December 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2
ML050190198
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/07/2005
From: Baucom C
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/05-0002, TRM 6.2
Download: ML050190198 (3)


Text

TS 5.6.4 TRM 6.2 OKI Progress Energy Serial: RNP-RA/05-0002 JAN 0 7 2005 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261ALICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of December 2004.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, je ) 6 C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP Dr. W. D. Travers, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville. SC 29550

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/05-0002 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (MBRSEP). UNIT NO. 2 DATE 1/6/2005 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: DECEMBER 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 744.0 7848.4 228406.4
4. HOURS GENERATOR ON LINE 744.0 7812.1 225050.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 561396.0 5742210.0 148119568.0

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/05-0002 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 1/6/2005 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: DECEMBER 2004 UNIT SIIUTDOWNS No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Comments F:rorced (Iours) the Reactor2 S: Schoduk-d 1

Reason:

I Method:

A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & license Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month.