Category:Letter type:RNP
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:RNP"
The following 200 pages are in this category, out of 563 total.
(previous page) (next page)R
- RNP-RA/01-0027, Transmittal of Emergency Procedure Revisions
- RNP-RA/01-0159, Transmittal of Emergency Procedure Revisions
- RNP-RA/02-0001, December 2001 Monthly Operating Report for H. B. Robinson, Unit 2
- RNP-RA/02-0009, Response to NRC Request for Additional Information for Fourth Ten-Year Interval Inservice Testing Program Plan
- RNP-RA/02-0013, Occupational Radiation Exposure Report
- RNP-RA/02-0018, Request for Amendment, Modification of TS Requirements for Containment Vessel Spray Nozzle Testing Specified by Surveillance Requirement (SR) 3.6.6.8
- RNP-RA/02-0020, Notification of Spent Fuel Shipment
- RNP-RA/02-0031, Implementation of Recommendations for Irradiated Reactor Fuel Shipment
- RNP-RA/02-0033, Part 1 of 2, H.B. Robinson Steam Electric Plant, Unit No. 2, Report of Analysis of Surveillance Capsule X for Reactor Vessel Radiation Surveillance Program
- RNP-RA/02-0036, Response to Request for Additional Information Re Fourth Ten-Year Interval Inservice Inspection Program
- RNP-RA/02-0040, Unauthorized Boarding of Train Transporting Spent Fuel Shipment
- RNP-RA/02-0041, Submittal of Information Requested by NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
- RNP-RA/02-0045, Semiannual Groundwater Monitoring Report, (Encl. 2G)
- RNP-RA/02-0052, Transmittal of Emergency Procedure Revisions
- RNP-RA/02-0063, 2001 Annual Radioactive Effluent Release Report
- RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program
- RNP-RA/02-0067, Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term
- RNP-RA/02-0071, Advance Notification of Spent Fuel Shipment Consisting of Radioactive Material in IF-300 Series Shipping Cask(S): Cask Id No. USA/9001/B()F; S/N IF-301, S/N IF-302
- RNP-RA/02-0072, Submittal of 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
- RNP-RA/02-0074, Revision to the 2001 Annual Radioactive Effluent Release Report
- RNP-RA/02-0076, Request for Technical Specifications Change Regarding Containment Vessel Spray Nozzle Test Frequency
- RNP-RA/02-0077, Radiological Environmental Operating Report for 2001
- RNP-RA/02-0082, Advance Notification of Spent Fuel Shipment Consisting of Radioactive Material in IF-302 Series Shipping Cask(S)
- RNP-RA/02-0084, Revision 8 to EPCLA-02, Emergency Action Level User'S Guide.
- RNP-RA/02-0093, Response to NRC Request for Additional Information on Steam Generator Inservice Inspection Results
- RNP-RA/02-0100, Transmittal of Emergency Procedure Revisions
- RNP-RA/02-0102, June 2002 Monthly Operating Report for H.B. Robinson Steam Electric Co., Unit 2
- RNP-RA/02-0104, License No. DPR-23, Response to Requests for Additional Information on Amendment Request to Increase Authorized Reactor Power Level
- RNP-RA/02-0109, Response to Request for Additional Information on Technical Specifications Change Regarding Containment Vessel Spray Nozzle Test Frequency
- RNP-RA/02-0115, Supplement to Amendment Request Regarding Increase of Authorized Reactor Power Level
- RNP-RA/02-0118, Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term
- RNP-RA/02-0121, Exemption Request - Operator Requalification Program Cycle
- RNP-RA/02-0122, Reactor Vessel Head Inspection Plan for Refueling Outage 21
- RNP-RA/02-0126, Submittal of Information Requested by NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.
- RNP-RA/02-0127, Submittal of NRC Correspondence Distribution List Update from Carolina Power & Light Company
- RNP-RA/02-0128, Response to Request for Additional Information Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.
- RNP-RA/02-0129, Response to Regulatory Information Summary 2002-009, Preparation and Scheduling of Operator Licensing Examinations
- RNP-RA/02-0130, Storage of Classified Information
- RNP-RA/02-0131, Transmittal of Emergency Procedure Revisions
- RNP-RA/02-0133, Response to Request for Additional Information on Amendment Request to Increase Authorized Reactor Power Level
- RNP-RA/02-0136, Response to Request for Additional Information on Technical Specifications Change Regarding Selective Implementation of Alternative Radiological Source Term
- RNP-RA/02-0142, August 2002 Monthly Operating Report for H. B. Robinson Unit 2
- RNP-RA/02-0151, Withdrawal of Relief Request Number RR-06 for the Fourth Ten-Year Interval Inservice Inspection Program
- RNP-RA/02-0155, Additional Information in Support of Technical Specifications Change Regarding Selective Implementation of Alternative Radiological Source Term
- RNP-RA/02-0159, Supplement to Application for Renewal of Operating License
- RNP-RA/02-0160, Transmittal of Emergency Procedure Revisions
- RNP-RA/02-0163, Proposed Additional Condition for the Amendment Request to Increase Authorized Reactor Power Level
- RNP-RA/02-0166, Relief Request No. 18 Regarding Examination of Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for Fourth Ten-Year Inservice Inspection Interval
- RNP-RA/02-0168, Revised Additional Condition for the Amendment Request to Increase Authorized Reactor Power Level
- RNP-RA/02-0169, Completion of Commitment for Implementation of Technical Specifications Change Regarding Post-Accident Sampling System Elimination
- RNP-RA/02-0170, Revised Relief Request No. 18 Regarding Examination of the Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for the Fourth Ten-Year Inservice Inspection Interval
- RNP-RA/02-0171, Relief Request No. 18 Regarding Examination of the Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for Fourth Ten-Year Inservice Inspection Interval
- RNP-RA/02-0172, Steam Generator Tube Plugging During Refueling Outage 21
- RNP-RA/02-0174, October 2002 Monthly Operating Report for H B Robinson Unit 2
- RNP-RA/02-0175, Submittal of Results of Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspections Performed During Refueling Outage 21
- RNP-RA/02-0180, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis
- RNP-RA/02-0182, Submittal of 30-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
- RNP-RA/02-0185, November 2002 Monthly Operating Report for H. B. Robinson, Unit 2
- RNP-RA/02-0187, Annual Report of Changes to or Errors Discovered in Acceptable Loss-of-Coolant Accident Evaluation Model Application for Emergency Core Cooling System
- RNP-RA/02-0190, Additional Information Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.
- RNP-RA/03-0001, Response to Request for Additional Information Regarding 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity
- RNP-RA/03-0002, Transmittal of Emergency Procedures Revisions
- RNP-RA/03-0006, Request for Technical Specifications Change Regarding Inoperable Analog Rod Position Indication for Control Rod H-10
- RNP-RA/03-0007, Response to NRC Request 9 of Request for Additional Information Regarding Severe Accident Mitigation Alternatives
- RNP-RA/03-0008, Schedule for Providing Supplemental Response to Request for Additional Information
- RNP-RA/03-0012, Request for Relief Pertaining to Examination Coverage Less than Essentially 100 Percent
- RNP-RA/03-0013, Supplement to Amendment Request Regarding Full Implementation of Alternative Source Term (TAC No. MB5105) Results of Control Room Envelope Tracer Gas Inleakage Tests
- RNP-RA/03-0014, Response to Request for Additional Information on TS Change Regarding Inoperable Analog Rod Position Indication for Control Rod H-10
- RNP-RA/03-0016, Supplement to Amendment Request Regarding Full Implementation of the Alternative Source Term
- RNP-RA/03-0017, Cycle-22 Startup Test Report
- RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report
- RNP-RA/03-0022, Request for Exemption from 10 CFR 54.21(b)
- RNP-RA/03-0023, Twenty-Day Response to Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- RNP-RA/03-0030, Transmittal of Emergency Procedure Revisions for H. B. Robinson Steam Electric Plant, Unit No. 2
- RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements
- RNP-RA/03-0036, Submittal of Renewed National Pollutant Discharge Elimination System Permit No. SC0002925
- RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron
- RNP-RA/03-0041, Supplemental Pressure Test Information for the Refueling Outage 21 Inservice Inspection Report
- RNP-RA/03-0043, Additional Information Regarding Adequacy of Delayed Offsite Power Circuit
- RNP-RA/03-0048, Occupational Radiation Exposure Report
- RNP-RA/03-0055, Radiological Environmental Operating Report - 2002
- RNP-RA/03-0060, Transmittal of Emergency Procedure Revisions
- RNP-RA/03-0061, Transmittal of TS Bases Revisions
- RNP-RA/03-0067, Withdrawal of Request for Exemption from 10 CFR 54.21(b)
- RNP-RA/03-0070, Request for Technical Specifications Change Regarding One-Time Extension of Containment Type a Test Interval
- RNP-RA/03-0071, Status Update for NRC Bulletin 88-09, Thimble Tube Thinning in Westinghouse Reactors.
- RNP-RA/03-0076, Transmittal of Emergency Procedures EPPRO-04, Rev. 4 & EPCLA-02, Rev. 10
- RNP-RA/03-0082, Notification of Spent Fuel Shipment
- RNP-RA/03-0084, Response to NRC Request for Additional Information on Steam Generator for Inservice Inspection Results
- RNP-RA/03-0085, June 2003 Monthly Operating Report for H. B. Robinson, Unit 2
- RNP-RA/03-0091, Notification of Spent Fuel Shipment
- RNP-RA/03-0096, Transmittal of Emergency Procedure Revisions
- RNP-RA/03-0101, Supplement to Request for Technical Specifications Change Regarding One-Time Extension of Containment Type a Test Interval
- RNP-RA/03-0103, Response to Open Confirmatory Items
- RNP-RA/03-0104, Submittal of Information Requested by NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
- RNP-RA/03-0109, Supplement to Amendment Request Regarding Credit for Spent Fuel Storage Pool Dissolved Boron
- RNP-RA/03-0121, Supplement to Amendment Request Regarding One-Time Extension of Containment Type a Test Interval
- RNP-RA/03-0125, Inservice Testing Program, Relief Request IST-RR-8 for Comprehensive Tests
- RNP-RA/03-0127, Voluntary Response to Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations.
- RNP-RA/03-0132, September 2003 Monthly Operating Report for H. B. Robinson, Unit 2
- RNP-RA/03-0136, Transmittal of Emergency Procedure Revisions
- RNP-RA/03-0137, Notification of Spent Fuel Shipment
- RNP-RA/03-0139, Submittal of 90-day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity
- RNP-RA/03-0140, October 2003 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 2
- RNP-RA/03-0142, Transmittal of Emergency Procedure Revisions
- RNP-RA/03-0144, Submittal of Information Requested by NRC Generic Letter 2003-01, Control Room Habitability
- RNP-RA/03-0147, Archaelogical, Cultural, and Historic Resources
- RNP-RA/03-0148, Information Related to the Review Priority for Nuhoms Certificate of Compliance No. 1004, Amendment No. 8
- RNP-RA/03-0158, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
- RNP-RA/03-0159, Revision to the Request for Relaxation from the Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (EA-03-009)
- RNP-RA/03-0160, Response to RAI for Relief Request Pertaining to Examination Coverage Less than Essentially 100 Percent (Relief Request No. 34)
- RNP-RA/03-0161, Revision 0 to EPRO-06, Operation and Maintenance of the Dialogic System, and Revision 12 to EPRAD-01, Environmental Monitoring.
- RNP-RA/03-0414, Supplement to the Request for Relaxation from the Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (EA-03-009)
- RNP-RA/04-0004, December 2003 Monthly Operating Report for H.B. Robinson, Unit 2
- RNP-RA/04-0006, Transmittal of Core Operating Limits Report for Cycle 22
- RNP-RA/04-0008, Response to Request for Summary Description of Reactor Pressure Vessel Head Inspections Planned for Refueling Outage 22 in Accordance with NRC Bulletin 2002-02
- RNP-RA/04-0009, Supplement to Amendment Request Regarding Deletion of Additional Condition Related to Cycle Length
- RNP-RA/04-0011, Revision 6 to EPJIC-06, Joint Information Center Generic Information, and Revision 15 to EPPRO-01, Program Responsibilities.
- RNP-RA/04-0014, Supplement to Amendment Request Regarding Full Implementation of the Alternative Source Term
- RNP-RA/04-0017, Supplement to Amendment Request Regarding Deletion of Additional Condition Related to Cycle Length
- RNP-RA/04-0020, January 2004 Monthly Operating Report for H.B. Robinson, Unit 2
- RNP-RA/04-0021, Revision 8 to EPJIC-02, Revision 8 to EPPRO-00, Revision 3 to EPPRO-05, and Revision 16 to EPPRO-01
- RNP-RA/04-0023, Informational Copy of Operating License & Appendices
- RNP-RA/04-0025, Withdrawal of the Request for Relaxation from the Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurizer Water Reactors
- RNP-RA/04-0026, Nuclear Material Transaction Report
- RNP-RA/04-0028, Withdrawal of Relief Request IST-RR-8 for Inservice Testing Program Comprehensive Tests
- RNP-RA/04-0029, Supplemental Response to the April 29, 2003, Order EA-03-086
- RNP-RA/04-0030, February 2004 Monthly Operating Report for H.B. Robinson, Unit 2
- RNP-RA/04-0034, Transmittal of Emergency Procedures Revisions
- RNP-RA/04-0036, Twenty-Day Response to First Revised Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- RNP-RA/04-0039, Transmittal of Emergency Implementing Procedures EPPRO-03 Revision 17 & EPJIC-03, Revision 6
- RNP-RA/04-0042, Report of Changes Pursuant to 10 CFR 50.59 Between April 1, 2002 and April 1, 2004
- RNP-RA/04-0043, Response to Request for Additional Information for Relief Pertaining to Examination Coverage Less than Essentially 100 Percent (Relief Request No. 34)
- RNP-RA/04-0048, 2003 Annual Radioactive Effluent Release Report
- RNP-RA/04-0052, April 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2
- RNP-RA/04-0053, Steam Generator Tube Plugging Report for Refueling Outage 22
- RNP-RA/04-0054, Radiological Environmental Operating Report - 2003
- RNP-RA/04-0059, Transmittal of Core Operating Limits Report
- RNP-RA/04-0060, Revised Supplemental Response to the April 29. 2003 Order, EA-03-086
- RNP-RA/04-0070, Notification of Intent to Apply Quality Assurance Program for Independent Spent Fuel Storage Installation
- RNP-RA/04-0072, Response to NRC 04/26/04 Letter Re Reactor & Senior Reactor Operator Initial Examination Outlines
- RNP-RA/04-0073, Reactor Operator and Senior Reactor Operator Initial Examinations
- RNP-RA/04-0085, Spent Fuel Shipment Cancellation Notification
- RNP-RA/04-0086, Results of Inspections Conducted in Accordance with the First Revised Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- RNP-RA/04-0087, June 2004 Monthly Operating Report for H. B. Robinson, Unit 2
- RNP-RA/04-0089, Summary of Reactor Pressure Vessel Lower Head Inspection in Accordance with NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary.
- RNP-RA/04-0090, Supplement to Amendment Request Regarding Full Implementation of the Alternative Source Term
- RNP-RA/04-0091, Security Order EA-03-086, Response to Request for Additional Information on the Guard Training and Qualification Plan
- RNP-RA/04-0097, Submittal of 60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.
- RNP-RA/04-0098, Request for Technical Specifications Change to Reactor Coolant System Pressure and Temperature Limits
- RNP-RA/04-0103, July 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 2
- RNP-RA/04-0107, Independent Spent Fuel Storage Installation, NRC Correspondence Distribution List Update
- RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report
- RNP-RA/04-0113, NRC Correspondence Distribution List Update
- RNP-RA/04-0114, Letter from J. F. Lucas to the USNRC, Subject: H.B. Robinson Steam Electric Plant, Unit No. 2 Independent Spent Fuel Storage Installation - Twenty-day Response to Order EA-03-097
- RNP-RA/04-0117, August 2004 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 2
- RNP-RA/04-0119, Transmittal of Emergency Plan Revision
- RNP-RA/04-0121, Response to NRC Request for Additional Information Regarding NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors.
- RNP-RA/04-0127, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections.
- RNP-RA/04-0128, Supplemental Response to the April 29, 2003, Order EA-03-086
- RNP-RA/04-0129, Response to Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.
- RNP-RA/04-0133, Transmittal of Technical Specifications Bases Revisions
- RNP-RA/04-0140, October 2004 Monthly Operating Report for H B Robinson Unit 2
- RNP-RA/04-0146, Response to NRC Request for Additional Information Regarding Technical Specifications Revision of Pressure/Temperature Limits
- RNP-RA/04-0149, November 2004 Monthly Operating Report for the H. B. Robinson, Unit 2
- RNP-RA/04-0150, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
- RNP-RA/05-0001, License Amendment Request Regarding Implementation of the Alternative Source Term
- RNP-RA/05-0002, December 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2
- RNP-RA/05-0005, Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating
- RNP-RA/05-0006, Request for Technical Specifications Change to Core Operating Limits Report (COLR) References
- RNP-RA/05-0011, Request for Exemption from 10 CFR 50.68. Criticality Accident Requirements.
- RNP-RA/05-0013, January 2005 Monthly Report for H. B. Robinson Steam Electric Plant Unit 2
- RNP-RA/05-0024, Notification of the Intent to Store Fuel in an Independent Spent Fuel Storage Installation
- RNP-RA/05-0025, February 2005 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2
- RNP-RA/05-0026, Request for Exemption from 10 CFR 72.212(b)(7)
- RNP-RA/05-0028, Response to NRC Supplemental Request for Additional Information Regarding NRC BL-03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
- RNP-RA/05-0030, Schedule Information Related to Transnuclear Inc. Certificate of Compliance No. 1004. Amendment No. 8
- RNP-RA/05-0035, March 2005 Monthly Operating Reports for H. B. Robinson Steam Electric Plant (Hbrsep), Unit No. 2
- RNP-RA/05-0036, Annual Radioactive Effluent Release Report
- RNP-RA/05-0037, Transmittal of 2004 Occupational Radiation Exposure Report
- RNP-RA/05-0039, Response to NRC Request for Additional Information Regarding Loss of Coolant Accident Alternative Source Term Dose Analysis
- RNP-RA/05-0040, Annual Radioactive Effluent Release Report Supplement - ODCM
- RNP-RA/05-0045, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results
- RNP-RA/05-0046, Response to NRC Request for Additional Information Regarding Exemption from 10 CFR 50.68, Criticality Accident Requirements.
- RNP-RA/05-0047, NRC Correspondence Distribution List Update
- RNP-RA/05-0048, Response to Ncr Request for Additional Information Regarding Proposed Technical Specifications Changes to Section 3.3
- RNP-RA/05-0051, 2004 Radiological Environmental Operating Report for Period January 1, 2004 Through December 31, 2004
- RNP-RA/05-0054, Response to NRC Staff Guidance for Use in Achieving Satisfactory Compliance with February 25, 2002, Order Section B.5.b
- RNP-RA/05-0060, Request for Exemption from 10 CFR 72.212(a)(2), 10 CFR 72.212(b)(2)(i)(A), 10 CFR 72.212(b)(7), & 10 CFR 72.214, & Withdrawal of April 19, 2005 Exemption Request from 10 CFR 72.212(b)(7)
- RNP-RA/05-0062, Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating
- RNP-RA/05-0067, Request for Exemption from 10 CFR 50.68, Criticality Accident Requirements - Supplemental Information
- RNP-RA/05-0071, Request for Exemption from 10 CFR 50.68, Criticality Accident Requirements - Supplemental Information
- RNP-RA/05-0072, Request for Exemption from 10 CFR 72.212
- RNP-RA/05-0076, Response to NRC Supplemental Request for Additional Information Regarding NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
- RNP-RA/05-0097, Supplemental Information Regarding Loss of Coolant Accident Alternative Source Term Dose Analysis
- RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass
- RNP-RA/05-0108, Report of Changes Made in Revisions 3 & 4 of the Physical Security Plan and Revision 1 of the Safeguards Contingency Plan
- RNP-RA/05-0110, B. Robinson Steam Electric Plant, Unit No. 2 - Emergency Response Data System Data Point Library Changes
- RNP-RA/05-0116, Response to NRC Request for Additional Information Regarding February 25, 2002, Order Section B.5.b
- RNP-RA/05-0122, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-Of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System