RNP-RA/04-0020, January 2004 Monthly Operating Report for H.B. Robinson, Unit 2

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for H.B. Robinson, Unit 2
ML040370415
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/05/2004
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/04-0020
Download: ML040370415 (3)


Text

TS 5.6.4 TRM 6.2 q

bb ProgressEnergy Serial: RNP-RA/04-0020 FEB 0 5 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-231 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, Monthly Operating Reports, and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, Monthly Operating Report, Progress Energy Carolinas, Inc.,

submits the attached report of operating statistics and shutdown experience for the month of January 2004.

If you have any questions concerning this matter, please contact me.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTBljwv Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR

Attachment to Serial: RNP-RA/04-0020 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 2/4/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JANUARY 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.0 221301.99
4. HOURS GENERATOR ON LINE 744.00 744.0 217982.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 558604.00 558604.00 142935962.00

Attachment to Serial: RNP-RA/04-0020 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 2/4/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JANUARY 2004 UNIT SHUTDOWNS No. Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor 2 S: Scheduled 1 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer safety valves.