Category:Letter type:BYRON
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:BYRON"
The following 200 pages are in this category, out of 306 total.
(previous page) (next page)B
- BYRON 2002-0005, Revision 1 to Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits Reports
- BYRON 2002-0023, Revision 3 to Cycle 11A Core Operating Limits Report
- BYRON 2002-0033, Regulatory Commitment Change Summary Report
- BYRON 2002-0034, 2001 Annual Radioactive Effluent Release Report
- BYRON 2002-0035, Annual Environmental Operating Report
- BYRON 2002-0038, Notification of Modification Completion in Support of License Amendment to Revise Technical Specification Requirements Associated with the Boron Dilution Protection System
- BYRON 2002-0040, Occupational Radiation Exposure Report
- BYRON 2002-0050, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles.
- BYRON 2002-0051, Response to NRC Bulletin 2002-001, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.
- BYRON 2002-0053, 2001 Annual Radiological Environmental Operating Report
- BYRON 2002-0056, April 2002 Monthly Operating Report for Byron Station, Units 1 & 2
- BYRON 2002-0073, June 2002 Monthly Operating Report for Byron Units 1 & 2
- BYRON 2002-0074, Cycle 12 Core Operating Limits Report, Revision 2
- BYRON 2002-0075, Response to Request for Additional Information Regarding Inspection Plans for the Byron Station Unit 2 Reactor Vessel Head During the Fall 2003 Refueling Outage in Support of NRC Bulletin 2002-01
- BYRON 2002-0100, Cycle 11 Core Operating Limits Report
- BYRON 2002-0102, Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage
- BYRON 2002-0109, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles
- BYRON 2002-0110, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
- BYRON 2002-0111, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.
- BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual
- BYRON 2002-0129, Generator Inservice Inspection Summary Report
- BYRON 2002-0133, November 2002 Monthly Operating Report for Byron Station, Units 1 & 2
- BYRON 2002-0135, Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)
- BYRON 2002-5006, Steam Generator Tube Repairs Resulting from Cycle 11 Refueling Outage
- BYRON 2002-5008, Steam Generator Inservice Inspection Summary Report
- BYRON 2003-0017, January 2003 Monthly Operating Report for Byron Units 1 & 2
- BYRON 2003-0019, Annual Environmental Operating Report
- BYRON 2003-0023, February 2003 Monthly Operating Report for Byron Station, Units 1 & 2
- BYRON 2003-0025, Regulatory Commitment Change Summary Report
- BYRON 2003-0035, Occupational Radiation Exposure Report
- BYRON 2003-0036, Annual Radioactive Effluent Release Report
- BYRON 2003-0043, April 2003 Monthly Operating Report for Byron Station Units 1 & 2
- BYRON 2003-0064, Revision to Reactor Coolant System Pressure & Temperature Limits Report
- BYRON 2003-0070, July 2003 Monthly Operating Report for Byron Units 1 & 2
- BYRON 2003-0079, to Byron, Unit 1 Cycle 12, Core Operating Limits Report and Revision1 to Byron, Unit 2 Cycle 11, Core Operating Limits Report
- BYRON 2003-0093, Issuance of Core Operating Limits Report for Byron Unit One Cycle 13
- BYRON 2003-0110, October 2003 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.
- BYRON 2003-0115, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2003-0116, November 2003 Monthly Operating Report for Byron Station Units 1 and 2
- BYRON 2004-0002, December 2003 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)
- BYRON 2004-0017, January 2004 Monthly Operating Report for Byron Station Units 1 and 2
- BYRON 2004-0028, February 2004 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2004-0030, Annual Environmental Operating Report
- BYRON 2004-0033, Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination
- BYRON 2004-0035, Regulatory Commitment Change Summary Report
- BYRON 2004-0036, Issuance of Core Operating Limits Report, Cycle 12
- BYRON 2004-0037, March 2004 Monthly Operating Report for Byron Units 1 & 2
- BYRON 2004-0038, Steam Generator Tube Repairs Resulting from Byron, Unit 2, Cycle 11 Refueling Outage
- BYRON 2004-0043, 2003 Occupational Radiation Exposure Report
- BYRON 2004-0044, 2003 Annual Radiological Environmental Operating Report
- BYRON 2004-0045, 2003 Annual Radioactive Effluent Release Report
- BYRON 2004-0049, April 2004 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2004-0060, Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.
- BYRON 2004-0061, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- BYRON 2004-0069, Addendum to 2003 Annual Radiological Environmental Operating Report
- BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)
- BYRON 2004-0079, June 2004 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2004-0108, September 2004 Monthly Operating Report for Byron Station Units 1 and 2
- BYRON 2004-0113, Response to Request for Additional Information Regarding Spring 2004 Steam Generator Inspection
- BYRON 2004-0117, October 2004 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2004-0119, Report of Changes, Tests and Experiments
- BYRON 2004-0120, Issuance of Reactor Coolant System Pressure and Temperature Limits Reports
- BYRON 2004-0128, November 2004 Monthly Operating Report Byron Station Units 1 and 2
- BYRON 2004-0131, Notification of Deferral of a Generic Letter (GL) 89-13 Component Cooling Heat Exchanger Inspection
- BYRON 2005-0004, December 2004 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2005-0011, Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.
- BYRON 2005-0013, Control Room Envelope Unfiltered Air Inleakage Test Results in Response to Generic Letter 2003-01, Control Room Habitability.
- BYRON 2005-0016, January 2005 Monthly Operating Report for Byron Station Units 1 and 2
- BYRON 2005-0024, Unit 2, 2004 Annual Environmental Operating Report
- BYRON 2005-0030, February 2005 Monthly Operating Report for Byron Station Units 1 and 2
- BYRON 2005-0035, Regulatory Commitment Change Summary Report for 2004
- BYRON 2005-0036, Steam Generator Tube Repairs Completed During Refueling Outage 13
- BYRON 2005-0037, Cycle 14 Core Operating Limits Report
- BYRON 2005-0041, March 2005 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2005-0049, Annual Dose Report for 2004
- BYRON 2005-0050, Occupational Radiation Exposure Report
- BYRON 2005-0051, Annual Radiological Environmental Operating Report and Current Revision of the Offsite Dose Calculation Manual (ODCM)
- BYRON 2005-0052, Annual Radioactive Effluent Release Report and Addendum to 2003 Annual Radioactive Effluent Release Report
- BYRON 2005-0053, Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication.
- BYRON 2005-0054, Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.
- BYRON 2005-0063, April 2005 Monthly Operating Report for Byron Station, Units 1 and 2
- BYRON 2005-0071, Steam Generator Inservice Inspection Summary Report
- BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1
- BYRON 2005-0077, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2005-0112, Lnservice Inspection Program Relief Request 12R-52
- BYRON 2005-0119, Cycle 13 Core Operating Limits Report
- BYRON 2005-0121, Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage
- BYRON 2005-0125, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.
- BYRON 2005-0132, Inservice Inspection Program Relief Request I3R-01
- BYRON 2005-0135, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2005-0155, Requests for Relief from ASME OM Code for the Third Inservice Test Interval
- BYRON 2006-0011, Submittal of Knowledge and Abilities (K/A) Statements That Will Be Suppressed from the Random Exam Generation Process
- BYRON 2006-0013, Byron June 2006 Examination Outline Submittal
- BYRON 2006-0016, 2005 Regulatory Commitment Change Summary Report
- BYRON 2006-0018, Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure
- BYRON 2006-0022, Withdrawal of Inservice Inspection Program Relief Request 12R-52
- BYRON 2006-0023, Response to Request for Additional Information Regarding the Byron Station, Unit 1 Spring 2005 Steam Generator Inspection
- BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval
- BYRON 2006-0045, Annual Radioactive Effluent Release Report
- BYRON 2006-0047, Annual Dose Report for 2005
- BYRON 2006-0071, Transmittal of Inservice Testing Program Plan for the Third Ten Year Interval
- BYRON 2006-0083, Groundwater Protection - Data Collection Questionnaire
- BYRON 2006-0097, Response to NRC Request for Additional Information to Byron Station Relief Request I3R-08
- BYRON 2006-0100, Response to Request for Additional Information Regarding the Fall 2005 Steam Generator Inspection
- BYRON 2006-0108, Cycle 15 Core Operating Limits Report
- BYRON 2006-0116, Inservice Inspection Program Relief Request 13R-09 and 13R-10
- BYRON 2006-0119, Pressurizer Weld Overlay Examination Results Related to Relief Request I3R-08
- BYRON 2006-0135, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- BYRON 2007-0006, Inservice Inspection Program Second Interval Relief Requests I2R-21, I2R-22, I2R-23, I2R-25 and I2R-53
- BYRON 2007-0007, Response to Request for Additional Information Regarding the Byron Station, Unit 2 Fall 2005 Steam Generator Inspection
- BYRON 2007-0010, Day Inservice Inspection Report for Interval 3, Period 1, Outage 1 (B1R14)
- BYRON 2007-0014, Cycle 15 Core Operating Limits Report, Revision 4
- BYRON 2007-0050, Cycle 14 Core Operating Limits Report
- BYRON 2007-0051, Reactor Coolant System (RCS) Pressure and Temperature Limits Reports (PTLR)
- BYRON 2007-0052, Annual Radioactive Effluent Release Report
- BYRON 2007-0054, Annual Dose Report for 2006
- BYRON 2007-0056, Steam Generator Inservice Inspection Summary Report for Refueling Outage 13
- BYRON 2007-0059, Pressurizer Weld Overlay Examination Results Related to Byron Station Relief Request 13R-08
- BYRON 2007-0067, Closeout of Confirmatory Action Letter Requirements
- BYRON 2007-0068, Bryon Station, Unit 2, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.
- BYRON 2007-0075, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactors Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2008-0018, Change to Operator Licensing Examination 2010 Dates
- BYRON 2008-0031, Cycle 16 Core Operating Limits Report
- BYRON 2008-0032, Transmittal of 2007 Annual Radioactive Effluent Release Report & Rev. 5 to Offsite Dose Calculation Manual
- BYRON 2008-0045, Response to Notice of Violation EA-08-046
- BYRON 2008-0046, Annual Radiological Environmental Operating Report (AREOR)
- BYRON 2008-0051, Sixty-Day Response to NRC Order EA-03-009, First Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2008-0054, Response to NRC Request Concerning Unresolved Item 05000454/2008008 and 05000455/2008008
- BYRON 2008-0055, Submittal of 2008 Byron Initial License Examination Post-Examination Comments
- BYRON 2008-0063, Steam Generator Inservice Inspection Summary Report for Refueling Outage 15
- BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)
- BYRON 2008-0108, Cycle 15 Core Operating Limits Report
- BYRON 2008-0119, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
- BYRON 2009-0003, Steam Generator Inservice Inspection Summary Report for Refueling Outage 14
- BYRON 2009-0011, 90-Day Notification Prior to First Storage of Spent Fuel
- BYRON 2009-0012, Submittal of 2008 Annual Radioactive Effluent Release Report
- BYRON 2009-0014, Annual Radiological Environmental Operating Report (AREOR)
- BYRON 2009-0025, Updated Information to Response to NRC Request Concerning Unresolved Item 05000454-08-008 and 05000455-08-008
- BYRON 2009-0029, Change to Operator Licensing Examination 2011 Dates
- BYRON 2009-0033, Unit 2, Response to NRC Annual Assessment Letter
- BYRON 2009-0041, 2008 Regulatory Commitment Change Summary Report
- BYRON 2009-0048, Submittal of Annual Dose Report for 2008
- BYRON 2009-0054, Independent Spent Fuel Storage Installation - Notification of Full Compliance to NRC Security Order EA-08-069 Requirements
- BYRON 2009-0092, Affirmation of 10 CFR 26, Subpart I, Implementation Prior to October 1, 2009
- BYRON 2009-0098, Affirmation of 10 CFR 26, Subpart I, Implementation Prior to October 1, 2009
- BYRON 2009-0107, Cycle 17 Core Operating Limits Report
- BYRON 2010-0003, Change to Operator Licensing Examination 2011 Dates
- BYRON 2010-0017, Regulatory Commitment Change Summary Report
- BYRON 2010-0029, Annual Radioactive Effluent Release Report
- BYRON 2010-0034, Annual Dose Report for 2009
- BYRON 2010-0040, Cycle 16 Core Operating Limits Report
- BYRON 2010-0041, Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15
- BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)
- BYRON 2011-0018, Regulatory Commitment Change Summary Report
- BYRON 2011-0037, Change to Operator Licensing Examination 2012 Dates
- BYRON 2011-0038, Letter Documenting Intent Not to Appeal the Proposed Self-Revealing White Finding
- BYRON 2011-0059, Submittal of Cycle 18 Core Operating Limits Report, Revision 7
- BYRON 2011-0067, 2010 Annual Radioactive Effluent Release Report
- BYRON 2011-0070, Annual Dose Report for 2010
- BYRON 2011-0071, Annual Radiological Environmental Operating Report (AREOR)
- BYRON 2011-0093, Inservice Inspection Summary Report for Refueling Outage 17
- BYRON 2011-0102, Notification of Readiness for 95001 Supplemental Inspection August 22-26, 2011
- BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)
- BYRON 2011-0136, Changes to Operator Licensing Examination 2014 and 2016 Dates
- BYRON 2011-0139, Cycle 17 Core Operating Limits Report
- BYRON 2011-0156, 2012 Byron Station Initial License Examination Proposed Exam Files
- BYRON 2012-0001, Steam Generator Inservice Inspection Summary Report for Refueling Outage 16
- BYRON 2012-0030, 2011 Regulatory Commitment Change Summary Report
- BYRON 2012-0051, Annual Dose Report for 2011
- BYRON 2012-0104, Cycle 19 Core Operating Limits Report
- BYRON 2012-0119, Response to NRC Request for Additional Information Involving Site Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
- BYRON 2012-0125, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- BYRON 2012-0128, Stations, Units 1 & 2, Change Request to NRC On-site Validation Week for 2013 NRC Initial License Operating Exam
- BYRON 2013-0012, 2012 Regulatory Commitment Change Summary Report
- BYRON 2013-0046, Annual Dose Report for 2012
- BYRON 2013-0051, Cycle 18 Core Operating Limits Report
- BYRON 2013-0054, Submittal of 2012 Annual Radioactive Effluent Release Report
- BYRON 2013-0058, Annual Radiological Environmental Operating Report (AREOR) - Cover Letter
- BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)
- BYRON 2013-0141, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- BYRON 2014-0002, Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Report for Measurement Uncertainty Recapture (Mur) Power Uprate
- BYRON 2014-0003, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (Mur) Power Uprate
- BYRON 2014-0014, Regulatory Commitment Change Summary Report
- BYRON 2014-0030, 2014 Byron Initial License Exam; Letter 2014-0030
- BYRON 2014-0030, Byron Station, Units 1 and 2 - Submittal of Initial Operator Licensing Examination Outline
- BYRON 2014-0034, Cycle 20 Core Operating Limits Report
- BYRON 2014-0040, Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill
- BYRON 2014-0043, Annual Dose Report for 2013
- BYRON 2014-0051, Annual Radioactive Effluent Release Report
- BYRON 2014-0057, Startup Test Report for the Measurement Uncertainty Recapture (Mur) Power Uprate
- BYRON 2014-0058, 2013 Annual Radiological Environmental Operating Report (AREOR)
- BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)
- BYRON 2014-0083, National Pollutant Discharge Elimination System (NPDES) Permit No. lL0048313
- BYRON 2014-0139, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report
- BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)
- BYRON 2015-0013, Steam Generator Tube Inspection Report for Refueling Outage 18
- BYRON 2015-0026, Response to Request for Additional Information Regarding Pressure and Temperature Limits Reports
- BYRON 2015-0029, 2014 Regulatory Commitment Change Summary Report