Category:Letter type:RBG
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:RBG"
The following 200 pages are in this category, out of 621 total.
(previous page) (next page)R
- RBG-32249, NRC Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment.
- RBG-34252, Suppls 900202 Response to Generic Ur 89-13, Svc Water System Problems Affecting Safety-Related Equipment. Program to Detect & Control Biofouling in Open-cycle Svc Water System Developed. Additional Response Will Be Submitted by 910515
- RBG-44655, Updated Response to Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment.
- RBG-45789, Report of Changes and Errors to 10CFR50.46
- RBG-45825, Response to NRC Regulatory Issue Summary 2001-17, Preparation & Scheduling of Operator Licensing Examinations
- RBG-45895, Transmittal of Emergency Implementing Procedure (Eip) 2-012 Revision 15 for River Bend Station Unit 1
- RBG-45896, Submittal of River Bend Stations Annual Emergency Plan Information Brochures - 2002
- RBG-45900, Cycle 11 Startup Report
- RBG-45901, License Amendment Request Regarding Deletion of Turbine Building High Temperature Inputs to Main Steam Line Isolation Logic, Technical Specification Table 3.3.6.1-1 Functions 1f., 1g
- RBG-45902, Fitness-For Duty Program Six-Month Performance Data Report
- RBG-45911, January 2002 Monthly Operating Report for River Bend Station
- RBG-45915, Additional Information Related to NRC Generic Letter 96-06
- RBG-45935, Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases
- RBG-45938, Radiological Environmental Operating Report for 2001
- RBG-45942, Entergy Operations, Inc. Annual Radioactive Effluent Release Report for 2001
- RBG-45946, Entergy Nuclear- South, River Bend Station, Unit-1, License Amendment LAR 2002-11 Modification of the Technical Specification Surveillance Requirements for the Safety/Relief Valves
- RBG-45947, Clarification of Response to Order for Interim Safeguards & Security Compensatory Measures
- RBG-45951, Appendix K Measurement Uncertainty Recovery - Power Uprate Request License Amendment Request (LAR) 2002-15
- RBG-45958, Supplement to License Amendment Request (LAR) 2001-027, Emergency Diesel Generator Extended Allowed Outage Time, TS 3.8.1
- RBG-45971, Extension Request for Submittal of Summary Technical Report Regarding Reactor Vessel Material Surveillance Program Capsule Test Results
- RBG-45974, Non-Proprietary Tsar in Support of Appendix K Measurement Uncertainty Recovery - Power Uprate Request License Amendment Request (LAR) 2002-15
- RBG-45976, Entergy Owner Controlled Area Public Notification, River Bend Station - Unit I, License No. NPF-47, Docket No. 50-458. Letter Provided as Supplement to 05/31/2002 Submittal Re Preliminary Finding Associated with Owner Controlled Area Evacu
- RBG-45977, Submittal of Revisions to Emergency Implementing Procedures & Revision No. 25 of Emergency Plan
- RBG-45978, Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
- RBG-45982, License Amendment Request Control Rod Scram Time Testing Frequency (LAR 2001-35)
- RBG-45984, Response to Request for Additional Information on Appendix K Measurement Uncertainty Recovery - Uprate Request (License Amendment Request (LAR) 2002-15)
- RBG-45989, Supplemental to License Amendment Request Full Scope Application of NUREG-1465 Alternative Source Term Insights
- RBG-45992, License Amendment Request Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process (CLIIP) (LAR 2002-22)
- RBG-45993, Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-45994, Submittal of Revisions to Emergency Implementing Procedures
- RBG-46009, Owner Controlled Area Public Information
- RBG-46010, Final Response to Issuance of Order for Interim Safeguards & Security Compensatory Measures
- RBG-46011, Response to Requests for Additional Information Appendix K Measurement Uncertainty Recovery -- Power Uprate Request
- RBG-46012, Response to RAI Appendix K Measurement Uncertainty Recovery -- Power Uprate Request (LAR 2002-15)
- RBG-46033, 10 CFR 50.46(a)(3)(ii) Report
- RBG-46037, Response to Request for Additional Information One-Time Extension of the ILRT Interval License Amendment Request (LAR) 2002-16
- RBG-46043, Environmental Operating Report
- RBG-46045, Submittal of Revisions to Emergency Implementing Procedures
- RBG-46047, Supplement to Amendment Request for Additional Information Concerning the Modification of the Technical Specification Surveillance Requirements for the Reactor Coolant System Safety/Relief Valves
- RBG-46051, Supplement to License Amendment Request 2002-08, Division 1, 2 & 3 Degraded Voltage Set Point Revision Due to Updated Calculations & Installation of Improved Relays
- RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing
- RBG-46073, Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-46081, Supplement 3 to Amendment Request Full-Scope Application of NUREG-1465 Alternative Source Term Insights
- RBG-46084, Revision to LAR 2002-17, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Testing
- RBG-46090, License Amendment Request Application for Technical Specification Improvements to Eliminate Requirements for Post Accident Sampling Stations for Boiling Water Reactors Using the Consolidated Line Item Improvement (CLIIP)
- RBG-46102, Unit 1, Twelfth Fuel Cycle Core Operating Limits Report (COLR)
- RBG-46111, Radiological Environmental Operating Report for 2002
- RBG-46112, Radioactive Effluent Release Report for 2002., River Bend Station, Unit 1
- RBG-46124, Supplement to License Amendment Request, (LAR) 2001-43, High Energy Line Break Analysis Method
- RBG-46129, Revision to License Amendment Request (LAR) 2002-01, Reporting Requirements for Operating License Condition Violations and Monthly Operating Reports
- RBG-46145, Power Uprate Startup Report
- RBG-46150, Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-46155, 60-Day Response to Generic Letter 2003-01, Control Room Habitability.
- RBG-46174, CFR 50.46 (a)(3)(ii) Report
- RBG-46175, Submittal of Revisions to Emergency Implementing Procedures
- RBG-46179, Revisions to the Technical Requirements Manual and the Technical Specification Bases
- RBG-46182, Supplement to Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (COLR)
- RBG-46183, License Amendment Request Deletion of Technical Specification 3.6.4.4 Shield Building Annulus Mixing System; and Revision of Main Steam Isolation Value(Msiv) Surveillance Requirement SR 3.6.1.3.10
- RBG-46184, Twelfth Fuel Cycle Core Operating Limits Report (COLR)
- RBG-46186, September 2003 Monthly Operating Report for River Bend Station, Unit 1
- RBG-46196, October 2003 Monthly Operating Report for River Bend, Unit 1
- RBG-46203, Annual Environmental Operating Report (Non-Radiological) for the Period August 29, 2002 to August 28, 2003
- RBG-46206, November 2003 Monthly Operating Report for River Bend Unit 1
- RBG-46211, Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01, Revision 4 Methodology - LAR 2003-027
- RBG-46212, December 2003 Monthly Operating Report for River Bend Station, Unit 1
- RBG-46214, Application for Technical Specification Improvements to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process
- RBG-46217, Address Change
- RBG-46220, Submittal of Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-46222, Supplement to Amendment Request, Deletion of Technical Specification 3.6.4.4, Shield Building Annulus Mixing System; and Revision of Main Steam Isolation Valve (MSIV) Surveillance Requirement SR 3.6.1.3-10
- RBG-46226, License Amendment Request for One-Time Extension of the Drywell Bypass Test Interval
- RBG-46228, January 2004 Monthly Operating Report for River Bend Station, Unit 1
- RBG-46233, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LAR 2004-04
- RBG-46248, February 2004 Monthly Operating Report for River Bend Unit 1
- RBG-46250, Supplement to Amendment Request License Amendment Request (LAR) 2001-43, High Energy Line Break Analysis Method
- RBG-46257, Submittal of Revision No. 26 to the Emergency Plan
- RBG-46259, March 2004 Monthly Operating Report for River Bend, Unit 1
- RBG-46264, Radiological Environmental Operating Report for 2003
- RBG-46265, Unit 1, Radioactive Effluent Release Report for 2003
- RBG-46266, Supplemental Response to the April 29, 2003 Orders to Entergy
- RBG-46271, Unit 1, Submittal of Revisions to Emergency Implementing Procedures
- RBG-46276, Supplement to Amendment Request, License Amendment Request (LAR) 2001-43, High Energy Line Break Analysis Method
- RBG-46277, April 2004 Monthly Operating Report for River Bend, Unit 1
- RBG-46279, Supplement to Amendment Request for a One-Time Extension of the Drywell Bypass Test Interval
- RBG-46283, May 2004 Monthly Operating Report for River Bend Station Unit 1
- RBG-46295, June 2004 Monthly Operating Report for River Bend Station Unit 1
- RBG-46297, Fitness-For-Duty Program Six-Month Performance Data Report
- RBG-46301, Unit I, NRC Temporary Instruction 2515/156 Offsite Power System Operational Readiness
- RBG-46306, July 2004 Monthly Operating Report for River Bend Station, Unit 1
- RBG-46308, 10 CFR 50.46 (a)(3)(ii) Report. Areva Has Issued Report Documenting the Impact of a Mismatch Between the Recirculation Loops Flow on the ATRIUM-10 PCT Analysis
- RBG-46323, Entergy Nuclear-South Submittal of Revision to Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses
- RBG-46325, License Amendment Request, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
- RBG-46335, Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Safeguards Contingency Plans Incorporating RAI Responses
- RBG-46341, September 2004 Monthly Operating Report for River Bend, Unit 1
- RBG-46353, Entergy Operations, Inc. - Implementation Confirmation for Orders Dated April 29, 2003
- RBG-46358, Thirteenth Fuel Cycle Core Operating Limits Report (COLR)
- RBG-46363, October 2004 Monthly Operating Report for River Bend Station Unit 1
- RBG-46368, Additional Information Regarding River Bend Station Fluence Calculations
- RBG-46369, License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations.
- RBG-46370, November 2004 Monthly Operating Report for River Bend Station - Unit 1
- RBG-46375, License Amendment Request, Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 and 2 Battery Charger
- RBG-46376, License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports
- RBG-46385, Final Response to NRC Generic Letter (GL) 2003-01, Control Room Habitability
- RBG-46397, January 2005 Monthly Operating Report for River Bend Station - Unit 1
- RBG-46399, Fitness-For-Duty Program, Six Month Performance Data Report
- RBG-46403, Submittal of Owners Activity Report Forms (OAR-1)
- RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval
- RBG-46410, February 2005 Monthly Operating Report for River Bend Station - Unit 1
- RBG-46413, Supplement to Amendment Request Re End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation (LAR 2004-15)
- RBG-46419, Revisions to the Technical Requirements Manual and the Technical Specifications Bases
- RBG-46426, Supplement to License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations
- RBG-46429, 90-Day Advance Notification of ISFSI Operations
- RBG-46431, Unit 1, Radiological Environmental Operating Report for 2004
- RBG-46432, Radioactive Effluent Release Report for 2004
- RBG-46439, April 2005 Monthly Operating Report for River Bend Station, Unit 1
- RBG-46443, Response to NRC Guidance Regarding Mitigation Strategies
- RBG-46445, Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology - LAR 2003-27
- RBG-46449, Supplement to Amendment Request Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 or 2 Battery Charger
- RBG-46465, Supplement to Amendment Request Amendment to Technical Specification 3.8.4 Actions for Inoperable Division 1 or 2 Battery Charger
- RBG-46468, Transmittal of the Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements
- RBG-46478, Revised License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations Dated March 8, 2005
- RBG-46479, Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements
- RBG-46482, Mitigating Strategies Request for Additional Information
- RBG-46493, Supplement to License Amendment Request (LAR) 2006-03, Leakage Rate Testing of Containment Purge Valves
- RBG-46495, Supplement to Revised License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations
- RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements
- RBG-46515, Cask Registration
- RBG-46517, Supplement to Amendment Request One Time Extension to the Integrated Leak Rate Test Interval
- RBG-46522, Unit 1, Request for Renewal of Quality Assurance Program Approval Form Radioactive Material Packages (Approval No. 0566)
- RBG-46533, Fitness-For-Duty Program Six-Month Performance Data Report
- RBG-46550, Response to Non-cited Violation in IR 50-458/2005-005
- RBG-46554, Response to Generic Letter 06-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.
- RBG-46561, Radiological Environmental Operating Report for 2005, River Bend Unit 1
- RBG-46562, Radioactive Effluent Release Report for 2005
- RBG-46568, Thirteenth Fuel Cycle Core Operating Limits Report
- RBG-46570, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations.
- RBG-46577, Clarification of Response to Generic Letter 2006-03
- RBG-46583, License Amendment Request, Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr)
- RBG-46602, Response to Additional Information Request Related to Preliminary White Finding in Inspection Report 50-458/2006-011
- RBG-46603, Groundwater Protection Baseline Information
- RBG-46606, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (Cliip), and Correct Example 1.4-1 (TSTF-485)
- RBG-46607, Submittal of Owners Activity Report Form (OAR-1)
- RBG-46609, Fitness-For-Duty Program Six-Month Performance Data Report
- RBG-46615, 10 CFR 50.46(a)(3)(ii) Report
- RBG-46619, Response to Regulatory Issues Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
- RBG-46633, Submittals of Revisions to Technical Requirements Manual and Technical Specification Bases
- RBG-46643, Re Special Report of ECCS Actuation
- RBG-46648, Response to Request for Additional Information for Generic Letter 2006-02
- RBG-46649, Fitness-for-Duty Program Six-Month Performance Data Report
- RBG-46660, Spent Fuel Storage Radioactive Effluent Release Report for 2006
- RBG-46666, License Amendment Request - Adoption of TSTF-2, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control
- RBG-46669, License Amendment Request, Application for Technical Specification (TS) Change Regarding Ventilation Filter Testing Program (Vftp), TS 5.5.7, Control Room Fresh Air System (Crfas) Heater Wattage
- RBG-46688, Radiological Environmental Operating Report for 2006
- RBG-46690, License Amendment Request, Application for Technical Specification Changes Using the Consolidated Line Item Improvement Process (CLIIP)
- RBG-46691, Radioactive Effluent Release Report for 2006
- RBG-46712, License Amendment Request 2007-06, Control Room Envelope Habitability (TSTF-448, Revision 3)
- RBG-46716, Fitness-For-Duty Program Six-Month Performance Data Report for Period January 1, 2007 Through June 30, 2007
- RBG-46718, Response to Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations
- RBG-46722, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability
- RBG-46724, License Amendment Request, LAR 2007-10, One-Time Extension of the Integrated Leak Rate Test Interval
- RBG-46735, Response to Request for Additional Information Regarding Proposed License Transfer and Confirming License Amendment Request
- RBG-46736, License Amendment Request (LAR 2007-12) RF14 Surveillance Frequency Extension Request
- RBG-46740, Additional Information - Proposed License Transfer and Confirming License Amendment
- RBG-46746, Withdrawal of License Amendment Request: (LAR 2007-12) RF14 Surveillance Frequency Extension Request
- RBG-46754, Revision to License Amendment Request, Application for Technical Specification (TS) Change Regarding Ventilation Filter Testing Program (Vftp), TS 5.5.7, Control Room Fresh Air System (Crfas) Heater Wattage
- RBG-46767, Order Approving the Transfer of the Facility Operating License No. NPF-47 and Conforming Amendment
- RBG-46771, Emergency License Amendment Request (LAR 2007-22) Local Power Range Monitor Surveillance Frequency Extension Request
- RBG-46780, Order Approving the Transfer of the Facility, Operating License No. NPF-47 and Conforming Amendment
- RBG-46785, Notification of Management Change, Effective on February 4, 2008
- RBG-46786, Response to NRC Bulletin 2007-01, Security Officer Inattentiveness
- RBG-46788, Response to NRC Bulletin 2007-01, Security Officer Inattentiveness
- RBG-46792, Unit 1, Fifteenth Fuel Cycle Core Operating Limits Report (COLR)
- RBG-46795, Order Approving the Transfer of Facility Operating License No. NPF-47 and Conforming Amendment
- RBG-46803, Unit 1, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, January 11, 2008
- RBG-46806, Radiological Environmental Operating Report for 2007
- RBG-46812, Radioactive Effluent Release Report for January 1, 2007 Through December 31, 2007
- RBG-46815, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
- RBG-46816, Submittal of Owners Activity Report Form (OAR-1) for Cycle 14, Between May 2006, and March 2008
- RBG-46828, Submittal of 1OCFR72.48 Summary Report for 12/29/05 - 06/30/08
- RBG-46829, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations
- RBG-46832, Reply to Request for Additional Information Regarding Bulletin 2007-01 Security Officer Attentiveness
- RBG-46841, Submittal of Fitness-For-Duty Program, Six-Month Performance Data Report for the Period January 1, 2008 Through June 30, 2008
- RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases
- RBG-46847, License Amendment Request, 10 CFR 50.46(a)(3)(ii) Report
- RBG-46848, Nine Month Response to NRC Generic Letter 2008-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
- RBG-46861, Submittal of Revision 33 to the Emergency Plan (E-Plan) in Electronic Format (Cd)
- RBG-46867, Submittal of Notification of Spent Fuel Cask Use
- RBG-46868, Notification of the Use of Spent Fuel Cask on 11/21/2008
- RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request
- RBG-46872, Submittal of Notification of Spent Fuel Cask Use
- RBG-46875, Notification of Spent Fuel Cask Use
- RBG-46878, Submittal of Revisions 19 to Emergency Implementing Procedures EIP-2-103
- RBG-46883, Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306
- RBG-46889, Transmittal of Fitness-For-Duty Program Six-Month Performance Data Report for July 1, 2008 Through December 31, 2008
- RBG-46891, Submittal of Spent Fuel Storage Radioactive Effluent Release Report for 2008
- RBG-46896, Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2
- RBG-46901, Responses to Request for Additional Information (RAI) for Main Turbine Bypass System License Amendment Request
- RBG-46909, License Amendment Request, Main Turbine Bypass System
- RBG-46911, Radioactive Effluent Release Report for 2008
- RBG-46912, Submittal of Radiological Environmental Operating Report for 2008