RNP-RA/04-0052, April 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2
ML041320400
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/11/2004
From: Baucom C
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/04-0052
Download: ML041320400 (3)


Text

TS 5.6.4 TRM 6.2 Serial: RNP-RA/04-0052 MAY 11, 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, Monthly Operating Reports, and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, Monthly Operating Report, Progress Energy Carolinas, Inc.,

also known as Carolina Power and Light Company, submits the attached report of operating statistics and shutdown experience for the month of April 2004.

If you have any questions concerning this matter, please contact me.

Sincerely, Original signed by C. T. Baucom C. T. Baucom Supervisor - Licensing/Regulatory Programs JMG/jmg Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR

Attachment to Serial: RNP-RA/04-0052 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 5/4/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: APRIL 2004

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 456.0 2640.0 223198.0
4. HOURS GENERATOR ON LINE 455.0 2639.0 219877.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 23.2
6. NET ELEC. ENERGY GENERATED (MWH) 335268.0 1973735.0 144351093.0

Attachment to Serial: RNP-RA/04-0052 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 5/4/2004 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: APRIL 2004 UNIT SHUTDOWNS No. Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor 2 S: Scheduled 04.001 040419 S 264.0 C 1 Shutdown for Refueling Outage 22.

1 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit was operated at or near full power until 2132 hours0.0247 days <br />0.592 hours <br />0.00353 weeks <br />8.11226e-4 months <br /> on April 19, 2004, when the unit power reduction was started for Refueling Outage 22.

There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month.