Category:Letter type:TSTF
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:TSTF"
The following 200 pages are in this category, out of 259 total.
(previous page) (next page)T
- TSTF-03-02, Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A.
- TSTF-03-06, Transmittal Letter - Withdrawal of Travelers from NRC Review
- TSTF-03-07, Traveler - September 17, 2003, Transmitts TSTF-459, Eliminate RHR Shutdown Cooling System TSTF-460, Control Rod Scram Time Testing; TSTF-465, Addition of Time Performance Surveillance Requirement Note to Source Range Monitor (Srm).
- TSTF-03-09, Traveler - November 10, 2003 - Transmits TSTF-430, R.1, AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1)
- TSTF-03-10, Traveler - November 10, 2003, Transmits Response to June 23, 2003 Request for Additional Information on TSTF-422, R.1, Change in Technical Specifications End States (CE NPSD-1186).
- TSTF-03-11, Traveler - November 17, 2003, Transmits TSTF-372, R.3 Addition of LCO 3.0.8, Inoperability of Snubbers
- TSTF-03-12, Traveler - November 10, 2003, Transmits TSTF-429, R.3 Ice Mass Determination Surveillance Requirements.
- TSTF-04-03, TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers.
- TSTF-04-04, TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing.
- TSTF-04-05, TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9.
- TSTF-04-07, TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action.
- TSTF-04-08, TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control.
- TSTF-04-09, TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c
- TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091)
- TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems
- TSTF-04-12, Submittal and Request for Fee Waiver for Review of TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.
- TSTF-04-13, TSTF-449, Revision 2, Steam Generator Tube Integrity.
- TSTF-04-15, TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a.
- TSTF-04-16, TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).
- TSTF-05-03, Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration
- TSTF-05-05, Letter Transmitting TSTF-449, Revision 4, Steam Generator Tube Integrity.
- TSTF-05-06, TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities.
- TSTF-05-07, Submittal and Request for Fee Waiver for Review of TSTF-343, Revision 1, Containment Structural Integrity.
- TSTF-05-08, Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1.
- TSTF-05-10, TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.
- TSTF-05-12, TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability.
- TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I
- TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01
- TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046)
- TSTF-05-16, TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.
- TSTF-05-17, TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A.
- TSTF-05-18, Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications.
- TSTF-05-19, TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.
- TSTF-05-20, TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0
- TSTF-05-21, TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications.
- TSTF-05-22, Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews
- TSTF-06-01, TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.
- TSTF-06-02, TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation
- TSTF-06-03, TSTF-493, Revision 0, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-06-04, Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolid
- TSTF-06-05, TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
- TSTF-06-06, TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems.
- TSTF-06-07, TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability.
- TSTF-06-08, Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements
- TSTF-06-11, Response to NRC Request for Additional Information Regarding TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Dated April 7, 2006
- TSTF-06-12, Response to NRC Letter Regarding TSTF-465, Revision 0, Addition of Time Performance Surveillance Requirement (SR) Note to Source Range Monitor (SRM) Srs, Dated April 14, 2006
- TSTF-06-14, TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less.
- TSTF-06-15, Response to NRC Request for Review of Draft Safety Evaluation and Request for Additional Information Regarding TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Dated 04/14/2006
- TSTF-06-19, TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC Subsystems
- TSTF-06-20, TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03.
- TSTF-06-22, TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems.
- TSTF-06-25, Response to NRC Request for Additional Information Regarding TSTF-487, Revision 0, Relocate DNB Parameters to the COLR, Dated September 5, 2006
- TSTF-06-26, Submittal of TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).
- TSTF-06-28, TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).
- TSTF-06-32, Request for Pre-Submittal Meeting on TSTF Traveler to Address Main Steam Isolation Valve Operability
- TSTF-06-33, Withdrawal of TSTF-492, Revision 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.
- TSTF-06-34, Request to Extend Acceptance Review Schedule for TSTF-493, Revision 1, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-06-36, Request to Revise Response Schedule for TSTF-476
- TSTF-06-37, Corrected Pages for TSTF-448, Revision 3, Control Room Habitability.
- TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)
- TSTF-07-04, TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).
- TSTF-07-05, TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.
- TSTF-07-06, Response to NRC Request for Additional Information Regarding TSTF-486, Revision 0, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011), Dated November 20, 2006 and Submittal of Revision 1
- TSTF-07-07, Response to NRC Request for Additional Information Regarding TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Dated November 9, 2006
- TSTF-07-08, Schedule for Submittal TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-07-09, TSTF-478, Revision 1, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.
- TSTF-07-10, Changes to Technical Specifications Task Force Membership and Distribution List
- TSTF-07-11, Revision to Implementation Guidance for TSTF-423, Technical Specifications End States, NEDC-32988-A.
- TSTF-07-12, Submittal of TSTF-425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5.
- TSTF-07-13, Response to NRC Request for Additional Information (RAI) Regarding TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03', Dated January 11, 2007
- TSTF-07-14, TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-07-15, TSTF-IG-07-01, Implementation Guidance TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).
- TSTF-07-17, TSTF-487, Revision 1, Relocate DNB Parameters to the Colr.
- TSTF-07-18, TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011).
- TSTF-07-19, Response to NRC Request for Additional Information (RAI) Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated February 28, 2007
- TSTF-07-20, Request to Restart Review of TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).
- TSTF-07-21, Response to NRC Request for Additional Information Regarding TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441), Dated May 3, 2007
- TSTF-07-22, TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.
- TSTF-07-23, TSTF-501, Revision 0, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.
- TSTF-07-24, TSTF-431, Revision 2, Change in Technical Specifications End States (BAW-2441).
- TSTF-07-26, TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.
- TSTF-07-27, Response to NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007
- TSTF-07-29, TSTF-07-29 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007
- TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007
- TSTF-07-32, NRC Review Fee Billing for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.
- TSTF-07-33, Errata Pages for TSTF-498, Rev 1, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).
- TSTF-07-35, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Dated July 25, 2007
- TSTF-08-01, Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-08-02, Response to NRC December 13, 2007 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Store Fuel Oil and Lube Oil Volume Values to Licensee Control.
- TSTF-08-03, March 6, 2008, Letter to Nrc/Cfo, from Technical Specifications Task Force, NRC Review Fee Billing for TSTF-501, Revision 0, Relocation Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.
- TSTF-08-04, TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).
- TSTF-08-05, TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.
- TSTF-08-07, Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.
- TSTF-08-08, TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.
- TSTF-08-09, TSTF-509, Revision 0, Reformat the Conditions, Required Actions, and Surveillance for 3.2.4, Qpt.
- TSTF-08-10, Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization
- TSTF-08-12, Submittal of Technical Specification Branch Positions Inconsistent with the Improved Standard Technical Specifications
- TSTF-08-13, TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c
- TSTF-08-14, Response to Request for Additional Information on TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.
- TSTF-08-16, Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.
- TSTF-08-17, Request for Fee Exemption for TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.
- TSTF-08-18, Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met.
- TSTF-08-19, Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360.
- TSTF-08-20, Withdrawal of TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.
- TSTF-08-21, Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation.
- TSTF-09-01, Transmittal of TSTF-515, Revision 0, Revise Post-Accident Monitoring Instrumentation Based on Reg. Guide 1.97, Rev. 4 and NEDO-33349.
- TSTF-09-02, Transmittal of TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
- TSTF-09-03, Transmittal of TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation and TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation
- TSTF-09-04, Technical Specifications Task Force (TSTF) - Changes to the TSTF Membership and Updated Distribution List
- TSTF-09-05, Request for Fee Exemption for TSTF-513, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation & TSTF-514, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
- TSTF-09-06, Notification of Industry Guidance Regarding Commitment in TSTF-372-A, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers.
- TSTF-09-07, Industry Plan to Resolve TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions
- TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.
- TSTF-09-09, Letter from Technical Specifications Task Force to J. E. Dyer, CFO, Dated March 26, 2009, Request for Fee Exemption for TSTF-510 Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.
- TSTF-09-10, Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5
- TSTF-09-11, Withdrawal of TSTF-509, Revision 0, Reformat the Conditions, Required Actions, and Surveillance for 3.2.4, Qpt.
- TSTF-09-13, Response to April 17, 2009 Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.
- TSTF-09-14, Response to May 6, 2009 Request for Additional Information Regarding TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.
- TSTF-09-15, Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance
- TSTF-09-16, Technical Specifications Task Force - Withdrawal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization
- TSTF-09-18, Response to June 11, 2009 Request for Additional Information Regarding TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
- TSTF-09-20, Transmittal of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360
- TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434
- TSTF-09-25, Transmittal of Revised Risk-Informed End State Travelers: TSTF-422, TSTF-423, TSTF-431, and TSTF-432
- TSTF-09-28, Technical Specifications Task Force (Tstf), Updated TSTF Membership and Distribution
- TSTF-10-01, Technical Specifications Task Force (TSTF) Position Regarding Required Action Completion
- TSTF-10-02, Transmittal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2
- TSTF-10-04, Transmittal of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month.
- TSTF-10-05, Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation
- TSTF-10-07, Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-10-08, Response to Request for Additional Information and Revision to TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection
- TSTF-10-09, Withdrawal of TSTF-517, Rev. 0, Allowance for Non-TS Cooling/Ventilation Systems Degradation on Support System Operability.
- TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A)
- TSTF-10-13, Change in Fee Exemption for TSTF-513 & TSTF-514
- TSTF-10-14, Submittal of TSTF-513, Revision 3 and TSTF-514, Revision 2
- TSTF-10-17, Response to NRC Comments and Submittal of Revision 2 of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection
- TSTF-10-18, Response to NRC Request for Additional Information on TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation
- TSTF-10-19, Technical Specification Task Force - Request for NRC Information to Support Plant-Specific Adoption of Option B of TSTF-493, Revision 4, Clarify Application of Setpoint Methodology for LSSS Functions.
- TSTF-10-20, Response to NRC Request for Additional Information Regarding TSTF-432, Revision 0, Change in Technical Specifications End States (WCAP-16294).
- TSTF-10-21, Invitation to Participate in Industry Workshop on TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions
- TSTF-10-24, Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
- TSTF-11-01, Updated TSTF Membership and Distribution
- TSTF-11-02, Correction to TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection
- TSTF-11-04, Withdrawal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operational Tests in Specifications 3.3.1 and 3.3.2
- TSTF-11-05, Withdrawal of TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.
- TSTF-11-06, Withdrawal of TSTF-515, Revision 0, Revise Post-Accident Monitoring Instrumentation Based on Reg. Guide 1.97, Rev. 4 and NEDO-33349
- TSTF-11-09, Request to Revise Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety.
- TSTF-11-12, Transmittal of TSTF-530, Revision 0, Clarify SR 3.0.3 to Be Consistent with Generic Letter 87-09
- TSTF-11-13, Transmittal of TSTF-534, Revision 0, Clarify Application of Pressure Boundary Leakage Definition.
- TSTF-11-14, Transmittal of TSTF-533-T, Revision 0, Remove COLR and PTLR Revision and Date Relocation Provisions Added by TSTF-363, -408, and -419.
- TSTF-11-15, Transmittal of TSTF-529, Revision 0, Clarify Use and Application Rules
- TSTF-11-16, Proposed Revision to the Notice of Availability for TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
- TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.
- TSTF-11-18, Withdrawal of TSTF-490, Revision 1, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.
- TSTF-11-19, Proposed Model Application for TSTF-432, Revision 1, Change in Technical Specifications End States (WCAP-16294).
- TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046).
- TSTF-12-02, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
- TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373
- TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications.
- TSTF-12-06, Transmittal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c.
- TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
- TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation
- TSTF-12-09, Correction to TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.
- TSTF-12-11, Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6)
- TSTF-12-13, Response to NRC Request to Revise TSTF Traveler Model Applications
- TSTF-12-14, Response to NRC Request for Supplemental Information and Withdrawal Regarding TSTF-534, Revision 0, Clarify Application of Pressure Boundary Leakage Definition.
- TSTF-12-15, Response to NRC Request for Additional Information Regarding TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation.
- TSTF-12-16, Updated TSTF Membership and Distribution
- TSTF-13-01, Response to NRC Request for Additional Information Regarding TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
- TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation.
- TSTF-13-03, Transmittal of TSTF-529, Revision 1, Clarify Use and Application Rules
- TSTF-13-05, Transmittal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs
- TSTF-13-06, Updated TSTF Membership and Distribution
- TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal.
- TSTF-13-10, Technical Specifications Task Force - Request for Fee Exemption for TSTF-545, TS Inservice Testing (IST) Program Removal
- TSTF-13-11, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation Corrected Pages
- TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed
- TSTF-13-13, Withdrawal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs.
- TSTF-13-15, Transmittal of TSTF-542, Revision 0, Reactor Pressure Vessel Walter Inventory Control
- TSTF-13-16, Request for Fee Exemption for TSTF-542, Reactor Pressure Vessel Water Inventory Control.
- TSTF-14-01, Withdrawal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c.
- TSTF-14-02, Transmittal of TSTF-529, Revision 2, Clarify Use and Application Rules.
- TSTF-14-03, Response to NRC Request for Additional Information Regarding TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373
- TSTF-14-04, Request to Begin Review Prior to NRC Decision on Fee Waiver for TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control.
- TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal.
- TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements
- TSTF-14-07, Updated TSTF Membership and Distribution
- TSTF-14-10, BWR Owners Group and PWR Owners Group - Revision of References to Regulatory Guide 1.182 in Approved Travelers
- TSTF-14-15, Withdrawal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6)
- TSTF-14-17, Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 3
- TSTF-14-18, Transmittal of TSTF-551, Revision 0, Address Transient Secondary Containment Conditions
- TSTF-15-01, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control, and Submittal of TSTF-542, Revision 1
- TSTF-15-03, Response to NRC Comments Regarding TSTF-545, Revision 1, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing and Submittal of TSTF-545, Revision 2
- TSTF-15-04, Technical Specification Task Force Informs NRC of Changes to the TSTF Membership and Provides an Updated Distribution List
- TSTF-15-05, Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2.
- TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.
- TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements.
- TSTF-15-08, Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules.
- TSTF-15-09, Technical Specifications Task Force - Transmits TSTF-553, Revision 0, Add Action for Two Inoperable (Control Room Emergency Air Temperature Control System) Creatcs Trains
- TSTF-15-11, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3