RNP-RA/04-0140, October 2004 Monthly Operating Report for H B Robinson Unit 2

From kanterella
Jump to navigation Jump to search
October 2004 Monthly Operating Report for H B Robinson Unit 2
ML043210489
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/09/2004
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/04-0140, TRM 6.2, TS 5.6.4
Download: ML043210489 (3)


Text

TS 5.6.4 TRM 6.2 a Progress Energy Serial: RNP-RA/04-0140 NOV 0 9 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of October 2004.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP Dr. W. D. Travers, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas. Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville. SC 29550

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0140 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP). UNIT NO. 2 DATE 11/312004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: OCTOBER 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765

-2.--7 -MAX DEPENDABLE CAPACITY (NET MWE): 710 -

THIS YR TO MONTH DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR CRITICAL 716.4 6384.4 226942.4
4. HOURS GENERATOR ON LINE 697.7 6348.1 223586.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 510844.0 4641926.0 147019284.0

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0140 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP. UNIT NO. 2 DATE 11/3/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: OCTOBER 2004 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Comments F: rced (Hours) j the Reactor S: SdiVukd . I_

04.002 041013 F 47.3 A I The unit was shutdown to repair a valve packing leak on the pressurizer spray bypass line.

t 2 Reason: Method:

A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit was shutdown for approximately 47.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to repair a reactor coolant system leak on the pressurizer spray bypass line. The leak remained below Technical Specifications limits at all times. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month. I II i