Oeubiicservice~
- ==< = --
2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 December 8, 1986 Fort St. Vrain Unit No. 1 P-86659 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. H. N. Berkow, Director i
Standardization and Special Projects Directorate Docket No.
50-267
SUBJECT:
Comments on the Updated FSAR, Revision 4
REFERENCE:
NRC Letter Heitner to Williams, dated November 18, 1986 (G-86608)
Dear Mr. Berkow:
In the referenced letter the NRC raised three concerns pertaining to the Updated FSAR, Revision 4.
The following are the NRC's comments and PSC's resolutions:
1.
NRC Comment:
Section 3.4.12 Your response to NRC Coment
- 27 is unclear.
Please clarify your internal schedule for justifying replacement of full-length reflector blocks with half-length blocks.
This should be done in the next FSAR update.
PSC Response:
The referenced section should be 3.4.1.2.
This justification will be included in Revision 5 of the Updated FSAR.
2.
NRC Comment:
Section 7.3.1.2.1, page 7.3-9, Rev. 4 - This section, as corrected by Rev.
4, it in error since Figure 7.3-20 does not contain a line indicating manual adjustments by steps of the PPS setpoints as indicated in Section 7.3.1.2.1
.h (refer to Attachment C to P-86466, NRC Comment k\\
\\
- 4).
t) \\
8612220260 861208 gDR ADOCKOS00g7
r Page 2 December 8,1986 PSC Response:
The new Figure 7.3-20, which should have been included in Revision 4 of the Updated FSAR, was omitted in error.
Revision 5 will place the correct figure in the Updated FSAR.
3.
NRC Comment:
Table B.5 PSC's response to NRC Comment #20, Attachment C to P-86466, indicates that Table B.5-4 is on two sheets back-to-back.
If this is a correct statement, please provide us with a copy of this table. Our FSV FSAR copy appears to be incomplete.
PSC Response:
Table B.5-4 is comprised of one sheet of paper printed on both sides. Enclosed are 13 copies of Table B.5-4.
If you have any questions or comments, please contact Mr. M. H.
Holmes at (303) 480-6960.
Very truly yours, llllL<y &Wf McAA H. L. Brey, Manager Nuclear Licensing and Fuels HLB /BRD:jmt Enclosures 1
i
UPDATED FSAR Revision 2 Table 8.5-4
[]
(Page 1 of 2)
C/
ANSI STANDAROS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS OA PRCGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix 8 d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
U j
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, 4eceiving, Storage, and Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, 1
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guice 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Insoection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inscection, Examination and Testing Personnel for the Construction Phase of Nuclear Power s'
l Plants (Stancard) and Regulatory Guide 1.58, August 1973.
UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV CPERATIONS CA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draf t 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
c) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials anc Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
I x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE:
Documents referenced above from d) through x) inclusive do not apply in their entirety.
Specific exceptions to these documents are set forth in Section 8.5.19.
O
UPDATED FSAR Revision 2 Table 8.5-4
(
)
(Page 1 of 2)
ANSI STANDARDS AND REGULATORY DCCUMENTS APPLICA8LE TO FSV OPERATIONS QA PRCGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical. Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix 8 d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972, h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, 4eceiving, Storage, and Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of I.:strumentation and Electric Equipment Ouring the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and Testing Personnel for the Construction Phase of Nuclear Power e
i Plants (Standard) and Regulatory Guide 1.58, August 1973.
_. - ~ -
UPDATED FSAR Revision 2 Table B.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS QA PRCGRAM n) N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Oraf t 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, 1
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and i
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
l v) N45.2.23-1978, Qualification of Quality Assurance Program Audit l
Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
l l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Occuments referenced above from d) through x) inclusive do i
not apoly in their entirety.
Specific exceptions to these documents are set forth in Section S.5.19.
O l
t
UPDATED FSAR Revision 2 Table 8.5-4
[]
(Page 1 of 2)
V-ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS QA PRCGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 i
e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 j
g) N45.2-1971, Quality Assurance Program Requirements for Nuclear i O l
Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
a O I
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components Ouring the Construction Phase of Nuclear Power Plants (Standard)
I and Regulatory Guide 1.37, March 16, 1973.
j i) N45.2.2-1972, Packaging, Shipping, 4eceiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, i
i March 16, 1973.
l j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, 1
March 16, 1973.
4 k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power i
Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Insoection, Examination and Testing Personnel for tne Construction Phase of Nuclear Power 4
J, l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
i
UPDATED FSAR Revision 2 Table B.5-4 (Page 2 of 2)
ANSI STANDARDS ANO REGULATORY C0CUMENTS APPLICABLE TO FSV OPERATIONS CA PROGRAM n) N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Oraft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, 1
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
I x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Documents referenced above from d) through x) inclusive do not apoly in their entirety.
Specific excections to these documents are set forth in Section 3.5.19.
O
UPDATED FSAR Revision 2 Table 8.5-4
/^)
(Page 1 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS CA PRCGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix 8 d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear G
l Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
O h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972,
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and O
s Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY COCUMENTS APPLICABLE TO FSV OPERATIONS CA PROGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Oraft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
r) N45.2.12-1974, Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Perscnnel, and i
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
I x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Documents referenced above from d) through x) inclusive do not apoly in their entirety.
Soecific exceotions to these documents are set forth in Section B.S.19.
O
UPDATED FSAR Revision 2 Table B.5-4 A
(Page 1 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS QA PRCGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements Ouring Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements Ouring the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, 4eceiving, Storage, and Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and y
Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
IIPDATED FSAR aevisien 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY COCUMENTS APPLICA8LE TO FSV CpERATICNS QA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, 1
June 1976.
r) N45.2.12-1974, Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, 1
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref.12 and 13).
l l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
I x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
j l NOTE: Documents referenced above from d) through x) inclusive do not apply in their entirety.
Specific exceptions to these documents are set forth in Section 3.5.19.
I
.e.
i N
Y UPDATED FSAR I
'~
0 Revision 2 Table *B.5-4 i
a
.O (Page 1 of 2)
+,
j' ANSI STANDARDS AND REGULATCRY DOCUMENTS APPLICA8LE TO FSV OPERATIONS OA PRCGRAM 4
1 s
i
)
a) Final Safety' Analysis' Report'- Appendix B (Amendment 32) b) FSV Tecknical Specifications
'c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix 8 l
d) + WASH-1283, Guidance on Quality Assurance Requirements Ouring 1
- Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 i
e) WASH-1284, Guidance on Quality Assurance Requirements During the Operati,ons Phase of Nuclear Power Plants, dated 10/26/73 1
f) WASH-1309, Guidance on Quality Assurance Requirements During the j
Construction Phase of. Nuclear Power Plants, dated 5/10/74 l
g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
4
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and
}
Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
?
1 j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
3 j
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for i
Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power i
Generating Stations (Standard IEEE) and Regulatory Guide 1.30, j
l August 11, 1972.
i
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete j
and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 1
j m) N45.2.6-1973, Qualifications of Insoection, Examination and i
i Testing Personnel for tne Construction Phase of Nuclear Power l
l Plants (Standard) and Regulatory Guide 1.58, August 1973.
l 1
1
. ~. _ -,, _. _ _ _ _ _, _ _ _.
UPDATED FSAR Revision 2 Table B.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY C0CUMENTS APPLICABLE TO FSV OPERATIONS QA PROGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) o) N45.2.9-1374, Requirecents for Collection, Storage and Maintenance cf Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terns and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, Seotember 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit l
Personnel for Nuclear Power Plants (Standard) and Regulatory l
Guide 1.146 (see Ref. 12 and 13).
l l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Documents referenced above from d) through x) inclusive do l
not apply in their entirety.
Specific exceptions to these documents are set forth in Section B.5.19.
O
(
UPDATED FSAR Revision 2 Table B.5-4
/^N (Page 1 of 2)
(
)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS OA PRCGRAM a) Final Safety Analysis Report - Appendix B (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix E d) WASH-1283, Guidance on Quality Assurance Requirements Ouring Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear N-])
/'
l Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
-k) N45.2.4-1972, Supplementary Guality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations (Standara IEEE) and Regulatory Guide 1.30, 1
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m
m) N45.2.6-1973, Qualifications of Inspection, Examination and I
Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Stancard) and Regulatory Guice 1.58, August 1973.
UPDATED FSAR Revision 2 Table B.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICA8LE TO FSV OPERATIONS QA PROGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Oraft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of
[
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
c) N45.2.12-1974, Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) si N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, i
Administrative Controls for Nuclear Power Plant Personnel and i
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
1 v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulat$ry Guide 1.21, Revision 1, June 1974 (Reference 19).
l l x) Regulatory Guide 4.1, Revision 1 April 1975 (Reference 19).
l l
l NOTE: Occuments referenced above from d) through x) inclusive do not apply in their entirety.
Specific exceptions to these l
documents are set forth in Section B.5.19.
O
r UPDATED FSAR Revision 2 Table 8.5-4 (Page 1 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS QA PRCGRAM a) Final Safety Analysis Report - Appendix B (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
~
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated E/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard)
I and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and O
Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
1 UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATIONS CA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requ'rements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) l o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurarce Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2,
{
l June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, i
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
I x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Documents referenced above from d) through x) inclusive do not apply in their entirety.
Specific excections to these documents are set forth in Section 3.5.19.
O
UPDATED FSAR Revision 2 Table B.5-4 b(3 (Pege 1 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICA8LE TO FSV OPERATIONS OA PRCGRAM a) Final Safety Analysis Report - Appendix B (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During tha Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, 1
March 16, 1973.
i k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment During the Construction of Nuclear Power l
Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
l
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for l
Installation, Inspection, and Testing of Structural Concrete l
and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and O'
Testing Personnel for the Construction Phase of Nuclear Poeer l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
._y..
,,m..
UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY C0CUMENTS APPLICABLE TO FSV CPERATIONS QA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American Naticnal Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Occuments referenced above from d) through x) inclusive co not apoly in their entirety.
Specific exceptions to these documents are set forth in Section 3.5.19.
UPDATED FSAR Revision 2 Table 8.5-4 V]
' ('
(Page 1 of 2)
ANSI STANDARDS AND REGULATORY DOCUMENTS APPLICA8LE TO FSV OPERATIONS OA PRCGRAM a) Final Safety Analysis Report - Appendix B (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973,
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, 1
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 m) N45.2.6-1973, Qualifications of Inspection, Examination and l
s)
Testing Personnel for the Construction Phase of Nuclear Power s
1 Plants (Standard) and Regulatory Guide 1.58, August 1973.
UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY 00CUMENTS APPLICABLE TO FSV OPERATICNS CA PRCGRAM n) N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Oraft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guide 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
/
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Oraft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Occuments referenced above from d) through x) inclusive do not apoly in their entirety.
Specific exceptions to these documents are set forth in Section 8.5.19.
O
UPDATED FSAR Revision 2 Table 8.5-4 (Page 1 of 2)
J ANSI STANDARDS AND REGULATORY COCUMENTS APPLICA8LE TO FSV OPERATIONS QA PROGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix B d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH-1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear p
l Power Plants (Standard) and Regulatory Guide 1.28, June 7,1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
- 1) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (Ouring the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, 1
March 16, 1973.
l k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Instrumentation and Electric Equipment Ouring the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, 1
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel Ouring the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 p
m) N45.2.6-1973, Qualifications of Inspection, Examination and y
Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Standard) and Regulatory Guide 1.58, August 1973.
UPDATED FSAR Revision 2 Table 8.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY COCUMENTS APPLICABLE TO FSV OPERATIONS CA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assurance Terms and Definitions (Standard) and Regulatory Guice 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, Jur.e 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guida 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and l
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
l w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Documents referenced above from d) through x) inclusive do l
not apoly in their entirety.
Specific excections to these documents are set forth in Section B.5.19.
O i
[
UPDATED FSAR Revision 2 Table 8.5-4 U(7 (Page 1 of 2)
ANSI STANDARDS AND REGULATORY DOCUMENTS APPLICABLE TO FSV OPERATIONS OA PROGRAM a) Final Safety Analysis Report - Appendix 8 (Amendment 32) b) FSV Technical Specifications c) USNRC Quality Assurance Criteria for Nuclear Power Plants, 10CFR50, Appendix 8 d) WASH-1283, Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -
Revision 1, dated 5/14/74 e) WASH-1284, Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants, dated 10/26/73 f) WASH.1309, Guidance on Quality Assurance Requirements During the Construction Phase of Nuclear Power Plants, dated 5/10/74 g) N45.2-1971, Quality Assurance Program Requirements for Nuclear l
Power Plants (Standard) and Regulatory Guide 1.28, June 7, 1972.
h) N45.2.1-1973, Cleaning of Fluid Systems and Associated Components During the Construction Phase of Nuclear Power Plants (Standard) l and Regulatory Guide 1.37, March 16, 1973.
i) N45.2.2-1972, Packaging, Shipping, Receiving, Storage, and Handling of items for Nuclear Power Plants (During the Construction Phase) (Standard) and Regulatory Guide 1.38, l
March 16, 1973.
j) N45.2.3-1973, Housekeeping during the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.39, l
March 16, 1973.
k) N45.2.4-1972, Supplementary Quality Assurance Requirements for Installation, Inscection and Testing of Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations (Standard IEEE) and Regulatory Guide 1.30, l
August 11, 1972.
- 1) N45.2.5-1974, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants (Standard) and Regulatory Guide 1.94 l
m) N45.2.6-1973, Qualifications of Inspection, Examination and Testing Personnel for the Construction Phase of Nuclear Power l
Plants (Standard) and Regulatory Guide 1.53, August 1973.
l l
l
UPDATED FSAR Revision 2 Table B.5-4 (Page 2 of 2)
ANSI STANDARDS AND REGULATORY DOCUMENTS APPLICABLE TO FSV OP5 RATIONS QA PRCGRAM n)
N45.2.8, Supplementary Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants (Draft 3, Rev. 3, April 1974) j o) N45.2.9-1974, Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants (Standard) p) N45.2.10-1973, Quality Assuruce Terms and Definitions (Standard) and Regulatory Gutce 1.74 q) N45.2.11-1974, Quality Assurance Requirements for Design of l
Nuclear Power Plants and Regulatory Guide 1.64, Revision 2, l
June 1976.
r) N45.2.12-1974, Requirements.for Auditing of Quality Assurance Programs for Nuclear Power Plants (Standard) s) N45.2.13, Quality Assurance Requirements for Control of Procurement of Equipment, Materials and Services for Nuclear Power Plants (Draft 3, Rev. 3, June 1975) t) American National Standards Institute Standard ANSI N18.7-1972, l
Administrative Controls for Nuclear Power Plant Personnel and l
Regulatory Guide 1.33 (See Ref. 7).
u) American National Standards Institute Standard ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, and i
Regulatory Guide 1.8, September 1975.
v) N45.2.23-1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Standard) and Regulatory Guide 1.146 (see Ref. 12 and 13).
I w) Regulatory Guide 1.21, Revision 1, June 1974 (Reference 19).
l x) Regulatory Guide 4.1, Revision 1, April 1975 (Reference 19).
l NOTE: Occuments referenced above from d) through x) inclusive do not apply in their entirety.
Specific exceptions to these documents are set forth in Section B.5.19.
O