Text

Im TS 5.6.4 TRM 6.2 by ProgressEnergy Serial: RNP-RA/03-0140 NOV 06 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UN-IT NO. 2 DOCKET NO. 50-26 l/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, Monthly Operating Reports, and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, Monthly Operating Report, Progress Energy Carolinas, Inc.,

submits the attached report of operating statisticIs and shutdown experience for the month of October 2003.

If you have any questions concerning this matter, please contact me.

Sincerely, LILi?A?L C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road HartswIle, SC 29550

Attachment to Serial: RNP-RA/03-0140 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 11/3/2003 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: OCTOBER 2003

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 745.00 7296.0 219093.99
4. HOURS GENERATOR ON LINE 745.00 7296.0 215774.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 547930.00 5351979.00 141289437.00

Attachment to Serial: RNP-RA/03-0140 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 11/3/03 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: OCTOBER 2003 UNIT SHUTDOWNS No. Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor 2 S: Scheduled 1 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer safety valves.

H. B. ROBINSON STEAM ELECTRIC PLANT OUTGOING REGULATORY CORRESPONDENCE TARGET DATE : 11/10/03__ DATE DUE : 11/15/03 DATE ROUTED : _11/03/03 _

Letter Type: NRC _X_ DHEC INPO NEI Other ___________

MONTHLY OPERATING REPORT RNP-RA/03-0140 REVIEWER NAME REVIEW TYPE REVIEW INITIAL/

DUE BY: DATE John Valentino ORIGINATOR 11/04/03 Tim Surma REVIEW 11/05/03 Terry Simonson REVIEW 11/06/03 CHECKER CHECKER 11/07/03 Chuck Baucom APPROVAL 11/10/03 Note: Each reviewer, by initial, attests that the information that is being provided to the NRC is complete and accurate in all material respects, as required by 10 CFR 50.9(a). For all other correspondence, the information is verified as accurate to the best of the reviewers ability.

COMMITMENTS No. Commitment Statement Actions Responsibility Date None Note 1: Each reviewer is also responsible for verifying the accuracy of any commitments (listed above) and, by initial, accepts responsibility for their organization.

Note 2: Does this correspondence affect earlier outstanding commitments? If yes, revise previous commitments in NTM, as necessary.

LICENSING DOCUMENT CHANGES No. Document & Summary of Change Responsibility Date Sections Affected N/A SPECIAL INSTRUCTIONS Questions regarding this correspondence should be referred J. Valentino RETURN TO: John Valentino Lic/Reg. Programs Ext. 1874