Category:Letter type:SBK
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:SBK"
The following 200 pages are in this category, out of 679 total.
(previous page) (next page)S
- SBK-L-04002, Nuclear Decommissioning Financing Committee Docket 2004-1
- SBK-L-04004, June 2004 Monthly Operating Report for Seabrook Station
- SBK-L-04013, Response to Request for Additional Information Regarding License Amendment Request 03-01
- SBK-L-04019, Semi-Annual Fitness-For-Duty Report
- SBK-L-04020, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
- SBK-L-04031, July 2004 Monthly Operating Report for Seabrook Station, Unit 1
- SBK-L-04040, Steam Generator Inservice Inspection
- SBK-L-04044, Changes to License Amendment Request 04-03, Application for Stretch Power Uprate
- SBK-L-04049, Response to Request for Additional Information Regarding License Amendment Request 03.02
- SBK-L-04050, Submittal of Changes to the Plant Technical Specification Bases
- SBK-L-04052, Re-submittal of Proprietary Information to Support License Amendment Request 04-03, Application for Stretch Power Uprate
- SBK-L-04053, License Amendment Request 04-07, Revision to Technical Specification Surveillance Requirement 4.6.1.3b, Containment Air Lock Interlock
- SBK-L-04054, August 2004 Monthly Operating Report for Seabrook Station
- SBK-L-04065, ASME Section III and Section XI Relief Request Pr 04-01 for the Repair of CRDM Canopy Seal Welds
- SBK-L-04077, Letter from FPL Energy Seabrook Station - Response to Request for Additional Information, Inspection Report 50-443/2004-003/Predecisional Enforcement Conference. with Slide Attachment
- SBK-L-04083, Revised Response to Request for Additional Information Regarding License Amendment Request 03-02
- SBK-L-04090, Confirmation of Implementation of Orders EA-03-039 and EA-03-086
- SBK-L-04095, Revision to Response to Request for Additional Information Regarding License Amendment Request 04-03. Application for Stretch Power Uprate
- SBK-L-04096, Response to Request for Additional Information Regarding Bulletin 2003-01
- SBK-L-04097, License Amendment Request 04-08 Changes to Technical Specification 3.3.3.6. Accident Monitoring Instrumentation
- SBK-L-04106, October 2004 Monthly Operating Report for Seabrook Station, Unit 1
- SBK-L-04116, Supplemental Response to Request for Additional Information (RAI Nos. 2 and 3) Regarding License Amendment Request 04-03. Application for Stretch Power Uprate
- SBK-L-04120, Letter (Redacted) to NRC from FPL Energy Seabrook in Response to NRC Request
- SBK-L-04121, Submittal of Changes to the Seabrook Station Technical Specification Bases
- SBK-L-04127, Response to Request for Additional Information Regarding License Amendment Request 04-08
- SBK-L-04130, Licensee Qualification for Performing Safety Analyses, Generic Letter 83-11, Supplement 1
- SBK-L-04132, November 2004 Monthly Operating Report for FPL Energy Seabrook Station
- SBK-L-04135, Supplemental Response to Request for Additional Information Regarding License Amendment Request 04-03. Application for Stretch Power Uprate
- SBK-L-04155, Response to Request for Additional Information Regarding License Amendment Request 03-02 Implementation of Alternate Source Term
- SBK-L-05003, December 2004 Monthly Operating Report for Seabrook Station
- SBK-L-05013, License NPF-86 - Supplemental Response to Request for Additional Information Regarding License Amendment Request 04-03. Application for Stretch Power Uprate
- SBK-L-05025, 2004 Annual Report of Challenges to Pressurizer Power-Operated Relief Valves and Pressurizer Safety Valves
- SBK-L-05026, 2004 Annual Report of Primary Coolant Specific Activity
- SBK-L-05027, 2004 Annual Report -- Radiation Exposure by Job Function
- SBK-L-05029, 2004 Annual Report of Removable Contamination from Sealed Source or Fission Detector
- SBK-L-05030, Semi-Annual Fitness-For-Duty Report from 07/1/2004 Through 12/31/2004
- SBK-L-05032, Supplemental Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate
- SBK-L-05038, Decommissioning Funding Status Report
- SBK-L-05039, January 2005 Monthly Operating Report for Seabrook Station
- SBK-L-05050, Response to Request for Additional Information Regarding License Amendment Request 03-03
- SBK-L-05054, Supplemental Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate
- SBK-L-05055, License Amendment Request 05-03 Exemption from the End of Life Moderator Temperature Coefficient Measurement
- SBK-L-05056, Guarantees of Payments of Deferred Premiums
- SBK-L-05067, February 2005 Monthly Operating Report for Seabrook Station, Unit 1
- SBK-L-05072, License Amendment Request 05-01 Request for Amendment to Facility Operating License NPF-86 Recapture of Zero-Power and Low Power Testing/Time
- SBK-L-05101, Safety Evaluation Report Discrepancies
- SBK-L-05102, 2004 Annual Radiological Environmental Operating Report
- SBK-L-05103, Transmittal of 2004 Annual Radioactive Effluent Release Report
- SBK-L-05104, 2004 Annual Environmental Operating Report
- SBK-L-05108, April 2005 Monthly Operating Report for Seabrook Station, Unit 1
- SBK-L-05122, Cycle 11 Core Operating Limits Report
- SBK-L-05130, Response to NRC Bulletin 2004-01, Request 2, Inspection of Alloy 82/182/600 Materials 60-Day Report
- SBK-L-05131, May 2005 Monthly Operating Report for Seabrook Station
- SBK-L-05145, Inservice Inspection Examination Report
- SBK-L-05146, Cycle 11 Startup Report
- SBK-L-05154, June 2005 Monthly Operating Report for Seabrook Station
- SBK-L-05160, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
- SBK-L-05166, Semi-Annual Fitness-for-Duty Report
- SBK-L-05172, Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage
- SBK-L-05174, Decommissioning Financing Committee
- SBK-L-05186, License Amendment Request 05-08, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet
- SBK-L-05196, August 2005 Monthly Operating Report for Seabrook Station
- SBK-L-05197, License Amendment Request 05-06 Application for Amendment to Technical Specification 6.15 for a Six Month Extension to the Containment Integrated Leak Rate Test Interval
- SBK-L-05198, 10CFR Part 71 Quality Assurance Program
- SBK-L-05200, Response to Request for Additional Information Regarding License Amendment Request 05-01 Recapture of Zero-Power and Low-Power Testing Time
- SBK-L-05205, License Amendment Request 05-04, Application for Measurement Uncertainty Recapture Power Uprate
- SBK-L-05210, Response to Regulatory Issue Summary 2005-19
- SBK-L-05211, September 2005 Monthly Operating Report for Seabrook Unit No. 1
- SBK-L-05223, Withdrawal of License Amendment Request 04-05, Associated with Changes to Spent Fuel Assembly Storage Technical Specifications
- SBK-L-05225, License Amendment Request 05-10 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports
- SBK-L-05226, Completion of License Condition 2.K
- SBK-L-05258, Request for Exercise of Enforcement Discretion
- SBK-L-05259, November 2005 Monthly Operating Report for Seabrook Station
- SBK-L-05260, License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1, Onsite Power Distribution, for Vital Inverter Allowed Outage Time
- SBK-L-05275, Clerical Errors with Respect to Deposits to Decommissioning Trust
- SBK-L-06002, December 2005 Monthly Operating Report for Seabrook Station
- SBK-L-06006, Completion of License Condition 2.K Supplemental Information
- SBK-L-06013, 2005 Annual Report of Challenges to Pressurizer Power-Operated Relief Valves and Pressurizer Safety Valves
- SBK-L-06014, 2005 Annual Report of Removable Contamination from Sealed Source or Fission Detector
- SBK-L-06017, Semi-Annual Fitness-for-Duty Report
- SBK-L-06027, Licence Amendment Request 05-04 Revised Approval Date
- SBK-L-06036, January 2006 Monthly Operating Report for Seabrook Station
- SBK-L-06042, Decommissioning Funding Status Report
- SBK-L-06044, Notification of Deviation from MRP-139 Inspection Requirement
- SBK-L-06050, February 2006 Monthly Operating Report for Seabrook Station Unit 1
- SBK-L-06055, Response to Request for Additional Information Regarding License Amendment Request 05-04, Application for Measurement Uncertainty Recapture Power Uprate
- SBK-L-06058, 2005 Annual Report - Radiation Exposure by Job Function
- SBK-L-06059, License Amendment Request 06-03 Application for Amendment to Technical Specifications for Miscellaneous Changes
- SBK-L-06063, License Amendment Request 06-01, Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process
- SBK-L-06064, License Amendment Request 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using the Consolidated Line Item Improvement Process
- SBK-L-06065, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
- SBK-L-06068, Resubmittal of Semi-Annual Fitness-For-Duty Report
- SBK-L-06070, Reactor Vessel Surveillance Capsule Report
- SBK-L-06071, Reactor Vessel Weld Wire Material Data Update
- SBK-L-06072, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1, Onsite Power Distribution, for Vital Inverter Allowed Outage Time
- SBK-L-06080, March 2006 Monthly Operating Report for Seabrook Station
- SBK-L-06081, Response to Request for Additional Information Regarding Completion of License Condition 2.K
- SBK-L-06083, 2005 Annual Environmental Operating Report
- SBK-L-06097, 2005 Annual Radiological Environmental Operating Report
- SBK-L-06099, Revision to Cycle 11 Core Operating Limits Report
- SBK-L-06104, Response to Request for Additional Information Regarding License Amendment Request 05-04 Application for Measurement Uncertainty Recapture Power Uprate
- SBK-L-06107, April 2006 Monthly Operating Report for Seabrook, Unit 1
- SBK-L-06119, Relaxation Request from the First Revised NRC Order EA-03-009 Regarding Requirements for Nondestructive Examination of Nozzles Below the J-Groove
- SBK-L-06125, May 2006 Monthly Operating Report for Seabrook Station
- SBK-L-06127, Emergency License Amendment Request 06-07, Containment Enclosure Emergency Air Cleanup System Allowed Outage Time One Time Change
- SBK-L-06131, Response to Request for Additional Information Regarding Emergency License Request 06-07, Containment Enclosure Emergency Air Cleanup System Allowed Outage Time One Time Change
- SBK-L-06132, Revised Response to Request for Additional Information Regarding Emergency License Amendment Request 06-07, Containment Enclosure Emergency Air Cleanup System Allowed Outage Time One Time Change
- SBK-L-06147, June 2006 Operating Report for Seabrook Station
- SBK-L-06149, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
- SBK-L-06151, Discrepancies in the Safety Evaluation Related to Amendment 110 for Measurement Uncertainty Recapture Power Uprate
- SBK-L-06157, Response to Request for Additional Information Regarding License Amendment Request 05-08 Limited Inspection of the Steam Generator Tube Portion within the Tubesheet
- SBK-L-06158, Response to Request for Additional Information Regarding License Amendment Request 06-02 Application for Technical Specification Improvement Regarding Steam Generator Integrity Using the Consolidated Line Item Improvement Process
- SBK-L-06166, Proprietary Information to Support Response to Request for Additional Information Re License Amendment Request 05-08, Limited Inspection of Steam Generator Tube Portion within the Tubesheet
- SBK-L-06168, Payment of Civil Penalty, EA-06-062
- SBK-L-06171, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time
- SBK-L-06173, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis
- SBK-L-06176, Semi-Annual Fitness-For-Duty Report
- SBK-L-06180, NPDES Permit NH0020338 Renewal Application
- SBK-L-06183, Revision to License Amendment Request 05-08, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet, to Narrow the Scope to a One-Time Allowance
- SBK-L-06197, Response to Regulatory Issue Summary 2006-15
- SBK-L-06198, Official Service List Change
- SBK-L-06208, Core Operating Limits Report for Cycle 12
- SBK-L-06209, Generator Tubes Plugged During Refueling Outage 11 Inservice Inspection
- SBK-L-06214, Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process
- SBK-L-06237, Facility Operating License NPF-86 - Alternate Response Date for Request for Additional Information Regarding License Amendment Request 06-03 Application for Amendment to Technical Specifications for Miscellaneous Changes
- SBK-L-06241, Withdrawal of License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1, Onsite Power Distribution, for Vital Inverter Allowed Outage Time
- SBK-L-06243, Response to Request for Additional Information Regarding License Amendment Request 06-03, Application for Amendment to Technical Specifications for Miscellaneous Changes
- SBK-L-06244, Submittal of Changes to Seabrook Station Technical Specification Bases
- SBK-L-07001, NRC Order EA-03-009 Inspection Results
- SBK-L-07002, NRC Bulletin 2004-01, OR11, Inspection of Alloy 82/182/600 Materials 60-Day Report
- SBK-L-07009, Cycle 12 Startup Report
- SBK-L-07020, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
- SBK-L-07024, Inservice Inspection Examination Report, for Inspections Conducted Prior to and During the Eleventh Refueling Outage That Concluded on November 10, 2006
- SBK-L-07027, Core Operating Limits Report for Cycle 12
- SBK-L-07033, 2006 Annual Report of Removable Contamination from Sealed Source or Fission Detector
- SBK-L-07034, 2006 Annual Report of Primary Coolant Specific Activity
- SBK-L-07040, Semi-Annual Fitness-For-Duty Report for July-December 2006
- SBK-L-07042, License Amendment Request 07-01 Setpoint Change for Reactor Trip System Interlock P-9
- SBK-L-07047, Decommissioning Funding Status Report
- SBK-L-07064, Notification of RCS Leakage Monitoring Change
- SBK-L-07078, 2006 Annual Radiological Environmental Operating Report
- SBK-L-07087, Revised No Significant Hazards Consideration Determination for License Amendment Request 06-03, Application for Amendment to the Technical Specifications for Miscellaneous Changes
- SBK-L-07088, Steam Generator Inservice Inspection
- SBK-L-07103, Annual Reporting of Changes to, or Errors in, Emergency Core Cooling System Models or Applications
- SBK-L-07112, License Amendment Request 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
- SBK-L-07120, Request for Use of Structural Weld Overlays as an Alternative Repair Technique
- SBK-L-07133, Transmittal of Procedures OS1290.03 and OS1290.04
- SBK-L-07138, Justification for Mitigation of Alloy 600/82/182 Pressurizer Butt Welds in 2008
- SBK-L-07139, Response to Request for Additional Information for License Amendment Request 06-03, Application for Amendment to the Technical Specifications for Miscellaneous Changes
- SBK-L-07142, Correction to License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
- SBK-L-07144, Response to Regulatory Issue Summary 2007-17
- SBK-L-07148, Semi-Annual Fitness-For-Duty Report
- SBK-L-07181, Supplemental Information for License Amendment Request 07-01, Setpoint Change for Reactor Trip System Interlock P-9
- SBK-L-07192, Transmittal of LER 07-S01-01, Seabrook Station Loss of Control of Safeguards Information at a Contract Company
- SBK-L-07198, Notice of Intent to Pursue License Renewal
- SBK-L-08005, License Amendment Request 07-04 Application for Amendment to Delete Post-Maintenance Testing Surveillance Requirement for Containment Isolation Valves
- SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat
- SBK-L-08010, Submittal of Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
- SBK-L-08022, Supplement to Request for Use of Structural Weld Overlays as an Alternative Repair Technique
- SBK-L-08025, 2007 Annual Report of Removable Contamination from Sealed Source or Fission Detector
- SBK-L-08026, 2007 Annual Report of Primary Coolant Specific Activity
- SBK-L-08027, Semi-Annual Fitness-For-Duty Report, for Period of 01/01/2007 Through 12/31/2007
- SBK-L-08033, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
- SBK-L-08039, License Amendment Request 08-01, Application for Change to the Technical Specification Surveillance Requirements for Nuclear Instrumentation
- SBK-L-08053, Response to Request for Additional Information License Amendment Request (LAR) 08-01, Application for Change to the Technical Specification Surveillance Requirements for Nuclear Instrumentation
- SBK-L-08058, Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Energy Core Cooling, Decay Heat Removal, and Containment Spray Systems.
- SBK-L-08065, Transmittal of 2007 Annual Radiological Environmental Operating Report
- SBK-L-08066, Core Operating Limits Report for Cycle 13
- SBK-L-08074, Transmittal of Preliminary Results of the OR12 Structural Weld Overlay Examination Completed on April 22, 2008
- SBK-L-08085, OR12 Structural Weld Overlay Examination Results
- SBK-L-08102, Response to Request for Additional Information Related to Steam Generator Inspections Performed During the Eleventh Refueling Outage
- SBK-L-08103, Notification of Completed Actions and Commitments Addressed in Confirmatory Action Letter in Regard to Alloy 82/182 Butt Welds in the Pressurizer
- SBK-L-08125, Response to Clarifying Questions Related to Steam Generator Inspections Performed During the Eleventh Refueling Outage
- SBK-L-08135, Inservice Inspection Examination Report for Inspections Conducted Prior to and During the Twelfth Refueling Outage
- SBK-L-08136, Final Response and Notice of Completion for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
- SBK-L-08138, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration
- SBK-L-08144, Response to Regulatory Issue Summary 2008-16
- SBK-L-08146, Semi-Annual Fitness-For-Duty Report for January, 1, 2008 Through June, 30, 2008
- SBK-L-08151, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration
- SBK-L-08163, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration
- SBK-L-08171, Request for Use of a PDI Demonstrated Technique to Examine the Reactor Pressure Vessel Upper Shell-to-Flange Weld
- SBK-L-08173, Request for Use of a Subsequent Edition and Addenda of the ASME Code
- SBK-L-08174, Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface
- SBK-L-08175, Request for Relief from Inservice Inspection Requirements
- SBK-L-08179, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
- SBK-L-08190, Supplement to a Request for Use of an Alternate Depth Sizing Qualification
- SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer
- SBK-L-08216, Submittal of Changes to Technical Specification Bases
- SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26
- SBK-L-09029, 2008 Annual Report of Removable, Contamination from Sealed Source or Fission Detector
- SBK-L-09030, 2008 Annual Report of Primary Coolant Specific Activity
- SBK-L-09034, Submittal of Fitness-For-Duty Program Performance Data Report
- SBK-L-09038, Supplement to Request for Relief from Inservice Inspection Requirements
- SBK-L-09055, License Amendment Request 09-02, Application for Amendment to Rename Facility Licensee and Co-Owner FPL Energy Seabrook, LLC to NextEra Energy Seabrook, LLC
- SBK-L-09087, Nextera Energy, Seabrook Station, 2008 Annual Environmental Operating Report for the Period of January 1, 2008 to December 31, 2008
- SBK-L-09090, 2008 Annual Radiological Environmental Operating Report
- SBK-L-09106, 0 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for Seabrook Station
- SBK-L-09122, Response to Request for Additional Information Regarding a Request for Relief from Inservice Inspection Requirements
- SBK-L-09124, Submittal of Procedure GN1332.00, Security Response to Declared Radiological Emergency, Revision 29
- SBK-L-09154, Response to Request for Additional Information Regarding a Request for Alternative Requirements for ASME Class 1 Pressurizer Upper Level Instrumentation Lines