Proposed Additional Condition for the Amendment Request to Increase Authorized Reactor Power Level
ML022910018
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/15/2002
From: Fletcher B
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/02-0163, TAC MB5106
Download: ML022910018 (4)


Text

10 CFR 50.90 W CP&L C' AProgress Energy Company Serial: RNP-RA/02-0163 OCT 1 5 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PROPOSED ADDITIONAL CONDITION FOR THE AMENDMENT REQUEST TO INCREASE AUTHORIZED REACTOR POWER LEVEL (TAC NO. MB5106)

Ladies and Gentlemen:

By letter dated May 16, 2002, Carolina Power and Light (CP&L) Company submitted a request for an amendment to the Technical Specifications (TS) to increase the authorized reactor power level for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. A supplement to this license amendment request was submitted by letter dated August 12, 2002. In that supplement, it was stated that an evaluation had been completed that determined the current analysis of record for the listed radiological accidents supports operation at the uprated power level for approximately 95% of Cycle 22 (approximately 504 effective full power days [EFPD]).

This letter provides a proposed amendment to the Operating License that will identify the EFPD limitation as a license condition for HBRSEP, Unit No. 2. This restriction is being adopted in lieu of completion of another proposed license amendment pertaining to the full implementation of an alternative radiological source term (AST). The proposed license condition can be discontinued when the full AST license amendment is completed.

Attachment I provides an Affirmation as required by 10 CFR 50.30(b). Attachment II provides 4the proposed license condition associated with this license amendment request.

In accordance with 10 CFR 50.91(b), CP&L is providing the State of South Carolina with a copy of this letter.

The additional information provided by this letter does not affect the basis or justification for the proposed TS change, including the evaluation of No Significant Hazards Consideration provided within the August 12, 2002, submittal.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville SC 29550

United States Nuclear Regulatory Commission Serial: RNP-RAI02-0163 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. C. T. Baucom.

Sincerely, B. L. Fletcher III Manager - Site Support Services CAC/cac Attachments:

I. Affirmation II. Proposed Additional Condition for the Amendment Request to Increase Authorized Reactor Power Level c: Mr. L. A. Reyes, NRC, Region II Mr. H. J. Porter, Director, Division of Radioactive Waste Management (SC)

Mr. R. M. Gandy, Division of Radioactive Waste Management (SC)

Mr. R. Subbaratnam, NRC, NRR NRC Resident Inspector, HBRSEP Attorney General (SC)

United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/02-0163 Page 1 of 1 AFFIRMATION The information contained in letter RNP-RA/02-0163 is true and correct to the best of my information, knowledge and belief; and the sources of my information are officers, employees, contractors, and agents of Carolina Power and Light Company. I declare under penalty of perjury that the foregoing is true and correct.

SOCT 1 5 20OZ C Executed on:

C. L. Burton Director - Site Operations

United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/02-0163 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PROPOSED ADDITIONAL CONDITION FOR THE AMENDMENT REOUEST TO INCREASE AUTHORIZED REACTOR POWER LEVEL The following additional condition is proposed for inclusion in Appendix B to the H. B.

Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Facility Operating License No. DPR-23:

Additional Condition Implementation Date Operation of HBRSEP, Unit No. 2, is limited to The amendment is effective 504 effective full power days during operating immediately and shall be cycle number 22. This additional condition shall implemented within 30 days of remain in effect until approval of a license the date of this amendment.

amendment that removes this limitation.