- BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)
- BVY 03-005, Technical Specification Proposed Change No. 256, Administrative Changes to Position Titles and Miscellaneous Changes Supplement No. 1
- BVY 03-016, Entergy Nuclear Northeast - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) for Pilgrim Station, Indian Point Units 2 & 3, James A. Fitzpatrick Nuclear Power Plant & Vermont Yankee
- BVY 03-026, Sources and Levels of Insurance Required by 10 CFR 50.54(w)
- BVY 03-027, Cycle 22 10CFR50.59 Report
- BVY 03-039, Technical Specification Proposed Change No. 257 Implementation of Art/Mellla at Vermont Yankee - Supplement No. 1
- BVY 03-041, Emergency Plan Implementing Procedure Changes
- BVY 03-044, 2002 Annual Report, and Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants
- BVY 03-047, Emergency Plan Implementing Procedure Changes
- BVY 03-065, Emergency Plan Implementing Procedure Changes
- BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 2003
- BVY 03-074, OP 3504, Rev. 36, Lpc 2, Emergency Communications.
- BVY 03-102, Technical Specification Proposed Change No. 262 - Supplement No. 3, Alternative Source Term - Modified Exemption Request
- BVY 03-103, Rev. 25 to OP 3505, Rev. 17 to OP 3531, Rev. 3, LPC1 to OP 3540, and Rev. 2, LPC1 to OP 3545
- BVY 03-106, Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)
- BVY 03-107, Technical Specification Proposed Change No. 262 - Additional Information Alternative Source Term - Copyright Release
- BVY 03-108, Response to NRC Bulletin 2003-04
- BVY 03-110, Report of Bulk Chlorine Rail Shipments for 2003
- BVY 03-111, 10CFR50.46(a)(3)(ii) Annual Report for 2003
- BVY 03-112, Emergency Plan Implementing Procedure Changes
- BVY 03-114, Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change
- BVY 03-117, Response to a RAI Regarding Technical Specification Proposed Change No. 262, Alternative Source Term
- BVY 03-119, Second Response to RAI Regarding Technical Specification Proposed Change No. 262 for Incorporation of an Alternative Source Term
- BVY 03-120, Supplement to Relief Request RI-01
- BVY 04-005, Technical Specification Proposed Change No. 257 Implementation of Arts/Mellla at Vermont Yankee Correction of Peak Cladding Temperature for GE13 Fuel
- BVY 04-009, Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review
- BVY 04-015, Technical Specification Proposed Change No. 257, Supplement No. 6 Regarding Implementation of Arts/Mella Calibration of APRM High Flux Flow Biastrip Function
- BVY 04-016, Annual Submittal of Quality Assurance Program Changes (Revision 14)
- BVY 04-017, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 8 Regarding Alternative Source Term
- BVY 04-018, Fitness-for-Duty Program Performance Report for the Period of July - December 2003
- BVY 04-019, Revision 20, LPC1 to OP 3524, Emergency Actions to Ensure Initial Accountability and Security Response and Revision 2, LPCI1 to Operation of the Technical Support Center(Tsc).
- BVY 04-021, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 9, Alternative Source Term
- BVY 04-022, Response to RAI on Relief Requests to Use ASME Code Case N-600
- BVY 04-023, Response to RAI Regarding Technical Specification Proposed Change No. 262, Supplement No. 10, Alternative Source Term
- BVY 04-025, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Suplement No. 6 Extended Power Uprate - Withholding Proprietary Information
- BVY 04-026, Technical Specification Proposed Change No. 257, Supplement 7, Implementation of Arts/Mella at Vermont Yankee, Revised Anticipated Transient Without Scram Evaluation
- BVY 04-027, Response to RAI on Relief Requests to Use ASME Code Case N-600, Supplement 1
- BVY 04-028, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)
- BVY 04-032, Additional Information in Support of Technical Specification Proposed Changes No. 262, Supplement No. 11, Meteorological Database for Ground-Level Releases
- BVY 04-033, Sources and Levels of Insurance Required by 10 CFR 50.54(w)
- BVY 04-034, Entergy Nuclear Operations, Inc. Service List Update
- BVY 04-038, Change to the Emergency Plan, Revision 39
- BVY 04-039, Emergency Response Data System Data Point Library Update
- BVY 04-040, Core Operating Limits Report for Cycle 24
- BVY 04-041, Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty
- BVY 04-045, Technical Specification Proposed Change No. 262 - Supplement No. 12 Alternative Source Term - Confirmation of Refueling Outage Activities
- BVY 04-054, Response to 10CFR2.206 Petition Information Request
- BVY 04-068, Cycle 24 Startup Test Report
- BVY 04-069, Technical Specification Proposed Change No. 262 - Supplement No. 13, Alternative Source Term - Standby Liquid Control System Check Valves
- BVY 04-076, Amended Responses to Requests for Additional Information Security Plan Sections 1 - 19
- BVY 04-078, Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process
- BVY 04-081, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information
- BVY 04-082, Response to Request for Additional Information Regarding Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
- BVY 04-083, Vermont Yankee Nuclear Power Station - RELAP5/MOD3 Computer Code
- BVY 04-084, Security Group Work Hour Controls
- BVY 04-085, Follow-up Response to Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
- BVY 04-087, Indian Point Nuclear Generating Units 1, 2, and 3, James A. FitzPatrick Nuclear Power Plant, Proof of Financial Protection (10 CFR 140.15)
- BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 2004
- BVY 04-089, Follow-Up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan
- BVY 04-091, Withdrawal of Request for Relaxation of Security Group Work Hour Controls
- BVY 04-094, Re-submittal of Security Plan
- BVY 04-095, Response to NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report
- BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information
- BVY 04-101, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5
- BVY 04-104, Updated Submittal of Security Plan
- BVY 04-105, Technical Specification Proposed Change No. 267 Drywell Spray Header and Nozzle Air Test Frequency
- BVY 04-106, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin
- BVY 04-107, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline
- BVY 04-109, Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program
- BVY 04-110, Request to Amend Previous Approval Granted Pursuant to IOCFR20.2002 for Increase of the Annual Volume Limit and One-time Spreading of Current Inventory
- BVY 04-112, Cycle 23 10 CFR 50.59 Report
- BVY 04-115, Second Updated Submittal of Security Plan
- BVY 04-116, Summary Reports for In-service Inspection and Repairs or Replacements
- BVY 04-117, Emergency Response Data System (ERDS) Data Point Library Update
- BVY 04-118, Technical Specification Proposed Change No. 270 Administrative Changes
- BVY 04-121, Confirmation of Implementation of April 29, 2003, Orders to Vermont Yankee Nuclear Power Station
- BVY 04-124, Response to Request for Additional Information Concerning a 10CFR2.206 Petition Related to Spent Fuel Rod Pieces
- BVY 04-127, Technical Specification Proposed Change No. 271 Removal of Inservice Testing Details
- BVY 04-129, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing
- BVY 04-131, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification
- BVY 04-135, Response to NRC Inspection Report 2004-09, Preliminary White Finding
- BVY 04-136, Use of Encryption Software for Electronic Transmission of Safeguards Information
- BVY 05-002, Corrected Technical Specification Bases Page and Administrative Changes to Facility Operating License Page
- BVY 05-008, Response to the Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook & Information for Next Revision
- BVY 05-010, Request to Use the ASME Boiler and Pressure Vessel Code Section XI 2001 Edition, Through the 2003 Addenda, Subparagraph IWA-4540(a) Requirements for Pressure Testing
- BVY 05-014, Annual Submittal of Quality Assurance Program Changes
- BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 2004
- BVY 05-020, Reply to a Notice of Violation; EA-04-173
- BVY 05-021, Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)
- BVY 05-030, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 25, Extended Power Uprate - Station Blackout and Appendix R Analyses
- BVY 05-031, Sources and Levels of Insurance Required by 10 CFR 50.54(w) for James A. FitzPatrick, Indian Point 1, Indian Point 2, Indian Point 3, Pilgrim and Vermont Yankee Nuclear Power Plants
- BVY 05-032, Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies
- BVY 05-034, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 26 Extended Power Uprate - Steam Dryer Analyses and Monitoring
- BVY 05-035, Transmittal of the 2004 Annual Report of Personnel Exposure
- BVY 05-039, 2004 Annual Report of the Results of Individual Monitoring
- BVY 05-050, Response to Request for Additional Information Regarding Request to Use the ASME Code Section Xl, 2001 Edition, Through the 2003 Addenda, Subparagraph IWA-4540(a) Requirements for Pressure Testing
- BVY 05-057, 2004 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal
- BVY 05-058, Response to NRC Guidance Regarding Mitigation Strategies
- BVY 05-059, Revised Response to Request for Additional Information Regarding Relief Request RI-01
- BVY 05-061, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 29 Extended Power Uprate - Steam Dryer Computational Fluid Dynamics
- BVY 05-062, Technical Specification Proposed Change No. 270 - Supplement No. 1 Administrative Changes - Response to Request for Additional Information
- BVY 05-063, Entergy Nuclear Operations Inc, Service List Update
- BVY 05-065, Response to Request for Information Regarding Updated Final Safety Analysis Report, Appendix F
- BVY 05-066, Comments Regarding License Amendment No. 223
- BVY 05-067, NRC GL-03-001 Control Room Habitability - Final Response
- BVY 05-068, Response to Request for Additional Information - Instrumentation Technical Specifications, Vermont Nuclear Power Station
- BVY 05-071, Clarifications to Relief Request RI-01 Table
- BVY 05-072, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information
- BVY 05-074, Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information
- BVY 05-075, Technical Specification Proposed Change No. 267 Drywell Spray Header and Nozzle Air Test Frequency - Supplement 3
- BVY 05-076, Status of Hemyc Fire Barrier Wrap at Vermont Yankee
- BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 2005
- BVY 05-079, Response to Request for Additional Information Regarding Relief Request B-5, Limited Examinations
- BVY 05-080, Updated Response to NRC Guidance Regarding Mitigation Strategies
- BVY 05-083, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information
- BVY 05-085, Revised Core Operating Limits Report for Cycle 24
- BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information
- BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information
- BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection
- BVY 05-090, Response to Request for Additional Information Regarding Plant Response to the February 2002 Order, Section B.5.b
- BVY 05-097, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 37 Extended Power Uprate - Additional Information
- BVY 05-098, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 38 Extended Power Uprate - Containment Overpressure Credit
- BVY 05-099, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure
- BVY 05-100, Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 40 Extended Power Uprate - Draft Safety Evaluation Proprietary Information
- BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis
- BVY 05-102, Core Operating Limits Report for Cycle 25
- BVY 05-103, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 42 Extended Power Uprate - Steam Dryer Inspection Results
- BVY 05-105, Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages
- BVY 05-107, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 43 Extended Power Uprate - Response to Request for Additional Information
- BVY 05-110, Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 2004
- BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications
- BVY 06-002, 10CFR50.46(a)(3)(ii) Annual Report for 2005
- BVY 06-010, 2006/01/25-Vermont Yankee Nuclear Station License Renewal Application Boundary Drawings
- BVY 06-011, Relief Request ISI-012, Fourth ISI Interval
- BVY 06-013, Summary Reports for In-Service Inspection and Repairs or Replacements
- BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU
- BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005
- BVY 06-018, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages
- BVY 06-019, Vermont Yankee, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and Fiv Effects
- BVY 06-022, 2006/03/15-Vermont Yankee - License Renewal Application, Amendment 1
- BVY 06-023, Revised Core Operating Limits Report for Cycle 25
- BVY 06-024, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21)
- BVY 06-025, Regulatory Commitment Change Schedule for Installation of Capacitor Banks
- BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers
- BVY 06-029, Relief Request ISI-013, Fourth ISI Interval
- BVY 06-030, Sources and Levels of Insurance Required by 10 CFR 50.54(w)
- BVY 06-031, Revision 1 to Steam Dryer Monitoring Plan
- BVY 06-032, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.
- BVY 06-033, Cycle 24 10 CFR 50.59 Report
- BVY 06-038, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
- BVY 06-039, Vermont Yankee Nuclear Power Station Revision 2 to Steam Dryer Monitoring Plan
- BVY 06-043, 2006/05/15-Vermont Yankee Nuclear Power Station, License Renewal Application Amendment No. 2, Additional Information
- BVY 06-045, Response to NRC Generic Letter 2006-03 Regarding Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
- BVY 06-046, Annual 2005 Radioactive Effluent Release Report
- BVY 06-047, 2005 Annual Radiological Environmental Operating Report
- BVY 06-049, Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants
- BVY 06-051, Vermont Yankee - Summary of Reactor Feedwater Pump Trip Analysis
- BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring
- BVY 06-058, 2006/07/06-Vermont Yankee - License Renewal Application, Amendment 3
- BVY 06-060, Technical Specification Proposed Change No. 266 Revision to Control Rod Operability, Scram Time Testing and Control Rod Accumulators, Supplement No. 2 Response to Request for Additional Information (RAI)
- BVY 06-063, 2006/07/14-Vermont Yankee, License Renewal Application, Amendment 4
- BVY 06-064, 2006/07/14-Vermont Yankee License Renewal Application, Amendment 5
- BVY 06-065, 2006/07/27-Vermont Yankee License Renewal Application, Amendment 6
- BVY 06-066, Groundwater Protection - Data Collection Questionnaire
- BVY 06-067, Correction to Technical Specification Page
- BVY 06-068, Cycle 25 Startup Test Report Following Power Ascension and Testing
- BVY 06-071, 2006/08/01-Vermont Yankee Response to Request for Additional Information Regarding License Renewal Application, Amendment 7
- BVY 06-072, Response to Request for Additional Information Regarding Relief Request ISI-013, Fourth 10-Year ISI Interval
- BVY 06-074, Withdrawal of Proposed Change No. 266, Revision to Control Rod Operability Scram Time Testing and Control Rod Accumulators
- BVY 06-076, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 8
- BVY 06-077, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 9
- BVY 06-078, 2006/08/15-Vermont Yankee Nuclear Power Station License Renewal Application, Amendment 10 - Response to RAI Dated July 13, 2006
- BVY 06-080, Vermont Yankee, Extended Power Uprate - License Amendment No. 229 Clarifications to Nrc'S Final Safety Evaluation
- BVY 06-083, 2006/09/05-Vermont Yankee License Renewal Application, Amendment 12
- BVY 06-086, License Renewal Application, Amendment 13, Response to Request for Additional Information Regarding Analysis of Severe Accident Mitigation Alternatives
- BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis
- BVY 06-088, 2006/09/20-Vermont Yankee License Renewal Application, Amendment 14 - Response to Requests for Additional Information Dated August 15 and 16, 2006
- BVY 06-089, Response to Regulatory Issue Summary 2006-15
- BVY 06-090, License Renewal Application, Amendment 15, Response to Requests for Additional Information
- BVY 06-096, 2006/10/20-Vermont Yankee - License Renewal Application, Amendment No. 17
- BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19
- BVY 06-098, E-mail: (PA-LR) Copy of Vhs RAI Response
- BVY 06-099, 2006/11/06-Vermont Yankee License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs
- BVY 06-104, Vermont Yankee Supplement to Annual Radiological Effluent Release Report for Year 2005
- BVY 07-004, Emergency Response Data System (ERDS) Data Point Library Update
- BVY 07-006, 10CFR50.46(a)(3)(ii) Annual Report for 2006
- BVY 07-007, Submittal of Report Pursuant to 10 CFR 50.54(bb), Titled, Vermont Yankee Nuclear Power Station - Program for Maintenance of Irradiated Fuel.
- BVY 07-009, License Renewal Application, Amendment 24
- BVY 07-010, BVY-07-010 EPRI FAC Program Information; 05000271/2007-006
- BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages
- BVY 07-017, Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval
- BVY 07-018, License Renewal Application, Amendment 26
- BVY 07-021, Report of Bulk Chlorine Rail Shipments - 2006
- BVY 07-028, Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
- BVY 07-029, Annual Report of the Results of Individual Monitoring
- BVY 07-031, Intent to Use 10CFR50 Appendix B Quality Assurance Program for Independent Spent Fuel Storage Installation Notification Pursuant to 10CFR72.140(d)
- BVY 07-034, License Renewal Application Annual Update
- BVY 07-037, Annual 2006 Radioactive Effluent Release Report
- BVY 07-038, Submittal of 2006 Annual Radiological Environmental Operating Report
- BVY 07-039, Core Operating Limits Report for Cycle 26