MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, “Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, “Add Action for More than One (D)Rpi Inoperable RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-12-0909 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves2021-12-0909 December 2021 Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20093J0982020-08-21021 August 2020 Issuance of Amendment No. 269 Regarding Technical Specification Change Incorporating Three New Feedwater Bypass Isolation Valves RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error2020-01-21021 January 2020 Request to Correct Administrative Renewed Facility Operating License Error RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses RA-18-0048, Corrected Technical Specification Pages for TSTF-425 License Amendment Request2018-09-25025 September 2018 Corrected Technical Specification Pages for TSTF-425 License Amendment Request ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program ML18099A1302018-04-0505 April 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML18038B2892018-02-0707 February 2018 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17205A2332017-09-29029 September 2017 Issuance of Amendment Regarding Request to Modify the Licensing Basis Alternate Source Term RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-09-16016 September 2016 Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term2016-09-14014 September 2016 License Amendment Request to Modify the Licensing Basis Alternate Source Term ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...2016-02-0303 February 2016 Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-12-22022 December 2015 Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..2015-11-19019 November 2015 Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name2013-04-20020 April 2013 License Amendment Request to Facility Operating Licenses for Change of Licensee Name RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones ML12263A4242012-09-0606 September 2012 License Amendment Request to Delete Technical Specification Reactor Protection System Trip on Steam Generator Water Level Low Coincident with Steam Flow/Feedwater Flow Mismatch RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/12-0028, Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2012-06-0808 June 2012 Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 2024-06-28
[Table view] |
Text
Fib v10 CYR 50.90 Progress Energy MAR 03 2005 Serial: RNP-RA/05-0006 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE TO CORE OPERATING LIMITS REPORT (COLR) REFERENCES Ladies and Gentlemen:
In accordance with the provisions of the Code of Federal Regulations, Title 10, Part 50.90, Progress Energy Carolinas (PEC), Inc., also known as Carolina Power and Light Company, is submitting a request for an amendment to the Technical Specifications (TS) contained in Appendix A of the Operating License for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The proposed amendment would modify the requirements of TS 5.6.5, "Core Operating Limits Report (COLR)."
Specifically, the proposed change would add topical report EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," to the list of documents specified in TS 5.6.5, "Core Operating Limits Report (COLR)." TS 5.6.5 lists the approved methodologies that can be used to determine the core operating limits.
The NRC approved EMF-2103(P)(A) in a letter dated April 9, 2003. In that letter, the NRC specified a number of limitations and conditions that must be met in order to use the subject topical report. One condition requires the submittal of a plant-specific analysis. The plant-specific analysis for HBRSEP, Unit No. 2, is provided in Attachments V and VI. Attachment V provides a non-proprietary version of the analysis EMF-3030(NP), "Robinson Nuclear Plant Realistic Large Break LOCA Analysis," February 2004, that can be released for public disclosure. Attachment VI provides a proprietary version of the analysis EMF-3030(P),
"Robinson Nuclear Plant Realistic Large Break LOCA Analysis," February 2004, that should be withheld from public disclosure. Attachment VII provides an Affidavit from Framatome ANP regarding the proprietary nature of Attachment VI, as required by 10 CFR 2.390.
Progress Energy Carolinas, Inc.
Robinson Nuclear Plant APO 3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/05-0006 Page 2 of 2 Attachment I provides an Affirmation pursuant to 10 CFR 50.30(b).
Attachment II provides a description of the proposed change, a technical justification for the proposed change, a No Significant Hazards Determination, and an Environmental Impact Consideration.
Attachment III provides a markup of the current TS page and Attachment IV provides a retyped page for the proposed TS.
In accordance with 10 CFR 50.91(b), PEC is providing the State of South Carolina with a copy of the proposed license amendment.
PEC requests approval of the proposed license amendment by November 18, 2005 to allow for the use of the specified topical report in the evaluation of the subsequent core reload.
If you have any questions concerning this matter, please contact Mr. C. T. Baucom at (843) 857-1253.
Sincerely, Manager - Support Services - Nuclear RAC/rac Attachments I. Affirmation II. Request for Technical Specifications Change Regarding Revision to Core Operating Limits Report (COLR) References III. Markup of Current Technical Specifications Page IV. Retyped Technical Specifications Page V. EMF-3030(NP), "Robinson Nuclear Plant Realistic Large Break LOCA Analysis,"
February 2004, Non-Proprietary Version VI. EMF-3030(P), "Robinson Nuclear Plant Realistic Large Break LOCA Analysis,"
February 2004, Proprietary Version VII. Framatome ANP Affidavit Regarding Proprietary Attachment VI C: Mr. T. P. O'Kelley, Director, Bureau of Radiological Health (SC)
Mr. H. J. Porter, Director, Division of Radioactive Waste Management (SC)
Dr. W. D. Travers, NRC, Region II Mr. C. P. Patel, NRC, NRR NRC Resident Inspectors, HBRSEP Attorney General (SC)
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/05-0006 Page 1 of 1 AFFIRMATION The information contained in letter RNP-RA/05-0006 is true and correct to the best of my information, knowledge, and belief; and the sources of my information are officers, employees, contractors, and agents of Progress Energy Carolinas, Inc., also known as Carolina Power and Light Company. I declare under penalty of perjury that the foregoing is true and correct.
Executed On:________ __z _
J. W.oyer ce President, gBRSEP, Unit No. 2
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/05-0006 Page 1 of 4 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE REGARDING REVISION TO CORE OPERATING LIMITS REPORT (COLR) REFERENCES Description of the Proposed Change H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications (TS) 5.6.5 contains a list of documents that describe the analytical methods that may be used to determine the core operating limits. TS 5.6.5 also states that these methods shall be those previously reviewed and approved by the NRC and that the approved version shall be identified in the COLR. Progress Energy Carolinas (PEC), Inc., also known as Carolina Power and Light Company, is proposing a change that would add topical report EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," to the list of documents in TS 5.6.5. There is no intent to delete the Large Break LOCA analysis references that are currently listed in TS 5.6.5.
Technical Justification for the Proposed Change EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," has been approved by the NRC as an acceptable methodology. PEC has reviewed this methodology and found it to be appropriate for use on HBRSEP, Unit No. 2.
In the NRC's Safety Evaluation Report (SER), dated April 9, 2003, the NRC specified a number of limitations and conditions that must be met in order to use the subject topical report.
One condition requires the submittal of a plant-specific analysis. The plant-specific analysis for HBRSEP, Unit No. 2, is described in Framatome ANP, Inc., Report EMF-3030(P),
"Robinson Nuclear Plant Realistic Large Break LOCA Analysis," dated February 2004. Report EMF-3030(P) is provided in Attachment VI to this letter. Table 3.4 of EMF-3030(P) provides a discussion of each of the NRC listed conditions and limitations and demonstrates that HBRSEP, Unit No. 2, meets these conditions and limitations. The Large Break LOCA analysis results, as shown in EMF-3030(P), demonstrate that the applicable acceptance criteria are met when using the EMF-2103(P)(A) methodology. Note that the EMF-3030(P) result of 0.68 pounds of total hydrogen generated corresponds to 0.0004 times the maximum hypothetical amount that could be produced if 100% of the clad metal surrounding the fuel reacted, and therefore meets the acceptance criterion of 0.01 times the maximum amount.
One of the limitations specified in the NRC SER states, "The model does not determine whether Criterion 5 of 10 CFR 50.46, long term cooling, has been satisfied. This will be determined by each applicant or licensee as part of its application of this methodology."
Attachment VI does not evaluate long term cooling. For HBRSEP, Unit No. 2, this was evaluated previously in report EMF-2286, "H. B. Robinson Unit 2 Extended Transfer to Cold Leg Recirculation Following a LBLOCA," and was approved by the NRC in a letter dated July 12, 2001.
-I ,.'
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/05-0006 Page 2 of 4 Therefore, the requirements of 10 CFR 50.46 can be met by use of any of the previously accepted methods and by the use of EMF-2103(P)(A).
No Significant Hazards Consideration Determination Progress Energy Carolinas (PEC), Inc., also known as Carolina Power and Light Company, is proposing a change to the Appendix A, Technical Specifications (TS), of Facility Operating License No. DPR-23, for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. This change will revise the requirements of TS 5.6.5, "Core Operating Limits Report (COLR)," to provide an additional analytical methodology to be used to determine acceptable core designs and provide inputs to develop the core operating limits contained in the COLR.
An evaluation of the proposed change has been performed in accordance with 10 CFR 50.91(a)(1) regarding no significant hazards considerations using the standards in 10 CFR 50.92(c). A discussion of these standards as they relate to this amendment request follows:
- 1. The Proposed Change Does Not Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated The proposed methodology will be reviewed and approved by the NRC prior to its use for HBRSEP, Unit No. 2. Analyzed events are assumed to be initiated by the failure of plant structures, systems, or components. The determination of core operating limits in accordance with this new methodology will meet the limitations specified in the NRC safety evaluation of the new methodology. The topical report associated with the new methodology demonstrates that the integrity of the fuel will be maintained and that design requirements will continue to be met. The proposed change does not involve physical changes to any plant structure, system, or component. Therefore, the probability of occurrence for a previously analyzed accident is not significantly increased.
The consequences of a previously analyzed accident are dependent on the initial conditions assumed for the analysis, the behavior of the fuel during the analyzed accident, the availability and successful functioning of the equipment assumed to operate in response to the analyzed event, and the setpoints at which these actions are initiated. The proposed methodology continues to meet applicable design and safety analyses acceptance criteria. The proposed change does not affect the performance of any equipment used to mitigate the consequences of an analyzed accident. As a result, no analysis assumptions are violated and there are no adverse effects on the factors that contribute to offsite or onsite dose as the result of an accident. The proposed change does not affect setpoints that initiate protective or mitigative actions. The proposed change ensures that plant structures, systems, or components are maintained consistent with the safety analysis and licensing bases. Based on this evaluation, there is no significant increase in the consequences of a previously analyzed event.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/05-0006 Page 3 of 4 Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The Proposed Change Does Not Create the Possibility of a New or Different Kind of Accident From Any Previously Evaluated The proposed change does not involve any physical alteration of plant systems, structures, or components, other than allowing for fuel design in accordance with NRC approved methodologies. The proposed methodology continues to meet applicable criteria for Large Break Loss of Coolant Accident (LBLOCA) analysis. No new or different equipment is being installed. No installed equipment is being operated in a different manner. There is no alteration to the parameters within which the plant is normally operated or in the setpoints that initiate protective or mitigative actions. As a result, no new failure modes are being introduced. There are no changes in the methods governing normal plant operation, nor are the methods utilized to respond to plant transients altered. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. The Proposed Change Does Not Involve a Significant Reduction in the Margin of Safety The margin of safety is established through the design of the plant structures, systems, and components, through the parameters within which the plant is operated, through the establishment of the setpoints for the actuation of equipment relied upon to respond to an event, and through margins contained within the safety analyses. The proposed change in the methodology used for LBLOCA analyses does not impact the condition or performance of structures, systems, setpoints, and components relied upon for accident mitigation. The proposed change does not significantly impact any safety analysis assumptions or results. Therefore, the proposed change does not result in a significant reduction in the margin of safety.
Based on the above discussion, PEC has determined that the requested change does not involve a significant hazards consideration.
Environmental Impact Consideration 10 CFR 51.22(c)(9) provides criteria for identification of licensing and regulatory actions for categorical exclusion for performing an environmental assessment. A proposed change for an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed change would not (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increases in the amounts of any effluents that may be released offsite; (3) result in an increase in individual or cumulative occupational radiation exposure. Progress Energy Carolinas (PEC), Inc., also known as Carolina Power and Light Company, has reviewed this request and determined that the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/05-0006 Page 4 of 4 environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows.
Proposed Change The H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications are revised to add a new analytical methodology used to determine acceptable core designs and provide inputs to methodologies that develop the core operating limits in the Core Operating Limits Report (COLR).
Basis The proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons.
- 1. As demonstrated in the No Significant Hazards Consideration Determination, the proposed change does not involve a significant hazards consideration.
- 2. As demonstrated in the No Significant Hazards Consideration Determination, the proposed change does not result in a significant increase in the consequences of an accident previously evaluated and does not result in the possibility of a new or different kind of accident. The proposed change is related to accident analysis methodology and does not result in any changes to plant equipment or normal operation, and as a result, there is no impact on plant effluents during normal operation. Therefore, the proposed change does not result in a significant change in the types or significant increases in the amounts of any effluents that may be released offsite.
- 3. The proposed change does not modify the method of operation, maintenance, or surveillance of systems and components. Therefore the proposed change does not result in an increase in individual or cumulative occupational radiation exposures.
United States Nuclear Regulatory Commission Attachment III to Serial: RNP-RA/05-0006 2 pages including cover page H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE REGARDING REVISION TO CORE OPERATING LIMITS REPORT (COLR) REFERENCES MARKUP OF TECHNICAL SPECIFICATIONS PAGE
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 15. "Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 87 to Facility Operating License No. DPR-23, Carolina Power & Light Co.,
H. B. Robinson Steam Electric Plant, Unit No. 2, Docket No. 50-261," USNRC, Washington, DC 20555, 7 Nov. 84.
- 16. ANF-88-054(P), "PDC-3: Advanced Nuclear Fuels Corporation Power Distribution Control for Pressurized Water Reactors and Application of PDC-3 to H. B.
Robinson Unit 2," approved version as specified in the COLR.
- 17. ANF-88-133 (P)(A), "Qualification of Advanced Nuclear Fuels' PWR Design Methodology for Rod Burnups of 62 Gwd/MTU," approved version as specified in the COLR.
- 18. ANF-89-151(A), "ANF-RELAP Methodology for Pressurized Water Reactors: Analysis of Non-LOCA Chapter 15 Events," approved version as specified in the COLR.
- 19. EMF-92-081(A), "Statistical Setpoint/Transient Methodology for Westinghouse Type Reactors," approved version as specified in the COLR.
- 20. EMF-92-153(P)(A), "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel,"
approved version as specified in the COLR.
- 21. XN-NF-85-92(P)(A), "Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation Examination and Thermal Conductivity Results," approved version as specified in the COLR.
- 22. EMF-96-029(P)(A), "Reactor Analysis System for PWRs,"
approved version as specified in the COLR.
- 23. EMF-92-116, "Generic Mechanical Design Criteria for PWR Fuel Designs," approved version as specified in the COLR.
EMF-2103(P)(A), "Realistic Large Break LOCAversion Methodolo
- 24. for Pressurized Water Reactors," approved as specified in the COLR.
(continued)
HBRSEP Unit No. 2 5.0-30 Amendment No. 1476, 488
United States Nuclear Regulatory Commission Attachment IV to Serial: RNP-RA/05-0006 2 pages including cover page H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE REGARDING REVISION TO CORE OPERATING LIMITS REPORT (COLR) REFERENCES RETYPED TECHNICAL SPECIFICATIONS PAGE
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 15. "Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 87 to Facility Operating License No. DPR-23. Carolina Power & Light Co.,
H. B. Robinson Steam Electric Plant, Unit No. 2, Docket No. 50-261," USNRC, Washington, DC 20555, 7 Nov. 84.
- 16. ANF-88-054(P), "PDC-3: Advanced Nuclear Fuels Corporation Power Distribution Control for Pressurized Water Reactors and Application of PDC-3 to H. B.
Robinson Unit 2," approved version as specified in the COLR.
- 17. ANF-88-133 (P)CA), "Qualification of Advanced Nuclear Fuels' PWR Design Methodology for Rod Burnups of 62 Gwd/MTU," approved version as specified in the COLR.
- 18. ANF-89-151(A), "ANF-RELAP Methodology for Pressurized Water Reactors: Analysis of Non-LOCA Chapter 15 Events," approved version as specified in the COLR.
- 19. EMF-92-081(A), "Statistical Setpoint/Transient Methodology for Westinghouse Type Reactors," approved version as specified in the COLR.
- 20. EMF-92-153(P)(A), "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel,"
approved version as specified in the COLR.
- 21. XN-NF-85-92(P)(A), "Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation Examination and Thermal Conductivity Results," approved version as specified in the COLR.
- 22. EMF-96-029(P)(A), "Reactor Analysis System for PWRs,"
approved version as specified in the COLR.
- 23. EMF-92-116, "Generic Mechanical Design Criteria for PWR Fuel Designs," approved version as specified in the COLR.
- 24. EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," approved version as specified in the COLR.
(continued)
HBRSEP Unit No. 2 5,0-30 Amendment No. 476, 188
United States Nuclear Regulatory Commission Attachment V to Serial: RNP-RA/05-0006 48 pages including cover page H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE REGARDING REVISION TO CORE OPERATING LIMITS REPORT (COLR) REFERENCES EMF-3030(NIP)
Robinson Nuclear Plant Realistic Large Break LOCA Analysis February 2004 Non-Proprietary Version