Category:Letter type:CP
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:CP"
The following 200 pages are in this category, out of 706 total.
(previous page) (next page)C
- CP-200130010, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach
- CP-200700016, Supplemental Information to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage
- CP-200700022, License Amendment Request (LAR) 2007-008 to Technical Specification 3.6.7, Spray Additive System
- CP-200700024, Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses
- CP-200700046, Submittal of Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments
- CP-200700075, Clarification of Proprietary Nature of Information Regarding Gothic Code Input Data
- CP-200700085, Supporting Information Regarding the Proprietary Nature of Gothic Code Input Data
- CP-200700090, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- CP-200700132, Supplement to License Amendment Request (LAR) 07-003 - Response to Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses
- CP-200700169, Supplement to License Amendment Request (LAR) 06-012, Response to Request for Additional Information Related to Administrative Controls
- CP-200800053, Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 2
- CP-200800057, Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800123, Comanche Peak - Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to LAR Associated with Methodology Used to Establish Core Operating Limits and LAR 07-004 Revision to Operating
- CP-200800123, Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to LAR Associated with Methodology Used to Establish Core Operating Limits and LAR 07-004 Revision to Operating License
- CP-200800124, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800125, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800183, Withdrawal of License Amendment Request (LAR) 06-009, Revision to Technical Specification 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators
- CP-200800212, Comanche Peak - Response to Request for Additional Information Related to License Amendment Request 07-003 Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentations, and
- CP-200800212, Response to Request for Additional Information Related to License Amendment Request 07-003 Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentations, and 5.6.5b
- CP-200800213, Response to Request for Additional Information
- CP-200800214, Guarantees of Payment of Deferred Premiums
- CP-200800244, Transmittal of Annual Operating Report for 2007
- CP-200800263, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800264, Supplement to License Amendment Request (LAR) 07-003: Response to Request for Additional Information Related to License Amendment Request Associated with Methodology Used to Establish Core Operating Limits
- CP-200800265, Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- CP-200800276, Commanche Peak, Transmittal of Second-Half 2007 Fitness-for-Duty Program Performance Data
- CP-200800348, Transmittal of Inservice Inspection Program Plan, Revision 3, (ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date August 3, 2004, Second Interval)
- CP-200800357, Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800403, Property Damage Insurance as of April 1, 2008
- CP-200800410, Reply to a Notice of Violation; EA-08-028
- CP-200800411, Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses
- CP-200800455, Supplement to License Amendment Request (LAR) 07-003, Additional Information Related to License Amendment Request Associated with Methodology Used to Establish Core Operating Limits
- CP-200800514, Cycle 11, Core Operating Limits Reports
- CP-200800540, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
- CP-200800560, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800609, Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays
- CP-200800612, Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits Report
- CP-200800613, Transmittal of Year 2007 Annual Radiological Environmental Operating Report
- CP-200800614, Transmittal of 2007 Radioactive Effluent Release Report & Revision to the Offsite Dose Calculation Manual
- CP-200800645, Supplement to License Amendment Request Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt
- CP-200800646, Transmittal of Endorsements to Nuclear Energy Liability Insurance Policy
- CP-200800655, Submittal of the Annual Non-Radiological Environmental Operating Report for 2007
- CP-200800762, Submittal of Notice of Change in Trustee for Nuclear Decommissioning Trusts
- CP-200800769, Response to Request for Additional Information, Relief Request No. B-2 for the Unit 2 Second 10 Year ISI Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences
- CP-200800805, Report of Unusual or Important Environmental Event, Operating License, Appendix B, Environmental Protection Plan (Non Radiological) - Mortality of Avian Species
- CP-200800809, Submittal of Core Operating Limits Reports
- CP-200800810, Transmittal of Comanche Peak, Units 1 and 2, Supplement to License Amendment Request (LAR) 07-004 Revision to the Technical Specifications for Spent Fuel Pool Criticality
- CP-200800834, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors
- CP-200800901, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- CP-200800927, (Cpnpp), Relief Request B-8 for Unit 1 Second 10 Year ISI Interval & B-6 for Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Requirements for Reactor Vessel Hot & Cold Leg Nozzle Weld Examinations (Unit 1 Second Interval Start
- CP-200800928, Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)
- CP-200800962, Licensing Basis on Use of Manual Actions for Fire Protection
- CP-200800990, 10CFR50.59 Evaluation Summary Report 0014 (for 08/02/2006 Through 02/01/2008) and Commitment Material Change Evaluation Report 0008
- CP-200801132, Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)
- CP-200801166, Transmittal of First-Half 2008 Fitness-for-Duty Program Performance Data
- CP-200801342, Submittal of Tenth Refueling Outage (2RF10) Steam Generator Inspection 180 Day Report
- CP-200801523, Core Operating Limits Report
- CP-200801604, Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
- CP-200801606, Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter
- CP-200801644, Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004)
- CP-200801686, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request
- CP-200900006, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request
- CP-200900007, Submittal of Annual Report of Changes in Peak Cladding Temperature
- CP-200900009, Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and Analyses
- CP-200900010, Core Flux Maps Data, Cycle 11
- CP-200900069, Thirteenth Refueling Outage (1RF13) Steam Generator 180 Day Report
- CP-200900074, Renewal of Quality Assurance Program Approval for Radioactive Material Packages No. 0504
- CP-200900126, Cycle 14 Startup Report
- CP-200900127, Guarantees of Payment of Deferred Premiums
- CP-200900253, Transmittal of the CPNPP Second-Half 2008 Fitness-For-Duty Program Performance Data
- CP-200900262, License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications
- CP-200900268, Notification of Management Changes
- CP-200900283, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request
- CP-200900345, Annual Operating Report for 2008
- CP-200900383, License Amendment Request (LAR) 09-006, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26
- CP-200900472, Submittal of Annual Report of Changes in Peak Cladding Temperature
- CP-200900473, Decommissioning Report
- CP-200900474, Property Damage Insurance, Summary Report
- CP-200900475, Liability Insurance
- CP-200900492, License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation
- CP-200900520, License Amendment Request (LAR 09-003), Revision to Technical Specification 3.8.1, AC Sources - Operating, for One-Time, 14-Day Completion Time for Offsite Circuits
- CP-200900521, Eclectic Station, Unit 2 - Response to Request for Additional Information, 2RF10 Steam Generator Tube Inservice Inspection Report
- CP-200900523, CP-2009-03 - Post Exam Submittal Letter
- CP-200900530, (CPSES) - Submittal of the Annual Non-Radiological Environmental Operating Report for 2008
- CP-200900568, Comanche Park Steam Electric Station - Transmittal of Year 2008 Radiological Environmental Operating Report
- CP-200900593, Response to Request for Additional Information, 1RF13 Steam Generator Tube Inservice Inspection Report
- CP-200900615, Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report
- CP-200900615, Transmittal of Year 2008 Radioactive Effluent Release Report
- CP-200900654, Denial of Finding in NRC Integrated Inspection Report 05000445/446 2009002
- CP-200900707, Revision to Relief Request No. P-2 for the Units 1 & 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)
- CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200900751, Supplement to the Proposed Emergency Plan Change to Implement NEI 99-01, Revision 5, Emergency Action Levels (Eals)
- CP-200900846, (Cpes) - Request to Delay the Code of Record for the Unit 1 Inservice Inspection (ISI) Program
- CP-200900848, Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11
- CP-200900980, (CPSES) - Supplement to License Amendment Request (LAR) 09-006 to Provide Updated Information
- CP-200901038, Response to NRC Staff Evaluation and Basis for Denial of License Amendment Request Revision to the Technical Specification 3.7.17, Spent Fuel Assembly Storage
- CP-200901042, Response to Request for Additional Information Regarding License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200901204, Request for Withdrawal of License Amendment Request Revision to the Technical Specification 3.7.17, Spent Fuel Assembly Storage
- CP-200901226, Response to Request for Additional Information Regarding License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200901227, Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Informatio
- CP-200901276, Response to Request for Additional Information Regarding License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200901307, Revision to License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200901308, Revision to License Amendment Request 09-007 Model D5 Steam Generator Alternate Repair Criteria
- CP-200901341, Revision to License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria
- CP-200901349, Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spay Systems
- CP-200901396, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors
- CP-200901403, Comanche Peak - Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- CP-200901404, Core Operating Limits
- CP-200901406, Update of Commitment Regarding Equipment Qualification Bounding Post LOCA Profiles
- CP-200901569, License Amendment Request (LAR) 09-010, for Approval of the Cyber Security Plan
- CP-200901579, Denial of Noncited Violation in NRC Integrated Inspection Reports 05000445-09-004, 05000446-09-004
- CP-200901608, Response to Request for Additional Information Related to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems
- CP-200901720, Supplement to License Amendment Request (LAR) 09-010, for Approval of the Cyber Security Plan
- CP-200901726, Independent Spent Fuel Storage Installation (ISFSI) - Notification of Intent to Apply Previously Approved 10CFR50, Appendix B, Quality Assurance Program
- CP-200980127, Response to Request for Withholding Information from Public Disclosure
- CP-201000061, Submittal of Unit 2 Eleventh Refueling Outage (2RF11) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date-August 3, 2004
- CP-201000127, Certified Copies of Nuclear Liability Insurance
- CP-201000128, Guarantees of Payment of Deferred Premiums
- CP-201000144, Revision to License Amendment Request 09-001, Administrative Revision to Operating Licenses and Technical Specifications
- CP-201000157, Response to Request for Additional Information Regarding Request for Delaying the Code of Record Inservice Inspection Program
- CP-201000426, Property Damage Insurance
- CP-201000427, Annual Report of Changes in Peak Cladding Temperature
- CP-201000570, Supplement to the Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 103
- CP-201000588, Response to Request for Additional Information Related to License Amendment Request 09-003, Revision to Technical Specification 3.8.1, AC Sources - Operating, for One-Time, 14-Day Completion Time for Offsite Circuits
- CP-201000611, Submittal of Core Operating Limits Reports
- CP-201000645, Submittal of the Annual Non-Radiological Environmental Operating Report for 2009
- CP-201000646, Transmittal of Year 2009 Radiological Environmental Operating Report
- CP-201000647, Transmittal of Year 2009 Radioactive Effluent Release Report
- CP-201000733, Report of Changes to the Physical Security Plan (Revision 5)
- CP-201000740, Core Operating Limits Report for Unit 1, Cycle 15, Revision 1 and Unit 2, Cycle 12, Revision 1
- CP-201000888, Submittal of Unit 1 Fourteenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2000, Second Interval)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201000904, License Amendment Request (LAR) 10-002, for Approval of Cyber Security Plan
- CP-201000982, Submittal of Revision 5 of Physical Security Plan
- CP-201001151, Response to Request for Additional Information Related to License Amendment Request (LAR) 10-001, for Adoption of TSTF Traveler 501, Rev. 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
- CP-201001353, (CPNPP) Unit 2, Transmittal of Unit 2 Reactor Vessel Surveillance Capsule W Analysis Report
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000)
- CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201100170, Comanche Peak - Guarantees of Payment of Deferred Premiums
- CP-201100171, Request for a Change to the Quality Assurance Plan Involving a Reduction in Commitment
- CP-201100294, Property Damage Insurance
- CP-201100295, Decommissioning Report
- CP-201100296, Nuclear Liability Insurance
- CP-201100297, Annual Report of Changes in Peak Cladding Temperature
- CP-201100356, Relief Request A-1 for Unit 1 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (Third Interval....)
- CP-201100528, Cycle 13 Core Operating Limits Report, March 2011
- CP-201100563, Transmittal of Year 2010 Radioactive Effluent Release Report
- CP-201100564, Transmittal of Year 2010 Radiological Environmental Operating Report
- CP-201100565, Submittal of Annual Non-Radiological Environmental Operating Report for 2010
- CP-201100609, Response to Request for Additional Information, Relief Request No. C-6 and C-7
- CP-201100674, Emergency Response Data System Changes
- CP-201100675, ISFSI, Update of the CPNPP Ispsi Construction Status
- CP-201100747, (CPNPP) Units 1 and 2, Report of Changes to the Physical Security Plan (Revision 6)
- CP-201100770, Letter to NRC Luminant Generation Company LLC Request for Approval of Secure Voice Communication
- CP-201100772, Response to Request for Additional Information, Relief Requests Nos. B-10 and B-11
- CP-201100828, 30-Day Response to NRC Bulletin 2011-01, Mitigation Strategies
- CP-201100839, Notification of Full Compliance with NRC Order EA-2010-051 for Implementation of Additional Security Measures at the CPNPP Independent Spent Fuel Storage Installation
- CP-201100851, Response to Noncited Violation in NRC Triennial Fire Protection Inspection Report 05000445/446 2011007
- CP-201100852, Submittal of 12th Refueling Outage (2RF12) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 4,2004, Second Interval)
- CP-201100899, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
- CP-201101030, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval)
- CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)
- CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled
- CP-201101065, Comanche Peak Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 104
- CP-201101107, Response to Request for Additional Information Related to Request for a Change to the Quality Assurance Plan Involving a Reduction in Commitment
- CP-201101108, Supplement to License Amendment Request 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a License..
- CP-201101169, CFR50.59 Evaluation Summary Report 016, 10CFR72.48 Evaluation Summary Report 001, and Commitment Material Change Evaluation Report 010
- CP-201101257, Submittal of Operator Licensing Examination Data
- CP-201101429, Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report
- CP-201101442, Supplement to Relief Request C-9 for Alternative Pressure Testing Requirements for Reactor Vessel Flange Leak-Off Piping
- CP-201101450, Core Operating Limits Report
- CP-201101565, Response to Request for Additional Information, Risk Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program - Tacs ME6789 and ME6790
- CP-201101663, License Amendment Request (LAR)11-003 for Adopting of TSTF-491, Rev. 2, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Tech Specs Using Consolidated Line Item Improvement Process
- CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ..
- CP-201200013, Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)
- CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011
- CP-201200034, Transmittal of 2011 Radiological Environmental Operating Report
- CP-201200045, Submittal of Unit 1 Fifteenth Refueling Outage (1RF15) Inservice Inspection (ISI) Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2010, Third Interval)
- CP-201200097, Response to Request for Additional Information for Relief Request No. A-1
- CP-201200106, Submittal of Guarantees of Payment of Deferred Premiums
- CP-201200157, Response to Request for Additional Information for Relief Request No. A-1
- CP-201200221, Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister
- CP-201200291, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister
- CP-201200309, Answer to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049)
- CP-201200310, Answer to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
- CP-201200314, Property Damage Insurance
- CP-201200315, Annual Report of Changes in Peak Cladding Temperature
- CP-201200331, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)
- CP-201200334, Day Response to U.S. Nuclear Regulatory Commissions (NRC) Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54 (F) Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force
- CP-201200347, Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report
- CP-201200347, Transmittal of Year 2011 Radioactive Effluent Release Report
- CP-201200350, And Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister
- CP-201200351, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister
- CP-201200354, Response to Request for Additional Information, 2RF12 Steam Generator Tube Inservice Inspection Report - TAC No. ME7345
- CP-201200386, Nuclear Liability Insurance
- CP-201200440, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Canister
- CP-201200476, Comanche Peak, Units 1 and 2, 60-Day Response to NRC Letter, Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident,
- CP-201200476, Day Response to NRC Letter, Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident, Dated 03/12/2012