RNP-RA/02-0151, Withdrawal of Relief Request Number RR-06 for the Fourth Ten-Year Interval Inservice Inspection Program

From kanterella
Jump to navigation Jump to search
Withdrawal of Relief Request Number RR-06 for the Fourth Ten-Year Interval Inservice Inspection Program
ML022670137
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/20/2002
From: Fletcher B
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/02-0151
Download: ML022670137 (1)


Text

C S 6 PgsEr CP&L A Progress Energy Compan~y 10 CFR 50.55a Serial: RNP-RA/02-0151 SEP 2 0 200Z United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 WITHDRAWAL OF RELIEF REQUEST NUMBER RR-06 FOR THE FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM Ladies and Gentlemen:

The Fourth Ten-Year Interval Inservice Inspection (ISI) program and associated plan for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, was submitted to the NRC by letter dated August 17, 2001. That submittal included relief request number RR-06, which requests relief from the ASME Boiler and Pressure Vessel Code,Section XI, 1995 Edition with 1996 Addenda, Examination Category B-D, Item No. B3.140, requirement for examination of the primary side steam generator inside radius sections. Relief request number RR-06 is hereby withdrawn from the proposed relief requests for the Fourth Ten Year ISI interval for HBRSEP, Unit No. 2.

If you have any questions regarding this matter, please contact Mr. C. T. Baucom.

Sincerely, B. L. Fletcher mI Manager - Regulatory Affairs CAC/cac c: Mr. L. A. Reyes, NRC, Region 11 Mr. R. Subbaratnam, NRC, NRR NRC Resident Inspector, HBRSEP Robinson Nuclear Plant 3581 West Entrance Road Ao T1 Hartsville SC 29550