- WO 02-0003, 3 to Wolf Creek Generating Station Physical Security Plan, Safeguards Contingency Plan & Security Training & Qualification Plan
- WO 02-0012, Operating Corp, Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms
- WO 02-0014, Submittal of Occupational Radiation Exposure Report for Wolf Creek Generating Station Unit 1 for Period of 01/01/2001 - 12/31/2001
- WO 02-0019, Annual Radioactive Effluent Release Report - Report 25
- WO 02-0021, March 2002 Monthly Operating Report for Wolf Creek Generating Station
- WO 02-0022, Operating Corporation Participation in USNRC National Security Clearance Program
- WO 02-0023, Annual Environmental Operating Report
- WO 02-0031, Supplemental Information Regarding the Application to Revise Technical Specification 5.0, Administrative Controls.
- WO 02-0033, May 2002 Monthly Operating Report for Wolf Creek Generating Station
- WO 02-0036, Radiological Emergency Response Plan Implementing Procedure Forms
- WO 02-0037, Preparation and Scheduling of Operator Licensing Examinations
- WO 02-0038, June 2002 Monthly Operating Report for Wolf Creek Generating Station
- WO 02-0043, Notification of Changes at Wolf Creek Generating Station Affecting the Wolf Creek Generating Station Physical Security Plan, the Safeguards Contingency Plan and the Security Training and Qualification Plan
- WO 02-0045, July 2002 Monthly Operating Report for Wolf Creek Generating Station
- WO 02-0055, Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms
- WO 02-0058, Notification of Changes at Wolf Creek Affecting Physical Security Plan
- WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station
- WO 02-0062, Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form
- WO 03-0004, Notification of Changes at Wolf Creek Generating Station Affecting the Physical Security Plan, the Safeguards Contingency Plan, and the Security Training and Qualification Plan
- WO 03-0009, Application for Amendment to License NPF-42 to Revise Technical Specification 3.8.1, AC Sources -- Operating, to Allow Surveillance Testing of Onsite Standby Emergency Diesel Generators (Dgs) During Modes Currently Prohibited
- WO 03-0010, Withdrawal of Relief Request 12R-26
- WO 03-0024, Special Report 2003-001 for Wolf Creek Re Unavailability of Post Accident Monitoring Equipment
- WO 03-0039, Notification of Changes at Wolf Creek Generating Station Affecting Wolf Creek Generating Station Physical Security Plan, Safeguards Contingency Plan, & Security Training & Qualification Plan
- WO 03-0048, Response to Generic Letter 2003-01, Control Room Habitability
- WO 03-0049, Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
- WO 03-0055, Notification of Change at Wolf Creek Generating Station Affecting the Physical Security Plan
- WO 03-0057, Revision to Technical Specifications Regarding Extensions of AC Electrical Power Distribution Completion Time
- WO 03-0058, Response to RIS 2003-14, Preparation and Scheduling of Operator Licensing Examinations
- WO 03-0062, Response to RAI for the Revision to Technical Specifications 3.8.1, AC Sources - Operating and 3.8.4, DC Sources - Operating.
- WO 03-0063, Steam Generator Tube Plugging Report
- WO 03-0064, Supplement to Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
- WO 03-0068, Response to NRC Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System
- WO 04-0001, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process
- WO 04-0002, Defense-in-Depth and Diversity Assessment for Digital Upgrade of Wolf Creek'S Instrumentation and Control Systems
- WO 04-0005, Full Compliance with Order for Compensatory Measures Related to Access Authorization
- WO 04-0010, Transmittal of Cycle 14 Core Operating Limits Report
- WO 04-0011, Transmittal of the Semi-Annual Fitness-for-Duty Program Performance Data Report for Period Ending December 31, 2003
- WO 04-0013, Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating.
- WO 04-0022, Supplemental Response to the April 29, 2003, Order
- WO 04-0025, Use of Encryption Software for Electronic Transmission of Safeguards Information
- WO 04-0027, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process
- WO 04-0030, Revision to Technical Specification 3.6.3, Containment Isolation Valves
- WO 04-0031, Revision to Technical Specification (TS) 5.3, Unit Staff Qualifications, and Corrections to Various TSs
- WO 04-0035, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process
- WO 04-0038, Response to Request for Additional Information Regarding the Training and Qualification Plan
- WO 04-0039, 60-Day Response to NRC Bulletin 2004-01, 'Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.
- WO 04-0041, Response to Request for Additional Information Regarding the Application for Technical Specification Change Regarding Mode Change Limitations
- WO 04-0042, Supplemental Information for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation
- WO 04-0045, Operating Corporation'S Revised Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan
- WO 04-0047, Full Compliance with Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel (EA-03-039)
- WO 04-0048, Response to Request for Additional Information for Revision to TS 3.3.1, Reactor Trip' System Instrumentation, & TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation.
- WO 04-0049, Full Compliance with Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (EA-03-086.)
- WO 04-0051, Operating Corporation Response to Generic Letter 2003-01: Control Room Habitability
- WO 04-0056, Special Report 2004-001 Re Inoperability of the a Train of Reactor Vessel Level Indicating System for Greater than 30 Days
- WO 05-0003, Operating Corporation Response to Generic Letter 2003-001: Control Room Habitability
- WO 05-0019, Response to NRC Guidance Regarding Mitigation Strategies
- WO 05-0027, Completion of Activities Performed in Response to NRC Guidance Regarding Mitigation Strategies
- WO 05-0028, Response to RIS 2005-19, Preparation and Scheduling of Operator Licensing Examinations.
- WO 05-0030, Response to Request for Additional Information Regarding the February 2002, Order Section B.5.b, for Wolf Creek Generating Station, Unit 1
- WO 06-0014, Supplement to Revision to Technical Specifications - Extensions of AC Electrical Power Distribution Completion Times
- WO 06-0022, Supplement to Revision to Technical Specification 5.5.83 Inservice Testing Program to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-479, Revision 0
- WO 06-0023, Revision to Technical Specification 3.5.2, ECCS - Operating.
- WO 06-0028, Operating Corporation Update Response to Requested Information Part 2 of Generic Letter 2004-02; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- WO 06-0035, Groundwater Questionnaire
- WO 06-0038, Preparation and Scheduling of Operator Licensing Examinations
- WO 06-0041, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs)
- WO 07-0012, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program
- WO 07-0013, Operating Corporation, Application to Use Weighting Factors for External Exposure
- WO 07-0016, Operating Station, NRC Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations
- WO 07-0025, NRC Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations
- WO 07-0029, License Renewal Application, Amendment 5
- WO 08-0001, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
- WO 08-0006, Request for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating.
- WO 08-0016, Response to NRC Regulatory Issue Summary (RIS) 2008-16, Preparation and Scheduling of Operator Licensing Examinations
- WO 08-0019, Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A
- WO 08-0022, Response to NRC Request for Additional Information Related to NRC Bulletin 2007-01, Security Officer Inattentiveness
- WO 09-0005, Operating Corp., Submittal of License Amendment Request for Adoption of TSTF-51 1, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.
- WO 09-0011, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4
- WO 09-0016, Supplement to License Amendment Request for Adoption of TSTF-511, Rev. 0
- WO 09-0021, Response to NRC Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations
- WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases
- WO 09-0030, Implementation of 10 CFR Part 26, Subpart I
- WO 09-0044, Revision to Renewed Facility Operating License and Request for Approval of the Cyber Security Plan
- WO 09-0053, Supplement to License Amendment Request for Revision to Renewed Facility Operating License & Approval of the Cyber Security Plan
- WO 10-0010, Updated Safety Analysis Report, Revision 23
- WO 10-0012, Reply to Notice of Violation EA-10-004 and EA-10-020
- WO 10-0013, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating
- WO 10-0020, Cancellation of Licensee Event Report 2009-008-00, Potential for Containment Coolers to Not Have Automatically Started in Slow Speed
- WO 10-0032, Cancellation of Licensee Event Report 2009-007-00, Removal of Equipment from Service Required by Technical Specifications and NRC Safety Evaluation
- WO 10-0039, to the Wolf Creek Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
- WO 10-0045, Revision to Response to NRC Generic Letter 2007-01
- WO 10-0048, Revision to Renewed Facility Operating License and Request for Approval of the Cyber Security Plan
- WO 10-0049, Response to NRC Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations.
- WO 10-0053, Letter Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating.
- WO 10-0066, Correction of Typographical Error in Technical Specification 5.7.2
- WO 10-0079, Update to Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope
- WO 11-0002, Response to Request for Additional Information Regarding License Amendment Request for Approval of the Cyber Security Plan
- WO 11-0008, Revision to Technical Specifications 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems
- WO 11-0010, Updated Safety Analysis Report, Revision 24
- WO 11-0013, Security, Training and Qualification, and Contingency Plan
- WO 11-0015, License Amendment Request to Incorporate Proposed Changes Into WCGS Technical Specification
- WO 11-0017, Response to Request for Additional Information Regarding License Amendment Request for Approval of the Cyber Security Plan
- WO 11-0019, Revision to Renewed Facility Operating License Amendment Request and Request for Approval of the Cyber Security Plan
- WO 11-0026, Request for Approval of Secure Voice Communications Ccore Module by Cellcrypt Limited
- WO 11-0031, Day Response to NRC Bulletin 2011-01, Mitigating Strategies
- WO 11-0033, Cancellation of Licensee Event Report 2011-001-00, Potential for a CVCS Through-Weld Leak to Affect Reactor Coolant System Inventory After a Loss of Coolant Accident.
- WO 11-0053, Response to NRC Regulatory Issue Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations.
- WO 11-0055, Day Response to NRC Bulletin 2011-01, Mitigating Strategies.
- WO 11-0064, Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System.
- WO 11-0086, Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating
- WO 12-0010, Cancellation of Licensee Event Report 2011-010-00, Diesel Generator Declared Inoperable Due to Inadequate Adjustment of the Diesel Generator Governor.
- WO 12-0028, Revision 8 to the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Cover Letter)
- WO 12-0035, Application for License Amendment to Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems.
- WO 12-0044, Operating Corporation - 60-Day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima.
- WO 12-0045, Revision to Cyber Security Plan Implementation Schedule Milestone
- WO 12-0047, Request for Interpretation of Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System
- WO 12-0049, Operating Corporation - 90-day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima......
- WO 12-0066, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.
- WO 12-0071, Revision to a Commitment Made in Reply to Notice of Violation EA-12-135
- WO 12-0074, Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating.
- WO 13-0002, Request for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating.
- WO 13-0010, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System.
- WO 13-0015, Operating Corporation - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- WO 13-0033, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- WO 13-0038, Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System
- WO 13-0050, Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating.
- WO 13-0065, Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations
- WO 13-0068, Revision to Commitment Made in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Ac
- WO 13-0070, Reply to Notice of Violation EA-13-084
- WO 13-0075, Five Year Re-Certification of the Wolf Creek Nuclear Operating Corporation Standard Practice Procedures Plan
- WO 13-0089, Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process
- WO 13-0104, Request for Regulatory Conference (EA-13-199)
- WO 14-0002, Operating Corporation - 10 CFR 50.55a Requests 13R-08 and 13R-09 for the Third Inservice Inspection Program Interval
- WO 14-0004, Supporting Documentation for Requested Regulatory Conference (EA-13-199)
- WO 14-0023, Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2
- WO 14-0024, Changes to Technical Specification Bases - Revisions 57 Through 60
- WO 14-0031, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis
- WO 14-0032, Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis
- WO 14-0033, Operating Corporation - Redacted Version of License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date
- WO 14-0037, Closure of Essential Service Water System Corrosion Monitoring Commitment
- WO 14-0038, Request for Interpretation of Technical Specification 3.7.11, Control Room Air Conditioning System (Cracs).
- WO 14-0042, Operating Corp.'S Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.
- WO 14-0043, Supplemental Information in Support of the License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis Methodologies
- WO 14-0054, Response to NRC Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations
- WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
- WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- WO 15-0022, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.
- WO 15-0044, Proposed License Condition Regarding License Amendment Request for Revision to Technical Specification 5.6.5 for Large Break Loss-of-Coolant Accident (LOCA) Analysis Methodology
- WO 15-0045, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
- WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14
- WO 16-0003, Responses to Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- WO 16-0026, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
- WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09
- WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
- WO 16-0046, Operating Corporation - Request for Regulatory Conference
- WO 16-0052, Relief Request Number I4R-03, Request for Relief from Paragraph-3200(b) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds and Relief Request I4R-04, Request for Relief from the Requirements of ASME Code Case N-729
- WO 16-0068, Docket No. 50-482: Request for Regulatory Conference
- WO 16-0069, Operating Corp. - Request for Regulatory Conference
- WO 17-0009, Revision 30 to Updated Safety Analysis Report
- WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme
- WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
- WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses
- WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.
- WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
- WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme
- WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary
- WO 17-0092, Request for Regulatory Conference (EA-17-149)
- WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan
- WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...
- WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
- WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
- WO 18-0016, License Amendment Request for Revision to the Emergency Plan
- WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1
- WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
- WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection
- WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
- WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan
- WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
- WO 19-0011, Financial Protection Levels
- WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4
- WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4
- WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System
- WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008
- WO 20-0024, Financial Protection Levels
- WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
- WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report
- WO 20-0047, Guarantee of Payment of Deferred Premiums
- WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating
- WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange
- WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008
- WO 21-0002, Notification of Readiness for Supplemental Inspection 92723
- WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report
- WO 21-0014, Financial Protection Levels
- WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan
- WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations
- WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums
- WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness
- WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness
- WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008
- WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations