RNP-RA/03-0041, Supplemental Pressure Test Information for the Refueling Outage 21 Inservice Inspection Report

From kanterella
Jump to navigation Jump to search
Supplemental Pressure Test Information for the Refueling Outage 21 Inservice Inspection Report
ML031000205
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/08/2003
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/03-0041
Download: ML031000205 (3)


Text

S.

10 CFR 50.55a 4$ Progress Energy Serial: RNP-RA/03-0041 APR 0 8 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 SUPPLEMENTAL PRESSURE TEST INFORMATION FOR THE REFUELING OUTAGE 21 INSERVICE INSPECTION REPORT Ladies and Gentlemen:

By letter dated August 10, 2001, the 90-day inservice inspection (ISI) summary report was submitted for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Refueling Outage (RO)-20. In the pressure test summary of that report, it was stated that the remaining pressure tests required for the third inspection period of the third ISI interval would be completed and a summary report of these remaining tests would be provided with the Code Required Volume (CRV) relief request at the end of the third interval.

The CRV relief request was submitted by letter dated February 11, 2003, and it did not include the additional pressure test summary information. Review by ISI personnel at I-BRSEP, Unit No. 2, had concluded that the additional pressure test summary information would be more appropriately provided within the RO-21 90-day ISI summary report for HBRSEP, Unit No. 2. However, the determination to include the additional pressure test summary information within the 90-day ISI summary report for RO-21 was not made in sufficient time to include that information. Therefore, this letter is being provided to supplement the RO-21 90-day ISI summary report with the additional pressure test summary information, which is provided in the attachment to this letter.

This information is being provided for completeness of the RO-21 ISI summary report and no additional action is requested. If you have any questions regarding this matter, please contact me.

Sincerely, 61j). &

C. T. Baucom Supervisor - Licensing/Regulatory Programs Progress Energy Carolinas, Inc 3581 West Entrance Road Hartsville, SC29550

United States Nuclear Regulatory Commission Serial: RNP-RA/03-0041 Page 2 of 2 CAC/cac Attachment c: Mr. L. A. Reyes, NRC, Region II Mr. C. P. Patel, NRC, NRR NRC Resident Inspector

K IUnited States Nuclear Regulatory Commission Attachment to Serial: RNP-RAI03-0041 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 SUPPLEMENTAL PRESSURE TEST INFORMATION The table below lists the pressure tests performed during the period after Refueling Outage 20, to the end of the third inservice inspection interval, which was concluded on February 19, 2002.

SYSTEM PROCEDURE PROCEDURE TITLE DATE OF RESULTS*

'NUMBER LAST TEST FW EST-077 Inservice Inspection Pressure Testing of the 8/6/01 SAT Feedwater (FW) System SI EST-078 Inservice Inspection Pressure Testing of 8/29/01 SAT Safety Injection (SI) Pump Discharge Piping CVCS EST-131 Inservice Inspection Pressure Testing of the 1/11/02 SAT Chemical and Volume Control System (CVCS) Outside Containment CS EST-092 Inservice Inspection Pressure Testing of the 6/12/01 SAT

[Containment] Spray (CS) Additive Tank and Associated Piping CVCS EST-093 Inservice Inspection Pressure Testing of the 1/31/02 SAT Chemical and Volume Control System SW EST-094 Inservice Inspection Pressure Testing of the 1/21/02 SAT Service Water (SW) System DFO EST-098 Inservice Inspection Pressure Testing of the 12/12/01 SAT Diesel Fuel Oil (DFO) System Piping AFW EST-082 Inservice Inspection Pressure Testing of 11/14/01 SAT Auxiliary Feedwater (AFW) System SFPC EST-084 Inservice Inspection Pressure Testing of 8/22/01 SAT Spent Fuel Pool Cooling (SFPC) System CCW EST-088 Inservice Inspection Pressure Testing of 1/16/02 SAT Component Cooling Water (CCW) System Inside the Auxiliary Building AFW EST-097 Inservice Inspection Pressure Testing of 12/05/01 SAT Steam Supply Piping to the Steam Driven AFW Pump

  • SAT is defined as "Satisfactory."

No deficiencies were noted for the above Engineering Surveillance Tests (EST). Exceptions were addressed by the normal work request process and retained in the plant records system.