of Technical Specification Action 3.7.11.a pursuant to Technical Specification 6.9.2. It is being submitted within thirty (30) days as per the Action Statement.
Sincerely yours, a .-
L. A. Miller General Manager-Salem Operations HJP:pc Distribution 89101f 'e DR o'3 ;
w ene% em ;
.
- . - _ _ - - - - - - - -
- _ _ _ _ _ _ _ _ _ _ _ _ _
_
'
.
. UNIT 1 SPECIAb REPORT 88-3-2 P L ANT _I D ENTI FI_Q ATI_ON_;_
Salem Generating Station - Unit 1 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURR_ENCE1 Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than 7 Days Event Date(s): 7/20/88, 8/09/88, 9/07/88 l Report Date: 10/04/88 l This report was initiated by Incident Report No.88-268.
CONDITIONS PRIOR 10_O_QQURRENQE:_
N/A DESCRIPTION _OF_OC.QURRENCE:_
As identified in PSE&G 1etter NLR-N88037 dated March 4, 1988, PSE&G has initiated a comprehensive review / inspection of fire barrier penetration seals. Due to the additional review by the Penetration Seal Task Force, penetrations found impaired are not being repaired within seven days as specified by Technical Specification Action Statement 3.7.11.a. This report summarizes the task force findings associated with inadequate penetration seals. The inadequate penetration seals found, to the date of issue of this report, include:
On July 13, 1988 two fire Barrier cable penetration were found degraded. The penetration contained electrical sleeving containing an electrical cable surrounded by foam type fire sealant. The area (approximately 1/8" gap and 1/4" gap respectively) surrounding the electrical sleeves were not sealed thereby constituting an impaired seal. The fire barrier is in the east wall of the 100' Elevation Relay Room.
On July 25, 1988 three (3) degraded fire barrier cable penetration seals were found on the south wall in the 100*
Elevation Relay Room. Two (2) of these penetrations are 3" in diameter and the other is 5.5" (located '18 feet above the floor). The 3" penetrations contain fire wrapped cabling. This fire wrap extends over the penetration. There is no foam behind the fire wrap. It provides a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> rated barrier, however, the wall is a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barrier. The 5.5" penetration contains a 4" conduit surrounded by foam. The foam contains an 1/8" gap at the base of the conduit.
On July 28, 1988 one (1) 3.5" degraded fire barrier cable penetration seal was found on the north wall in the 100'
Elevation Relay Room. The penetration contains cabling surrounded by foam. The foam contains an 1/2" diameter hole.
Between August 2, 1988 and August 30, 1998, 138 additional penetration seals were found impaired of which 134 penetrations
_ . . _ _ _ _ _ _ _ _ _ _ _ .
.
, UNIT 1 SPECIAL REPORT 88-3-2 -2-q.
DESCRIPTIO!LOF_pCC.URRENCE :_(cont'd)_
'
are located in the Unit 1 Relay Room and 4 penetrations are located in the Unit 1 1A 125 V Dattery Room. The penetrations range in size from ~3 inches to ~6 inches in diameter. The nature of the impairments include 6 with no seal, 14 with a hole in the seal (unknown cause), 2 with foreign material imbedded in the seal (one imbedded with a rag and the other with duct tape), i 30 with a void in the seal (due to inadequate quantity of foam l 1 injection upon installation), 6 with apparent degradation (e.g.,
!
J cable pulled through) 47 with inadequate color / coll structure j (reference LER 272/88-013-00) and 32 that are not deep eaough
- into the penetration per design (less than 6 inches),
i Between August 31, 1988 and September 30, 1988, 74 additional i
penetration seals were found impaired. The majority of :
penetrations range in size from ~3 inches to ~6 inches in ;
diameter. One floor penetration in the 84' Elevation Aisle #1 i
East Section is 47"x12".
,
Page 3 of this report contains a table of the penetration seals found impaired, between August 31, 1988 and September 30, 1988, in relation to the fire zone where they were found. The
- impairment designator terms include
- I
l No Seal NOS >
J Hole in Seal HOL i i Void in Seal VIS l Depth Not Creat Enough DPT l Color / Cell Structure CEL L l Seal Degradation DEG
< i
'
!
An hourly fire watch patrol had been established for the above areas
{ previously due to other fire protection concerns. Therefore, the [
- requirements of Tech. Spec. Action Statement 3.7.11.a are met. '
Technical Specification 3.7.11 states: f i !
! "All fire penetrations (including cable penetration barriers, I
'
fire doors and fire dampers), in fire zone boundaries, l protecting safety related areas shall be functional." I
,
i l Technical Specification Action Statement 3.7.11.a states: :
i
) "With one or more of the above required fire barrier i
, penetrations non-functional, within one (1) hour either l i establish a continuous fire watch on at least one (1) side of l 1 the affected penetration, or verify the OPERABILITY of fire i
'
! detectors on at least one (1) side of the non-functional fire l barrier and establish an hourly fire watch patrol. Restore the 1 non-functional fire barrier penetration (s) to functional status i j within 7 days or, in lieu of any other report required by J 3 Specification 6.9.1, prepare and submit a Special Report to the !
l Commission pursuant to Specification 6.9.2 within the next 30 l
- days outlining the action taken, the cause of the non-functional -
- penetration and plans and schedule for restoring the fire [
j barrier penetration (s) to functional status."
,
h
- ;
.
!
_ _ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
.'
,
,N!/IT 1 SPECIAb REPORT 88-3-2 -3-TABLE OF INOPERABLE PENETRATION SMALS 8/31/88 - 9/30/88 i
AREA NOS HUIj VI S. DPT CEL DEG.
I U-1 Relay Room 8 16 17 8 2 U-1 1A 125 V Battery Room 1 * 2 1 U-l #1 250 V Battery Room 3 * 1 1 5
.
- 12 RHR Pump Room 2 U-1 #3 Stairwell 1 1 U-1 84' Elevation, Aisle #1 4 1 !
Auxiliary Buildinq !
'
Three of these penetrations are 18"x8" and one penetration is 8"x6"; all contain fire dampers with NOS around
,
perimeter of dampers i
APPARENT _CAUSE_OF_ OCCURRENCE;
'
The cause of the degraded fire barrier penetrations could not be positively determined.
'
i The east wall penetrations (discovered 7/13/88) from the Relay Room
! side "appeared" nealed visually due to the use of a buching on the
,
sleeve which hid the gap. The 3.5" south wall penetrations
- (discovered 7/25/88) also appeared scaled from the Relay Room side, i as deceribed in the Description of Occurrence section. Closer inspection, as required by the Seal Penetration Review Group procedures, revealed the nature of the impairments. Technical Specification Surveillance 4.7.11 requires verification of the functional status of fire barrier penetrations every eighteen nontha via a visual inspection. This inspection would not necessarily
- identify the non-functional status of the subject penetrations.
'
I'
The 5.5" south wall penetration (found July 25) is located in a +
difficult to reach location. The gap in the seal may have formed due (
to shrinkage. It does not appear as though a cable was pulled j (forming the cap). '
The 3.5" north wall pen etration (found July 28) is alao located in a l difficult to reach loca tion. The gap in the seal appearn to have i i formed as a result of a cable pull. It has not been determined when l or by whom the cable was pulled. l I
The penetrations with non-functional seals, found between August 2, -
1938 and September 30, 1988, are similar in configuration (except as l i noted) to the penetrations identified in the origial issue of this Special Report, The cause of their degraded condition also could not i positively be determined. l l
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _
. ,
.
, . PlIT 1 SPECIAL REPORT 88-3-2 -4-AN ALY S I S O r* OC " Wi.-
The funct' ne c. r rity of the penetration fire barriers ensures that firet; 5 i" confined or adequately retarded from spreading to adjacent po . e of the facility. This design feature minimizes the possibility of a single fire involving several areas of the facility. The fire barrier penetration seals are a passive element in the facility fire protection program and are subject to periodic inspections. This report satisfies the reporting requirements of Technical Specification 3.7.11.a pursuar.t to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire barrier impairments is greater than seven (7) days. Appropriate actions were already in place in accordance with the requirements of
) Technical Specification Action Statement 3.7.11.a to establish a one hour roving fire watch for the impaired fire barriers once the impairments were identified.
. The subject fire area contains detection in addition to the roving fire watch patrol. Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve an adjacent area. This occurrence therefore involved no undue risk to the health or safety of the public.
CORRECTIVE _ACTIOf[;
The hourly fire watch, as addressed in the Description of Occurrence ae: tion, will continue until all fire protection concerns associated with these areas are resolved.
l The repair of the penetrations was not accomplished within seven (7)
'
days due to the additional review being conducted by the Penetration Seal Task Force. Upon completion of this review the penetrations will be sealed.
Those penetrations in the Relay Room (a halon discharge area) which either have no seal or holes through the seal have been sealed using approved station procedure M3Y-1, "Installation of Fire Barrier and Flood Protection Seals".
This review and corrective action will be completed in accordance
,
with PSE&G letter NLC-N88037, dated March 4, 1988, to the NRC which discusses the Penetration Seal Review Program schedule and the telecommunication between PSE&G and the NRC Region 1 office conducted on August 26, 1938.
j y*
General Manager -
Salem Operations
,
i HJP:pe SORC Mtg.88-082