. _

f November 18, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

COMMENTS ON FORT ST. VRAIN UPDATED FSAR, REVISION N0. 4 ,

We have reviewed your submittal dated July 22, 1986 (P-86466) transmitting the Fort St. Vrain-Updated FSAR, Revision No. 4. This review included Attachment 1 C to your letter, and resulted in the following comments.

1. Section 3.4.12 - Your response to NRC Comment #27 is unclear.

Please clarify your internal schedule for justifying replacement of full-length reflector blocks with half-length blocks. This should be done in the next FSAR update.

i 2. Section 7.3.1.2.1, page 7.3-9, Rev. 4 .This section, as corrected-by Rev. 4, is in error since Figure 7.3-20 does not contain a line indicating manual adjustments by steps of the PPS setpoints as indicated in Section 7.3.1.2.1 (refer to Attachment C to P-86466, NRC Comment #4).

3. Table B.5 PSC's response to NRC Comment #20, Attachment C to P-86466, indicates that Table B.5-4 is on two sheets back-to-back.

If this is a correct statement, please provide us with a copy of this table. Our FSV FSAR copy appears to be incomplete.

Sincerely, originalsignedby Kenneth L. Heitner, Project Manager Standardization and Special 8611240040 861118 Projects Directorate PDR ADOCK 05000267 p PDR Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

. Docket J11e _ FMiraglia JPartlow HBerkow NRC PDR . OGC-Bethesda HThomspon KHeitner.

Local PDR EJordan ACRS (10)' 0 Lynch-PBSS , Reading BGrimes PNoonan PBSS -P ~ PBSM KHeitner:cw OL  : HB'eskbn j/86 11/ ht'/86 11/f/86- 11/IV/86 w -. = y- 3 --- w

i

  1. 4 d$ n UNITED STATES i

I .j NUCLEAR REGULATORY COMMISSION

% .* WASHINGTON, D. C. 20555

\.....f November 18, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

COMMENTS ON FORT ST. VRAIN UPDATED FSAR, REVISION NO 4 We have reviewed your submittal dated July 22, 1986 (P-86466) transmitting the Fort St. Vrain Updated FSAR, Revision No. 4.

This review included Attachment C to your letter, and resulted in the following comments.

1.

Section 3.4.12 - Your response to NRC Coment #27 is unclear.

Please clarify your internal schedule for justifying replacement of full-length reflector blocks with half-length blocks. This should be done in the next FSAR update.

2.

Section 7.3.1.2.1, page 7.3-9, Rev. 4 - This section, as corrected by Rev. 4, is in error since Figure 7.3-20 does not contain a line indicating manual adjustments by steps of the PPS setpoints as indicated in Section 7.3.1.2.1 (refer to Attachment C to P-86466, NRC Comment #4).

3. Table B.5 PSC's response to NRC Comment #20, Attachment C to '

P-86466, indicates that Table B.5-4 is on two sheets back-to-back.

If this is a correct statement, please provide us with a copy of this table. Our FSV FSAR copy appears to be incomplete.

Sincerely, Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B <

Office of Nuclear Reactor Regulation cc: See next page 1

l i

Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Nuclear Engineering Division Albert J. Hazle, Director Public Service Company Radiation Control Division of Colorado Department of Health P. O. Box 840 4210 East 11th Avenue Denver, Colorado 80201 Denver, Colorado 80220 Mr. David Alberstein, 14/159A GA Technologies, Inc. Mr. J. W. Gah.n, Manager Post Office Box 85608 Nuclear Production Division San Diego, California 92138 Public Service Company of Colorado 16805 Weld County Road 19-1/2 I:r. H. L. Brey, Manager Platteville, Colorado 80651 Nuclear Licensing and Fuel Division Public Service Company of Colorado Mr. L. W. Singleton, Manager P. O. Box 840 Quality Assurance Division Denver, Colorado 80201 Public Service Company of Colorado 16805 Weld County Road 19-1/2 Senior Resident Inspector Platteville, Colorado 80651 U.S. Nuclear Regulatory Commission P. 0. Box 840 Mr. R. F. Walker Platteville, Colorado 80651 Public Service Company of Colorado Post Office Box 840 Kelley, Stansfield & 0'Donnell Denver, Colorado 92138 Public Service Company Building Room 900 '

Comitment Control Program 550 15th Street Coordinator v' Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Regional Administrator, Region IV Denver, Colorado 80211 U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency  ;

1 Denver Place l 999 18th Street, Suite 1300 i Denver, Colorado 80202-2413

)

1