RNP-RA/04-0103, July 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 2

From kanterella
Jump to navigation Jump to search
July 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 2
ML042260432
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/04/2004
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/04-0103
Download: ML042260432 (3)


Text

TS 5.6.4 TRM 6.2 a Progress Energy Serial: RNP-RA/04-0103 AUG 0 4 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of July 2004.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP W. D. Travers, NRC, Region II C. P. Patel, NRC, NRR I -

2 . i .

Progress Energy Carolinas. Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550

Attachment to Serial: RNP-RA/04-0103 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP). UNIT NO. 2 DATE 8f2/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JULY 2004

1. DESIGN ELE CTRICAL RATJNG(NETMWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 744.0 4204.0 224762.0
4. HOURS GENERATOR ON LINE 744.0 4186.4 221424.7
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 535932.0 3063862.0 145441220.0

Attachment to Serial: RNP-RA/O4-O10O Page 2 of 2 DOCKET NO. 050-0261 . , .

UNIT NAME HBRSEP. UNIT NO. 2 DATE 812/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JULY 2004 UNIT SHUTDOWNS No. Date Type Duration Reaon' Method ofShutting Down Cause/ Corrective Actions / Commnents F:Foe (Hours) the Reactor 1l I,,

Reason:  ! Method:

A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-her (Explain)

F-Administrative l G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximatelylfull power for the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves. $