RNP-RA/04-0149, November 2004 Monthly Operating Report for the H. B. Robinson, Unit 2

From kanterella
Jump to navigation Jump to search
November 2004 Monthly Operating Report for the H. B. Robinson, Unit 2
ML043440105
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/07/2004
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/04-0149
Download: ML043440105 (6)


Text

--

TS 5.6.4 TRM 6.2 2$A Progress Energy Serial: RNP-RA/04-0149 DEC 0 7 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of November 2004.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, auJI d C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment C: NRC Resident Inspector, HBRSEP Dr. W. D. Travers, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas. Inc.

, -,--- , (P Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0149 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 12/2/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: NOVEMBER 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 720.0 7104.4 227662.4
4. HOURS GENERATOR ON LINE 720.0 7068.1 224306.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 538888.0 5180814.0 147558172.0

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0149 .C Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP. UNIT NO. 2 DATE 12/2/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: NOVEMBER 2004 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Comments F: f:Sw.d (Hours) the Reactor2 1: 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain) li-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month.

I Z TS 5.6.4

..: TRM 6.2

~ Progress Eeg Seria RNPRA0-0 14 9 H B..^ ROBNSO STA ELCRC-LN, UNI NO.2 United Stltes 1r Re ry Commission Attn: Docurnent.C~nrlDs WasHig.tn, -'20555 2 DOCKET .NO?.50-261/LICENSE NO. DPR-23:...

":-MONTHLY OPERATING REPORT

. - Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress-Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of November 2004.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, auhK l x3 .

C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP i: -Dr. W. D. Travers, NRC, Region II ----

. . C. P. Patel, NRC, NRR Progress Energy Carolinas, Inc.' '

Robinson Nixlear Plant 3581 West Entrance Road -- : .

Hllrsville, SC 29550

.A

  • United States Nuclear lat-ry, *-mn u'>sso' sion Attachment to Se'nal: -04RNP49A../O4.;; 49 .:J.

Page 1 of 2

- .MONTHLY OPERATING REPORT.-;,

DOCKETNO. 050-0261 4 UNIT I. B. ROBINSON STEAM ELECTRIC PLANT MBRSEP). UNIT NO. 2 DATE 12/2/2004 . : -

COMPLETED BYc TIM SURMA .-

TELEPHONE (843)8574086 .'.>  :.. t .' ' -

REPORTING PERIOD: NOVEMBER 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 720.0 7104.4 227662.4
4. HOURS GENERATOR ON LINE 720.0 7068.1 224306.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 538888.0 5180814.0 147558172.0 I I
7. . .

. I.

.: p 1 . .

  • s'. .. * *\ .,

. . - . . i ..

. ,; ,. , ':i.:

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0149 Page 2of 2

  • . DOCKETNO. 050-0261 .

UNIT NAME HBRSEP. UNIT NO,2 -.

DATE 1212/2004 . - -

COMPLETED BY TIM SURMA . ..

TELEPHONE (843) 857-1086 . .. -

REPORTING PERIOD: NOVEMBER 2004 UNIT SHUTDOWNS

-, ,4- -,, s * ., ~~~~.,;S'- ,... . -.-,.-

No. Date Type Duration Reason' Method of Shutting Down Cause/Correttive Actions/Comments-.,

. Forbd (11ours) the Reaetor Reason: Method.:

- - A-Equipment F (Explain),= . ' IMana mVr

.r ... * -. *a B Mainiertenc&

' Test - Manual Scram C-Refueling 3-Automatic Scram 4 '-RegulatobyRestriction 4-Continuation -

, ,; E-Operator Training &Ucense Examinadeon , 5-Other (Explain) . -

F-Ad ministrative *...'

-'`0-operational Erro (Explain) -

H-Other(Explain)' t,

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month.