RNP-RA/02-0052, Transmittal of Emergency Procedure Revisions
ML021070440 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 04/15/2002 |
From: | Fletcher B Carolina Power & Light Co |
To: | Document Control Desk, Office of Nuclear Security and Incident Response |
References | |
RNP-RA/02-0052 | |
Download: ML021070440 (138) | |
Text
{{#Wiki_filter:10 CFR 50, Appendix E 2CP&LA Progress Energy Company Serial: RNP-RA/02-0052 APR 1 5 ZOOZ United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 TRANSMITTAL OF EMERGENCY PROCEDURE REVISIONS Ladies and Gentlemen: In accordance with 10 CFR 50.4(b)(5) and Appendix E to 10 CFR 50, Carolina Power & Light (CP&L) Company is transmitting revisions to the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Emergency Implementing Procedures. A list of the procedure revisions and the effective dates is provided in Attachment I. Descriptions of the procedure changes are provided on the "Summary of Changes" page for each emergency procedure. Please replace the superseded procedures with the attached revisions. If you have any questions concerning this matter, please contact Mr. C. T. Baucom. Sincerely, B. L. Fletcher III Manager - Regulatory Affairs Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550
U. S. Nuclear Regulatory Commission Serial: RNP-RA/02-0052 Page 2 of 2 CAC/cac Attachments: I. List of Procedure Revisions and Effective Dates II. EPJIC-02, "Joint Information Center Director" III. EPNOT-03, "EOF Public Information Emergency Communicator" IV. EPOSC-01, "Operational Support Center Leader" V. EPOSC-03, "Environmental and Radiation Control Team" VI. EPRAD-03, "Dose Projections" c: L. A. Reyes, NRC, Region II (2 copies) NRC Resident Inspector, LBRSEP R. Subbaratnam, NRC, NRR (w/o Attachments)
United States Nuclear Regulatory Commission Attachment I to Serial RNP-RA/02-0052 Page 1 of 1 List of Procedure Revisions and Effective Dates Procedure Revision Effective No. Date EPJIC-02, "Joint Information Center Director" 6 03/15/02 EPNOT-03, "EOF Public Information Emergency Communicator" 5 03/15/02 EPOSC-01, "Operational Support Center Leader" 7 03/25/02 EPOSC-03, "Environmental and Radiation Control Team" 5 03/25/02 EPRAD-03, "Dose Projections" 11 03/20/02
United States Nuclear Regulatory Commission I to Serial RNP-RA/02-0052 10 Pages EPJIC-01 JOINT INFORMATION CENTER DIRECTOR Revision 6
R CP&L Reference Use CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PLANT OPERATING MANUAL VOLUME 2 PART 5 EMERGENCY PROCEDURE EPJIC-02 JOINT INFORMATION CENTER DIRECTOR REVISION 6 I EPJIC-02 Rev. 6 Page 2-1 of 2-9 1
SUMMARY
OF CHANGES STEP # REVISION COMMENTS 8.2.3.3b Added a note following Step 8.2.3.3b that describes the Attachment 8.2.5.1 for coordination/processing of press releases. 8.2.3.3c Clarified note following Step 8.2.3.3c to indicate that guidelines for sharing the e-mail files via computer are available for review in the Emergency Press Release Folder on Public Folders. 8.2.3.5d Deleted Step 8.2.3.5d and associated note. The approved press release is available for review/distribution by Corporate Communications once it is placed in the public folders. Attachment Added flowchart attachment for press release processing. 8.2.5.1 I EPJIC-02 Rev. 6 -Page 2-2 of 2-9
TABLE OF CONTENTS SECTION PAGE Q UICK START GUIDE ................................................................................................. 2-4 8.2.1 PURPOSE .............................................................................................. 2-5 8.2.2 RESPONSIBILITIES ............................................................................... 2-5 8.2.3 INSTRUCTIO NS ..................................................................................... 2-5 8.2.4 RECORDS .............................................................................................. 2-8 8.2.5 ATTACHM ENTS ..................................................................................... 2-8 8.2.5.1 Press Release Flow Chart ...................................................................... 2-9 IEPJIC-02 I Rev. 6 Page 2-3 of 2-91
JOINT INFORMATION CENTER (JIC) DIRECTOR QUICK START GUIDE NOTE: Blanks are provided for place keeping V's only, logs are the official record. This is a summary level guide and does not replace the procedure steps.
- 1. Sign in on the JIC Organization Board, sign-in log, and obtain position badge.
- 2. If Dialogic is utilized for callout, upon your arrival at the JIC, contact Dialogic at (9-857-1777).
- 3. Initiate documentation of activities in the electronic log or in the logbook.
- 4. Contact the Public Information Emergency Communicator at 5002 to receive plant status briefing from the EOF.
- Obtain copies of press releases that have been issued from the EOF.
- 5. Verify interface between JIC and Emergency Operations Facility (EOF) computers are working properly. If required, utilize back-up fax capability.
- Log in to the Local Area Network (LAN) using your log in name AND password.
- 6. Delegate Administrative/Badging Staff responsibilities/tasks per EPJIC-05, if necessary, until the arrival of the Administrative/Badging Staff.
- 7. Coordinate JIC staffing requests and establish JIC relief shift plans with the Administrative & Logistics Manager in the EOF.
- 8. Assign available Administrative/Badging personnel to fill positions as needed.
- 9. Direct the Administrative Assistant to fill other JIC Emergency Response Organization (ERO) positions as necessary.
- 10. Establish interface with offsite agencies at the JIC.
- 11. Notify the Company Spokesperson as to readiness to activate.
- 12. Refer to procedure steps.
I EPJIC-02 Rev. 6 Page 2-4 of 2-9
8.2 JOINT INFORMATION CENTER (JIC) DIRECTOR 8.2.1 PURPOSE
- 1. This procedure describes the functional responsibilities and procedure steps for the Joint Information Center (JIC) Director AFTER the JIC is activated.
8.2.2 RESPONSIBILITIES
- 1. Prepare non-technical press releases for issuance.
- 2. Receive, coordinate, ensure approval and issuance of press releases from the Emergency Operations Facility (EOF).
- 3. Assume duties of the Company Spokesperson, if required.
8.2.3 INSTRUCTIONS NOTE: Non-technical press releases containing only information regarding JIC activation, media/public inquiry telephone numbers, or press conference times do not require the Emergency Response Manager (ERM) approval.
- 1. Prepare the initial non-technical press release announcing JIC activation, media/public inquiry telephone numbers for the JIC, and the time of the initial press conference,(if available).
- a. Obtain approval from the Company Spokesperson.
- b. Inform the Public Information Emergency Communicator (PIEC) in the EOF when press releases are issued.
- 2. Notify the Customer Service Center (CSC) at 1 (800) 452-2777 or the Distribution Control Center at (919) 747-5714 upon activation of the JIC.
- a. Provide the number for rumor control (843) 679-2562, such that future calls may be appropriately directed.
EPJIC-02 I Rev. 6 Page 2-5 of 2-9
8.2.3 INSTRUCTIONS (Continued) NOTE: Technical press releases require approval by the Emergency Response Manager. Technical revisions to approved press releases require an additional approval by the ERM. Non-technical revisions do not require additional approval by the ERM.
- 3. Coordinate timely preparation of technical press releases with the EOF.
- a. Following the activation of the JIC, press releases should be available for issue to the news media following:
- A change in emergency classification, or - A radiological release as a result of the emergency, or - Other significant events provided to the offsite agencies via an Emergency Notification Form.
- b. Obtain press release numbers from the Public Information Emergency Communicator (PIEC) to prevent duplicate press release numbers.
NOTE: Attachment 8.2.5.1, Press Release Flowchart, describes the process for coordination of press release initiation, approval, and distribution.
- c. Ensure that press releases for review are maintained in the Draft Press Releases Public Folder.
Hard copies for approval should be controlled by marking them "draft" either by word processing or pen and ink. NOTE: General information for sharing the press releases via computer is included in the Emergency Press Release Folder.
- 4. Verify with the EOF through the PIEC that the NRC Director of Site Operations, if staffed, has reviewed copies of the CP&L press releases. The PIEC shall obtain this review prior to transmission to the JIC.
EPJIC-02 Rev. 6 Page 2-6 of 2-9
8.2.3 INSTRUCTIONS (Continued)
- 5. Coordinate timely JIC review of press releases with the Company Spokesperson.
- a. Inform the PIEC of non-technical revisions.
- b. Ensure that approved press releases are marked with an issuance time.
- c. Place approved press releases in the Approved Press Releases Public Folder.
- 6. Coordinate the issuance of CP&L press releases with the distribution of press releases from offsite agencies who are present at the JIC.
- 7. Direct the Administrative Staff to issue press releases to the designated locations per EPJIC-05, Attachment 8.5.5.4, Press Release Distribution Log.
- a. Ensure the NRC Emergency Communicator is notified of the issuance of each press release so that he may complete the required NRC notifications.
- 8. Provide significant plant status changes as they occur discreetly to the Company Spokesperson during press conferences (e.g., via hand carried note).
- 9. Ensure Corporate Communications is up-to-date on plant status and continue updates throughout the emergency.
I EPJIC-02 Rev. 6 Page 2-7 of 2-9 1
8.2.3 INSTRUCTIONS (Continued)
- 10. Ensure State/County and Federal agency public information officers are updated on the plant status. Agencies not currently located in the JIC should be notified via telephone until their arrival at the JIC.
Refer to the ERO Telephone Directory for telephone numbers. Request Corporate Communications personnel assistance if needed.
- 11. Deactivate the JIC as directed.
Ensure equipment and supplies are returned to the appropriate storage locations, as applicable. Ensure that Corporate Communications and State/County and Federal agencies (not located in the JIC) are notified of the deactivation.
- 12. Ensure all documentation generated during the emergency or drill/exercise is forwarded to the Emergency Preparedness Staff.
8.2.4 RECORDS N/A 8.2.5 ATTACHMENTS 8.2.5.1 Press Release Flow Chart EPJIC-02 Rev. 6 Page 2-8 of 2-9
Attachment 8.2.5.1 Page 1 of 1 Press Release Flow Chart NO YES (fo JIC Director > Provides Copies to Administrative Staff for Distribution and Notifies Corporate
*Communications j IEPJIC-02 I Rev.6 Page2-of21
United States Nuclear Regulatory Commission Attachment I1 to Serial RNP-RA/02-0052 9 Pages EPNOT-03 EOF PUBLIC INFORMATION EMERGENCY COMMUNICATOR Revision 5
R CP&L Reference Use CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PLANT OPERATING MANUAL VOLUME 2 PART 5 EMERGENCY PROCEDURE EPNOT-03 EOF PUBLIC INFORMATION EMERGENCY COMMUNICATOR REVISION 5 IEPNOT-03 Rev. 5 Page3-1 of3-8
SUMMARY
OF CHANGES STEP # REVISION COMMENTS 8.3.3.3 Added note following Step 8.3.3.3 that describes Attachment 8.3.5.1 for coordination/processing of press releases. Attachment Added flowchart attachment for press release processing 8.3.5.1 I EPNOT-03 I Rev. 5 Page 3-2 of38
TABLE OF CONTENTS SECTION PAGE Q UICK START G UIDE ................................................................................................. 3-4 8.3.1 PURPOSE ........................................................................................... 3-5 8.3.2 RESPONSIBILITIES ............................................................................... 3-5 8.3.3 INSTRUCTIONS ..................................................................................... 3-5 8.3.4 RECO RDS .............................................................................................. 3-7 8.3.5 ATTACHM ENTS ..................................................................................... 3-7 8.3.5.1 Press Release Flow Chart ......................................................................... 3-8 I EPNOT-03 Rev. 5 Page 3-3 of38
PUBLIC INFORMATION EMERGENCY COMMUNICATOR QUICK START GUIDE NOTE: Blanks are provided for place keeping 4/'s only, logs are the official record. This is a summary level guide and does not replace the procedure steps.
- 1. Check equipment status.
- 2. Log on to the LAN network and access the news release folders.
- 3. Review previous emergency notifications and NRC notifications.
- 4. Notify EOF Emergency Communicator when ready to assume duties.
- 5. Refer to procedure.
EPNOT-03 Rev. 5 Page 3-4 of 3-8]
8.3.1 PURPOSE
- 1. To provide instructions for notifications by the Public Information Emergency Communicator to the Joint Information Center (JIC).
8.3.2 RESPONSIBILITIES
- 1. Formulate press releases and obtain approval from the Emergency Response Manager (ERM).
- 2. Accurately transmit information to the Joint Information Center.
8.3.3 INSTRUCTIONS
- 1. Review previous Emergency Notification Forms and any press releases.
- 2. Notify the EOF Emergency Communicator when you are ready to assume position duties.
- 3. Establish contact with the Joint Information Center Director when the facility is being manned for activation and establish that the PI EC will control press release numbering.
NOTE: Attachment 8.3.5.1, Press Release Flowchart, describes the process for coordination of press release initiation, approval, and distribution.
- 4. Transmit copies of Emergency Notification Forms and requested plant information if not available to the JIC Staff on the Electronic Display System (EDS).
- a. Hard copies of Emergency Notification Forms for faxing may be obtained from the Emergency Communications Staff.
- 5. Following the activation of the EOF, releases should be available to the media following:
- A change in emergency classification, or - A radiological release as a result of the emergency, or - Other significant events provided to the offsite agencies via an Emergency Notification Form.
EPNOT-03 Rev. 5 Page 3-5 of 3-8]
8.3.3 (Continued)
- 6. Example press releases (read only format) for use as templates are available in the Emergency Press Release Public Folder.
- 7. Completed draft press releases should be placed in the Draft Press Releases Public Folder.
- a. Hard copies printed for approval should be controlled by marking them "draft" either by word processing or pen and ink.
- 8. Obtain approvals for press releases.
- a. The Emergency Response Manager (ERM) must approve the technical content of press releases.
- b. Any changes of technical content, after initial approval must be approved by the ERM.
- c. The Company Spokesperson should approve non-technical content of the press release.
Prior to JIC activation, non-technical content of press releases should be approved by Site Communications or Corporate Communications personnel time permitting.
- d. Press releases which are entirely non-technical may be formulated by JIC staff and approved by the Company Spokesperson.
These include facility activation and press briefing times.
- 9. Press releases which must be faxed to the JIC for approval should be clearly marked "DRAFT" in the time slot of the release.
EPNOT-03 Rev. 5 Page 3-6 of 3-8
8.3.3 (Continued)
- 10. Coordinate with JIC Director to ensure approved press releases are placed in the Approved Press Releases Public Folder.
- 11. Obtain responses for questions from JIC staff.
- a. Keep the EOF Emergency Communicator informed of issues associated with media questions.
- 12. Upon event or drill termination, ensure JIC personnel are informed.
8.3.4 RECORDS N/A 8.3.5 ATTACHMENTS 8.3.5.1 Press Release Flow Chart IEPNOT-03 Rev. 5 Page 37of 38
Attachment 8.3.5.1 Page 1 of 1 Press Release Flow Chart NO YES (* JIC Director -N Provides Copies to Administrative Staff for Distribution and Notifies Corporate SCommunications } EPNOT-03 Rev. 5 Page 3-8 of 3-8
United States Nuclear Regulatory Commission Attachment IV to Serial RNP-RA/02-0052 29 Pages EPOSC-01 OPERATIONAL SUPPORT CENTER LEADER Revision 7
R CP&L Reference Use CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PLANT OPERATING MANUAL VOLUME 2 PART 5 EMERGENCY PROCEDURE EPOSC-01 OPERATIONAL SUPPORTCENTER LEADER REVISION 7 I EPOSo-Ol Rev. 7 Page 1-1 of 1-28
SUMMARY
OF CHANGES STEP REASON FOR REVISION 8.1.3.3.b Added step to ensure E&RC activities are briefed per EPOSC-03. Added additional guidance to allow verbal dispatch in the event of a medical emergency. 8.1.3.3.f Added guidance for consulting the site safety representative and securing ventilation, if necessary, to the facility in the event of a chemical or toxic hazard. (AR #28241) I EPOSC-01 Rev. 7 Page 12of 28
TABLE OF CONTENTS SECTION PAGE Q UICK STA RT G UIDE ................................................................................................. 1-4 8.1.1 PURPO SE .............................................................................................. 1-5 8.1.2 RESPO NSIBILITIES ............................................................................... 1-5 8.1.3 INSTRUCTIO NS ..................................................................................... 1-5 8.1.4 RECO RDS ............................................................................................ 1-11 8.1.5 ATTAC HM ENTS ................................................................................... 1-11 8.1.5.1 OSC Activation/Layout ............................................................... 1-12 8.1.5.2 O SC Personnel Log ................................................................... 1-14 8.1.5.3 OSC O rganization ...................................................................... 1-15 8.1.5.4 O SC Leader's Checklist ............................................................. 1-16 8.1.5.5 O SC Evacuation and Backup O SC Setup .................................. 1-18 8.1.5.6 O SC Leader Adm inistrative Assistant Checklist ......................... 1-19 8.1.5.7 Storekeeper Checklist ................................................................ 1-20 8.1.5.8 Tag/Board Position Task List ..................................................... 1-21 8.1.5.9 O SC Personnel Roster ............................................................... 1-28 I EPOSC-01 Rev. 7 Page 1-3 of 1-28 1
OSC LEADER QUICK START GUIDE NOTE: Blanks are provided for place keeping V's only, logs are the official record. This is a summary level guide and does not replace the procedure steps.
- 1. If Dialogic was used for callout, upon arrival at the Facility, notify Dialogic at X 1777.
- 2. Announce your presence and position in the Operational Support Center (OSC).
- 3. Establish communications.
- 4. Set up the OSC per Attachment 8.1.5.1, OSC Activation/Layout.
- 5. Initiate accountability.
- 6. Ensure that the Security Watchperson maintains access co ntrol.
- 7. Ensure that the facility is being monitored for radiation habitability.
- 8. Instruct personnel to obtain their equipment and prepare for missions.
- 9. Synchronize clocks with ERFIS/EDS.
- 10. Conduct initial status briefing.
- 11. Notify the Site Emergency Coordinator (SEC) of readiness to activate the OSC.
- 12. Refer to procedure steps.
EPOSC-01 Rev. 7 Page 1-4 of 1-28]
8.1 OPERATIONS SUPPORT CENTER LEADER 8.1.1 PURPOSE
- 1. The purpose of this procedure is to describe the duties and responsibilities of the Operational Support Center (OSC) Leader.
Attachments to this procedure describe the organization, activation, and operation of the OSC. 8.1.2 RESPONSIBILITIES NOTE: In order to augment the staff of the Control Room as soon as practical, activation of the OSC is permitted with partial staffing.
- 1. The OSC Leader is responsible to the Emergency Repair Director (ERD) when the Technical Support Center (TSC) is activated. The OSC Leader is responsible to the Control Room Site Emergency Coordinator (SEC) prior to the activation of the TSC. General responsibilities include:
- a. Activation of the OSC is required at Alert or higher emergency classification or at a lower level if directed by the SEC.
- b. Coordinating the activities of the OSC and supporting its assigned personnel.
8.1.3 INSTRUCTIONS NOTE: Initial actions of this procedure can be implemented by the Damage Control Team Leader (DCTL) in the absence of the OSC Team Leader.
- 1. The OSC staff will be called out if required at an Alert or higher emergency classification.
- a. Activation at a lower level may be directed by the SEC.
EPOSC-01 Rev. 7 Page 1-5 of 1-28
8.1.3 (Continued)
- 2. Upon reporting to the OSC, the OSC Leader shall:
- a. Establish communications with the Control Room or the Emergency Repair Director (ERD) if the TSC is activated, giving the status of OSC augmentation.
- Use the OSC Tag Board for tracking. - Request plant status and any repair missions underway or needed.
- b. Announce his name and position title.
- c. He shall then order all non-emergency response personnel be moved from the main working areas of the OSC.
- See Attachment 8.1.5.1, OSC Activation/Layout, to ensure that only emergency response personnel are located in the main OSC working areas. - This practice may be modified for drill purposes.
- d. Ensure accountability initiated, call Emergency Security Team Leader (ESTL) when complete.
- Assign the Security Watchperson to establish OSC access control.
See Attachment 8.1.5.1, OSC Activation/Layout, for location of the OSC access control desk. The Security Watchperson will maintain Attachment 8.1.5.2, OSC Personnel Log. A radiological control point may be set up at this location if the OSC leader deems it appropriate. Supplies and equipment for this purpose are located in the OSC Command Center desk and file drawers. I EPOSC-01 Rev. 7 Page 1-6 of 1-28
8.1.3.2 (Continued) NOTE: The Tag Board describes the recommended OSC staff. Other personnel may be assigned to the facility as needed. Not all personnel assigned to the OSC are required to have a tag. If the emergency can be handled with less than the recommended staff, the OSC can be activated.
- e. Use Attachment 8.1.5.8, Tag Board/Position Task List, and the Tag Board located at the OSC entrance and Attachment 8.1.5.9, OSC Personnel Roster, to ensure that the OSC organization is properly staffed.
Attachment 8.1.5.3, OSC Organization, describes the normal staffing.
- f. Place all phones, radios, and status boards according to Attachment 8.1.5.1, OSC Activation/Layout.
Communication lines should be checked with the TSC and the Control Room. Communications information is contained in EPNOT-00, Notification and Emergency Communicators, and the ERO Phone Book.
- g. Determine the need for additional equipment, supplies, and manpower.
- Requests should be made through the ERD to the ALM.
- h. Upon reaching an adequate staffing level, the OSC Leader (or in his absence, the DCTL) shall declare the facility activated.
This must be done by an announcement in the facility and by a call to the ERD. A final personnel accountability check will be made and the ESTL shall be informed of the result. I EPOSC-01 Rev. 7 1 Page 1-7 of 1-28
8.1.3.2 (Continued)
- i. Obtain an initial briefing on plant status and emergency operations from the Control Room or ERD, if the TSC has been activated.
- Conduct a detailed briefing for all OSC personnel.
- 3. The OSC Leader will control, direct, and support assigned personnel as follows:
- a. Upon notification of a mission from the ERD, ensure that the personnel and resources necessary for the mission are available.
Whenever it is determined that an OSC mission is not practical or feasible during the course of a declared emergency, advise the ERD for appropriate action.
- b. Ensure that briefings are conducted for E&RC activities dispatched from the OSC per EPOSC-03, Attachment 8.3.5.2, E&RC Activities Briefing Sheet. (AR #47564, AR
#43529) - If a medical emergency exists, verbal authorization may be given for team dispatch as long as the information is documented in the OSC Team Leader log.
- c. Conduct frequent status update briefings with OSC staff personnel.
- d. Keep the ERD informed of the status of missions/teams.
- e. The OSC Leader shall direct the E&RC personnel to establish and monitor habitability in the OSC.
EPOSC-01 Rev. 7 Page 1-8 of 1-28]
8.1.3.3 (Continued)
- f. Consult the Site Industrial Safety Representative/designee for appropriate protective actions in the event of a chemical/toxic hazard.
- If deemed necessary, take steps to secure ventilation.
(AR #28241)
- g. Ensure the following positions are functioning as follows:
- The OSC Leader Administrative Assistant shall perform duties specified in Attachment 8.1.5.6, OSC Leader Administrative Assistant Checklist.
The OSC Storekeeper will perform duties to ensure that OSC personnel have access to tools and spare parts according to Attachment 8.1.5.7, Storekeeper Checklist. The Facility Administrative assistant will perform miscellaneous administrative duties as directed by the OSC Leader. The Security Watchperson will assist with OSC accountability, perform duties to ensure that OSC personnel have appropriate access to plant areas, and maintain access control for the facility. DCTL operations shall be conducted according to EPOSC-02, Damage Control Team Leader. If available, an E&RC Supervisor shall direct the Plant Monitoring Teams, Personnel Protection Teams, Decontamination Teams, and Chemistry Teams in accordance with EPOSC-03, Environmental & Radiation Control Team. The E&RC Supervisor may interface directly with the Radiological Control Director in the TSC for communication of E&RC data. EPOSC-01 Rev. 7 Page 1-9 of 1-28
8.1.3.3.g (Continued) If an E&RC Supervisor is not available in the RC Technician staff, the OSC Leader shall direct Plant Monitoring, Personnel Protection, Decontamination, and Chemistry Teams in accordance with EPOSC-03, Environmental & Radiation Control Team. A "lead" may be assigned from available RC Technician staff for this function.
- 4. IF adverse environmental conditions dictate, move the OSC in accordance with Attachment 8.1.5.5, OSC Evacuation and Backup OSC Setup.
- a. Consider evacuation if the actual or anticipated total accumulated dose exceeds 1000 mR.
- b. The decision to evacuate the OSC will be done in conjunction with the ERD and the Radiological Control Director (RCD) in the TSC or the SEC.
- The SEC will approve relocation of the OSC.
- c. For plant data:
Locate the nearest personal computer connected to the site Local Area Network (LAN) and utilize the group available in the Plant View option under the Robinson menu selection. (Choose "File" then "Group" in Plant View). Contact ITSD staff to connect an available computer to the modem connection provided.
- 5. Ensure proper use of communications equipment. Identify yourself by name and the position you hold at the beginning of each transmission.
- 6. Upon instructions from the ERD or SEC, the OSC Leader shall deactivate the facility by appropriately notifying all OSC personnel and assuring that all equipment and supplies are returned to the appropriate storage location. Review OSC Leader Log for completeness and accuracy.
I EPOSC-01 Rev.7 1 Page 1-10 of 1-281
8.1.4 RECORDS N/A 8.1.5 ATTACHMENTS 8.1.5.1 OSC Activation/Layout 8.1.5.2 OSC Personnel Log 8.1.5.3 OSC Organization 8.1.5.4 OSC Leader's Checklist 8.1.5.5 OSC Evacuation and Backup OSC Setup 8.1.5.6 OSC Leader Administrative Assistant Checklist 8.1.5.7 Storekeeper Checklist 8.1.5.8 Tag Board/Position Task List 8.1.5.9 OSC Personnel Roster I EPOSC-01 Rev. 7 Page 1-11 of 1-28
ATTACHMENT 8.1.5.1 Page 1 of 2 OSC ACTIVATION/LAYOUT Upon reaching requirement for OSC activation, the following should be performed:
- Set up equipment per Attachment 8.1.5.1, OSC Activation/Layout, Page 2 of 2: - OSC Tag Board - OSC Status Board - Plant Diagram Chart - Rearrange tables in Maintenance conference room and break room for OSC use - Table for Access Control - Telephones (plug into appropriately marked jack for that OSC position). - Fax Machine (to be moved from Maintenance first floor library) - Emergency Status and OSC Habitability signs - Office supplies and Materials for all positions
- Establish access control as follows:
- Place No Exit/Entry signs/barriers at boundary doors and access (doors may be Locked to Prevent entry). - Turn elevator key to stop position with elevator on first floor and door open. - All OSC personnel sign in on Attachment 8.1.5.2, OSC Personnel Log. - Have all non-emergency response personnel leave OSC. - All personnel entering or exiting sign in on Attachment 8.1.5.2, OSC Personnel Log, (include destination in space provided when exiting). - Do not permit non-emergency response personnel entry into the OSC unless authorized by OSC Leader.
Telephones and supplies are located in the OSC Command Center desk drawers and file cabinet. Setup equipment is also stored in the breakroom closet near vending machines. H.P. Equipment is in H.P. cabinets located in break room as well as in closet next to first floor restrooms. The OSC Leader will ensure setup. All OSC personnel should be responsible to set up of their own assigned areas with the assistance of other responding OSC personnel. EPOSC0-1O Rev. 7 Page 1-12 of 1-28]
ATTACHMENT 8.1.5.1 Page 2 of 2 OSC ACTIVATION/LAYOUT O&M BUILDING 1st FLOOR SUGGESTED LAYOUT FOR OSC 1 194 t-25] 24
- 1. OSC Leader (5034) 18. FAX Machine
- 2. OSC Leader Admin Assistant (5026) 19. RC Table
- 3. E&RC Leader (5027) 20. Chemistry/E&C Supervisor Table (5033)
- 5. OSC Status Board 23. RWP Area
- 6. Damage Control Team Leader (5015) 24. Dosimetry Table
- 7. Mechanical Supervisor (5018) 25. OSC Equipment Storage
- 8. I&C/Elecbical Supervisor (5019) 26. Access to 2' Floor via Stairwell (South Door)
- 9. RC Supervisor (5020)" 27. Storekeeper Area
- 10. ALARA Supervisor (5023) 28. DCT StagingWafting Area
- 11. Brlelkg Area febrlfing 30. OSC Entrance/Exdt
- 12. Security Walchperson 31. HP Storage
- 13. Mechanical Planner (5013) 32. Barrier for Access to 2d Floor During Drill/
- 14. l&C/Eectlca Planner (5013) Exercise
- 15. Plant Dlagran Board 33. I&C Electrical StagingANaiting Area
- 16. HP Lockers "9&10 may be same person.
EPOSo-01 Rev. 7 I Page 1-13 of 1-28]
ATTACHMENT 8.1.5.2 Page 1 of 1 OSC PERSONNEL LOG SHEET# Date
# NAME (Please Print) OSC TIME
- LOG OUT POSITION DESTINATION IN OUT 1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 I EPOSC-01 Rev. 7 Page 1-14 of 1-28]
ATTACHMENT 8.1.5.3 Page 1 of 1 OSC ORGANIZATION EPOSC-01 Rev. 7 Page 1-15 of 1-28
ATTACHMENT 8.1.5.4 Page 1 of 2 OSC LEADER'S CHECKLIST ACTIVATION
- Upon your arrival, announce your presence in the OSC and establish communications with the Control Room, or the ERD if the TSC has been activated giving status of augmentation and requesting missions information. - The OSC Leader or in his absence, the Damage Control Leader shall declare the facility activated upon reaching an adequate staffing level. - Order the immediate removal of all non-response personnel from the OSC main working areas. - Set up the OSC similar to Attachment 8.1.5.1, OSC Activetion/Layout Diagram. The OSC boundaries may be modified to better facilitate OSC operations at the discretion of the OSC Leader. - Set up telephones (phones are located in the OSC Command Center file drawers),
placing them according to the marked numbers on the OSC Layout Diagram (phone jacks on walls are also marked).
- Ensure accountability is initiated, call Security Team Leader when complete.
Ensure that the Security Watchperson maintains access control and the Personnel Log.
- Ensure that the facility is adequately staffed for the emergency at hand, (refer to the Tag Board). - Ensure that the facility is being monitored for radiological habitability. - Make requests for additional personnel and equipment as the situation dictates. - Obtain initial plant status briefing from Control Room and TSC personnel and conduct briefing for OSC personnel. (Emergency Facility Telephone Numbers can be found in the ERO Phone Book.) - Instruct personnel to obtain their equipment and to prepare for missions (have sonre Maintenance personnel get into anti-Cs). - Synchronize clocks to ERFIS/EDS. - Declare the OSC activated. Announce activation and time activated using the OSC public address system. Report the same to the Emergency Repair Director or SEC.
I EPOSC-01 Rev. 7 Page 1-16 of 1-28
ATTACHMENT 8.1.5.4 Page 2 of 2 OSC LEADER'S CHECKLIST OPERATIONS
- Support overall emergency response efforts - Ensure the OSC Leader Log, Tag and OSC Status Board are being maintained. - Ensure Damage Control Teams are preparing for missions. - Conduct frequent briefings of personnel.
General Briefings:
- Emergency condition/action level. - Plant status. - Wind direction and radiation level Team Specific Briefings/Debriefing will be given by the Team Leaders and Supervisors.
EVACUATION
- Should it become necessary, evacuate the facility according to Attachment 8.1.5.5, OSC Evacuation and Backup OSC Setup.
DEACTIVATION - Review OSC Log for completeness and accuracy. - Ensure all logs and Attachments are given to the Emergency Preparedness Staff. - Ensure proper decontamination is performed if required - Ensure all assigned personnel return and inventory their equipment. - Ensure all lockers for equipment and supplies are locked or sealed. - Leave the area in a clean condition. - Give a final deactivation status report to the ERD or the SEC. EPOSO-01 Rev. 7 Page 1-17 of 1-28]
ATTACHMENT 8.1.5.5 Page 1 of 1 OSC EVACUATION AND BACKUP OSC SETUP (UNIT #1 SHOP) Should adverse environmental conditions dictate, the OSC may be evacuated. The backup OSC is unit #1 Shop. The OSC Leader in conference with the ERD and the RCD, is responsible for making the decision to evacuate and for properly conducting the evacuation and backup OSC setup. The following supplies and equipment will be maintained in the backup OSC: - Tag Board, OSC Status Board, E&RC Status Board, Plant Diagram Board, RWP Status Board. Telephones (with same phone numbers), SCBAs, H.P. Emergency Kit, Tables, Chairs, POM, Microfiche Machine, Other Necessary Supplies. NOTE: Fax can be obtained through A&LM or from unit #1 staff areas. The following supplies and equipment should be moved from the primary OSC: - OSC Personnel Log, E&RC LOG, RWPs, Maintenance Radios, & E&RC radios, Necessary equipment/supplies determined necessary for continued operation.
-21 I 1 1 25 1 i r-I MEZZANINE 20 U 7 22 3 U 24 23 F 14 13 NOT TO SCALE
- 1. OSC Leader (5034) 16. ALARA Supervisor
- 2. OSC Administrative Assistant (5026) 17. RC Supervisor (5020)
- 3. E&RC Leader (5027) 18. RC Table
- 4. E&RC Log Keeper 19. OSC Entrance
- 5. OSC Status Board 20. E&RC Status Board
- 6. Damage Control Team Leader (5015) 21. OSC Exit
- 7. Security Watch Person 22. RWP Area
- 8. I&C/Electrical Planner (5013) 23. RWP Status Board
- 9. Mechanical Planner (5013) 24. Dosimetry Table
- 10. Mechanical Supervisor (5018) 25. Plant Diagram Board
- 11. I&C/Electricol Supervisor (5019) 26. DCT Briefing/Debriefing Area
- 12. Fox Machine (1627) 27. DCT Stoging/Woiting Area
- 13. Storekeeper Area 28. H.P. Locker
- 14. OSC Personnel Tog Board 29. OSC/H.P. Equipment Storage
- 15. Chemistry Table E&C Supervisor (5033)
EPOSC-01 Rev. 7 1 Page 1-18 of 1-28]
ATTACHMENT 8.1.5.6 Page 1 of 1 OSC LEADER ADMINISTRATIVE ASSISTANT CHECKLIST The OSC Leader Administrative Assistant shall: - Report to the OSC Leader. - Assist in facility activation per Attachment 8.1.5.1, OCS Activation/Layout. - Log all major communications and decisions for the OSC Leader and the OSC Leader's direct staff. - Assist in briefing the Access Control Clerk as to duties of the position. - Ensure that the OSC Leader is informed of what tags are remaining on the Tag Board. - Keep OSC Status Board correct. - Perform any other tasks as directed by the OSC Leader. - Help in deactivation activities. EPOSC-01 Rev. 7 Page 1-19 of 1-28
ATTACHMENT 8.1.5.7 Page 1 of 1 STOREKEEPER CHECKLIST The Storekeeper shall:
- Report to the Damage Control Team Leader. - Assist in facility activation per Attachment 8.1.5.1, OSC Activation/Layout. - Provide necessary tools and parts to perform the mission. - Perform any other tasks as directed by the OSC Leader. - Help in deactivation activities.
I EPOSC-o0 Rev. 7 Page 1-20of 28
ATTACHMENT 8.1.5.8 Page 1 of 7 TAG BOARD/POSITION TASK LIST The following positions represent those used on the OSC Tag Board. Below each position is their respective task list. It not necessary for all OSC personnel to have a tag. The Tag Board represents the recommended OSC staff. OSC LEADER SECURITY WATCHPERSON OSC LEADER Report to ERD Report to OSC Leader ADMINISTRATIVE ASSISTANT
- declare presence - setup Security desk Report to OSC Leader - evacuate non-responders - report readiness - call Security - contact OSC Leader on - obtain log forms - access control special access - assist in OSC setup - staff completely - assist in accountability - report readiness - brief on status - setup access desk - assist OSC Leader - ensure OSC setup - set up personnel log - log all major OSC - declare operations activities/communications - ensure tag board is being - report attendance - assist in OSC deactivation used - support TSC operations - ensure all other entry - ensure OSC deactivation points are blocked - oversight and support of - maintain access control to Damage Control teams OSC - assist in OSC deactivation FACILITY ADMINISTRATIVE ASSISTANT Report to OSC Leader - assist in facility activation - perform miscellaneous administrative duties - assist with facility deactivation as requested - assist in preparation of shift relief/turnover schedule I EPOSC-01 Rev. 7 1 Page 1-21 of 1-28
ATTACHMENT 8.1.5.8 Page 2 of 7 TAG BOARD/POSITION TASK LIST STOREKEEPER DCT LEADER Report to Damage Control Report to OSC Leader Team Leader
- assist in OSC setup - assist in OSC setup - assemble team members - open tool areas - equip. teams - prepare to issue tools - check team equipment - report readiness - take attendance - issue tool/equipment to - report readiness personnel as needed - perform Damage Control - assist OSC Leader missions as - assist in OSC deactivation requested by the OSC Leader - give Damage Control Team brief ings/debriefings - assist in OSC deactivation MAINT. PLANNER 1 MAINT. PLANNER 2 MAINT. SUPERVISOR MAINT. SUPERVISOR MECHANICAL ELECTRICAL MECHANICAL I&C ELECTRICAL Report to DCTL Report to DCTL Report to DCTL Report to DCTL
-assist in OSC setup -assist in OSC setup - assist in OSC setup -assist in OSC setup - prepare work - prepare work - assemble team - assemble team instructions for instructions for members members damage control damage control - equip. teams - equip. teams appropriate to appropriate to the situation and the situation and - check team equip. - check team equip. time available time available - report readiness - report readiness (mechanical (electrical/l&C - perform Damage - perform Damage emphasis) emphasis) Control Control - assist in OSC - assist in OSC Maint./Ops as Maint./Ops as deactivation deactivation required by the required by the DCT Leader DCT Leader
- give Damage - give Damage Control Team Control Team briefings/ briefings/
debriefings debriefings
- assist in OSC - assist in OSC deactivation deactivation EPOSC-01 Rev. 7 _ Page 1-22 of 1-28
ATTACHMENT 8.1.5.8 Page 3 of 7 TAG BOARD/POSITION TASK LIST MECHANIC 1 MECHANIC 2 MECHANIC 3 MECHANIC 4 Report to Maint. Report to Maint. Report to Maint. Report to Maint. Mech. Supervisor Mech. Supervisor Mech. Supervisor Mech. Supervisor
- assist in OSC - assist in OSC - assist in OSC - assist in OSC setup setup setup setup - assemble equipment - assemble equipment - assemble equipment - assemble equipment - check equipment - check equipment - check equipment - check equipment - report readiness - report readiness - report readiness - report readiness - perform maint. - perform maint. - perform maint. - perform maint.
Activities as activities as activities as activities as directed by the directed by the directed by the directed by the DCT Leader DCT Leader DCT Leader DCT Leader
- assist in OSC - assist in OSC - assist in OSC - assist in OSC deactivation deactivation deactivation deactivation ELECTRICIAN 1 ELECTRICIAN 2 I& C TECH. 1 Report to Maint. Report to Maint. Report to Maint.
Supervisor - I&C/Elec. Supervisor - I&C/Elec. Supervisor - I&C/Elec. - assist in OSC setup - assist in OSC setup - assist in OSC setup - assemble equipment - assemble equipment - assemble equipment - check equipment - check equipment - check equipment - report readiness - report readiness - report readiness - perform maint. - perform maint. - perform maint. Activities as activities as activities as directed by the directed by the directed by the DCT Leader DCT Leader DCT Leader - assist in OSC - assist in OSC - assist in OSC deactivation deactivation deactivation I EPOSC-01 Rev. 7 1 Page 1-23 of 1-28
ATTACHMENT 8.1.5.8 Page 4 of 7 TAG BOARD/POSITION TASK LIST I & C TECH. 2 I & C TECH. 3 I & C TECH. 4 Report to Maint. Report to Maint. Report to Maint. Supervisor - I&C/Elec. Supervisor - I&C/Elec. Supervisor - I&C/Elec. - assist in OSC setup - assist in OSC setup - assist in OSC setup - assemble equipment - assemble equipment - assemble equipment - check equipment - check equipment - check equipment - report readiness - report readiness - report readiness - perform maint. - perform maint. - perform maint. Activities as activities as activities as directed by the directed by the directed by the DCT Leader DCT Leader DCT Leader - assist in OSC - assist in OSC - assist in OSC deactivation deactivation deactivation RC SUPERVISOR RC FIELD E&C SUPERVISOR RC TECH. 1 RCT SUPERVISOR Report to OSC Report to OSC Report to EC/RC Leader Report to OSC Leader Supervisor Leader
- assist in - assist in OSC - assist in OSC setup - assist in OSC setup OSC setup setup - obtain/check - Coordinate and - obtain equipment - Coordinate and support the equipment support the work of team - report - check work of team members of the readiness equipment members of the Chemistry - provide Radiation Teams. - report Radiological Control Teams. readiness - obtain direction to - obtain Damage Control equipment - perform HP Teams equipment work as - check equipment - check equipment directed by
- interface with - report the E&C/RC ALARA - report readiness Supervisor Supervisor readiness
- assist in OSC - assist in
- assist in - assist in OSC deactivation OSC Damage Control deactivation deactivation Team briefings/ debriefings - assist in OSC deactivation I EPOSC-o1 Rev. 7 1 Page 1-24of128
ATTACHMENT 8.1.5.8 Page 5 of 7 TAG BOARD/POSITION TASK LIST RC TECH. 2 RCT RC TECH. 3 RCT RC TECH. 4 RCT Report to E&C/RC Report to E&C/RC Report to E&C/RC Supervisor Supervisor Supervisor - assist in OSC setup - assist in OSC setup - assist in OSC setup - obtain equipment - obtain equipment - obtain equipment - check equipment - check equipment - check equipment - report readiness - report readiness - report readiness - perform HP work as - perform HP work as - perform HP work as directed by the directed by the directed by the E&C/RC E&C/RC E&C/RC Supervisor Supervisor Supervisor - assist in OSC - assist in OSC - assist in OSC deactivation deactivation deactivation RC TECH. 5 RCT RC TECH. 6 RCT ALARA SUPERVISOR Report to E&C/RC Report to E&C/RC Report to E&C/RC Supervisor Supervisor Supervisor - assist in OSC setup - assist in OSC setup - assist in OSC setup - obtain equipment - obtain equipment - obtain ALARA - check equipment - check equipment ref. materials - report readiness - report readiness - report readiness - perform HP work as - perform HP work as - perform ALARA directed by the directed by the reviews of all E&C/RC E&C/RC related RWP work Supervisor Supervisor - provide radiological - assist in OSC - assist in OSC direction to Damage deactivation deactivation Control Teams
- give mission briefings - assist in OSC deactivation I EPOSC-01 Rev. 7 1 Page 1-25 of 1-28
ATTACHMENT 8.1.5.8 Page 6 of 7 TAG BOARD/POSITION TASK LIST DOSIMETRY TECH. Report to E&C/RC Supervisor - assist in OSC setup - Coordinate and support the work of all team members - interface with the E&C/RC Supervisor - issue dosimetry - assist in OSC deactivation I EPOSC-01 Rev. 7 Page 1-26 of 1-28
ATTACHMENT 8.1.5.8 Page 7 of 7 TAG BOARD/POSITION TASK LIST PASS/CHEM. TECH. #1 PASS/CHEM. TECH. #2 Report to E&C/RC Report to E&C/RC Supervisor Supervisor - assist in OSC - assist in OSC setup setup
- check equipment
- check equipment
- report readiness
- report readiness
- perform duties as
- perform duties as directed by the directed by the E&C/RC E&C/RC Supervisor Supervisor
- assist in OSC
- assist in OSC deactivation deactivation PASS/CHEM. TECH. #3 PASS/CHEM. TECH. #4 Report to E&C/RC Report to E&C/RC Supervisor Supervisor - assist in OSC - assist in OSC setup setup - check equipment - check equipment - report readiness - report readiness - perform duties as - perform duties as directed by the directed by the E&C/RC E&C/RC Supervisor Supervisor - assist in OSC - assist in OSC deactivation deactivation EPOSC-01 Rev. 7 Page 1-27 of 1-28
ATTACHMENT 8.1.5.9 Page 1 of 1 OSC PERSONNEL ROSTER NOTE: The positions listed below are recommended for activation purposes, however, partial activation should be considered in order to assist the Control Room as soon as practical. NAME (PLEASE PRINT) / TIME ____ OSC LEADER (A-75) / E&C TECHNICIAN #1 (B1-45) / E&C TECHNICIAN #2 (B11-45) / E&C TECHNICIAN #3 (B11-45) / E&C TECHNICIAN #4 (B1-75) / E&C TECHNICIAN #5 (B1-75) / E&C TECHNICIAN #6 (B1-75) / RC TECHNICIAN #1 (B1 -45) / RC TECHNICIAN #2 (B1 -45) / RC TECHNICIAN #3 (B1-45) / RC TECHNICIAN #4 (B1-75) / RC TECHNICIAN #5 (B1-75) / RC TECHNICIAN #6 (B1-75) / ____ DAMAGE CONTROL LDR (A-75) / ___ MECHANIC #1 (B1-45) / ___ MECHANIC #2 (B1-45) / MECHANIC #3 (B1-75) / ____ MECHANIC #4 (B1-75) / ELEC./I&C TECH #1 (B1 -45) / ___ ELEC./I&C TECH #2 (B1 -45) / ___ ELEC./I&C TECH #3 (B1 -75) / ____ ELEC./I&C TECH #4 (B1-75) / ____ OSC STOREKEEPER (A-75) / OSC POSITIONS LISTED BELOW ARE NOT REQUIRED FOR INITIAL OSC ACTIVATION. MECHANICAL PLANNER / ELEC./I&C PLANNER / OSC LEADER ADMIN. ASSISTANT / E&RC SUPERVISOR / FACILITY ADMIN ASSISTANT / EPOSC-01 Rev. 7 Page 1-28 of 1-28]
United States Nuclear Regulatory Commission Attachment V to Serial RNP-RA/02-0052 10 Pages EPOSC-03 ENVIRONMENTAL AND RADIATION CONTROL TEAM Revision 5
R CP&L Reference Use CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PLANT OPERATING MANUAL VOLUME 2 PART 5 EMERGENCY PROCEDURE EPOSC-03 ENVIRONMENTAL AND RADIATION CONTROL TEAM REVISION 5 EPOSC-03 Rev. 5 Page 3-1 of 3-9]
SUMMARY
OF CHANGES SECTION/STEP REVISION Table of Added Attachment 8.3.5.2, E&RC Activity Briefing Form to list of Contents attachments. Instructions Added instructions for completion of Attachment 8.3.5.2. Step 8.3.3.8 Attachments Added Attachment 8.3.5.2, E&RC Activity Briefing Form to list of Step 8.3.5.2 attachments. Attachment Added form for documenting briefing items for E&RC activities. 8.3.5.2 EPOSC-03 Rev. 5 Page 3-2 of39
TABLE OF CONTENTS SECTION PAGE Q UICK START GUIDE ................................................................................................. 3-4 8.3.1 PURPOSE .............................................................................................. 3-5 8.3.2 RESPO NSIBILITIES ............................................................................... 3-5 8.3.3 INSTRUCTIONS ..................................................................................... 3-5 8.3.4 RECO RDS .............................................................................................. 3-7 8.3.5 ATTACHM ENTS ..................................................................................... 3-7 8.3.5.1 E&RC Team Activity Priorities ...................................................... 3-8 8.3.5.2 E&RC Activity Briefing Form ......................................................... 3-9 IEPOSC-03 Rev. 5 Page33of3-9
ENVIRONMENTAL AND RADIATION CONTROL TEAM QUICK START GUIDE NOTE: Blanks are provided for place keeping V's only, logs are the official record. This is a summary level guide and does not replace the procedure steps.
- 1. If Dialogic was used for callout, upon arrival at the Facility, notify Dialogic at X 1777.
- 2. Upon arrival at the Operational Support Center (OSC) establish communications with the Radiation Control Director (RCD) in the Technical Support Center (TSC).
- 3. Prepare the E&RC work area in the OSC.
- 4. Assure that adequate E&RC staffing is available.
- 5. Monitor OSC habitability.
- 6. Report the E&RC Personnel readiness to the OSC Leader.
- 7. Obtain respirator qualification printout for use during respirator issue.
- 8. If necessary, refer to Attachment 8.3.5.1, E&RC Team Activity Priorities.
- 9. Refer to procedure.
I EPOSC-03 Rev. 5 Page 3-4 of 3-9
8.3 ENVIRONMENTAL AND RADIATION CONTROL TEAM 8.3.1 PURPOSE
- 1. The purpose of this procedure is to provide the guidelines to be used by the OSC Leader or, if available, an E&RC Supervisor from the RC Technician staff in the OSC.
8.3.2 RESPONSIBILITIES
- 1. The E&RC Team is responsible to the OSC Leader for general Radiation Control, Plant Monitoring, ALARA, Personnel Protection and Mission Support.
- 2. An E&RC Supervisor, assigned lead technician, or the OSC Leader is responsible for providing information to the RCD pertaining to the execution of radiation protection and in-plant and on-site radiation monitoring activities during an emergency.
- 3. An E&RC Supervisor, assigned lead technician, or the OSC Leader is also responsible for ensuring that Emergency Worker Dose Limits are correctly implemented and approved by Management.
8.3.3 INSTRUCTIONS
- 1. E&RC personnel assigned to the OSC shall report to the facility at the declaration of an ALERT or higher emergency classification or when requested to activate by the Site Emergency Coordinator (SEC).
- 2. Upon arriving at the OSC, an available E&RC Supervisor or assigned team member will perform the following:
- a. Establish communications with the RCD in the TSC.
- b. Prepare the E&RC work area in the OSC in conjunction with the OSC Leader.
- c. Assure that adequate E&RC staffing is available as indicated on the appropriate sections of the OSC tag board.
I EPOSC-03 Rev. 5 Page3 of39
8.3.3.2 (Continued)
- d. Establish and monitor the habitability of the OSC.
- e. Report the E&RC Personnel accountability and state of readiness to the OSC Leader.
- f. Assure that a respirator qualification printout or an approved database is available and used by E&RC personnel issuing respirators.
- g. Ensure a sufficient number of TLDs and self reading dosimeters are available for use (SRPD or Electronic Dosimeters).
- h. Prioritize activities.
- Attachment 8.3.5.1, E&RC Team Activity Priorities, presents a general outline of task priorities developed to address emergency situations.
- 3. Assign, brief, direct, and debrief any teams dispatched, as well as the personnel assigned to Plant Access Points, and Assembly Areas.
- a. These briefings may be done by ALARA Personnel, Specialists, Supervisors, or Lead Technicians.
- b. For each monitoring assignment, brief the team members on the following:
- Monitoring and sample collection location(s); - Required data; - Anticipated radiological conditions; - Required protective gear and dosimetry; - Primary and alternate ingress/egress routes; - Maximum stay times and radiation field limitations requiring special authorization.
IEPOSC-03 Rev. 5 Page836of39
8.3.3 (Continued)
- 4. Assign and dispatch personnel to the TSC/EOF to conduct dosimetry and habitability activities.
- 5. Sign any necessary OSC documents on behalf of the RCD.
- 6. If the OSC must be evacuated, and the back-up OSC established, assure that the E&RC status board, records, and necessary radiation monitoring and personnel protection equipment and supplies are available in the back-up OSC as described in EPOSC-01, Operational Support Center Leader.
- 7. If decontamination of personnel vehicles is needed outside the Protected Area, a special plan for this activity will be developed in conjunction with the RCD.
- 8. Complete Attachment 8.3.5.2, E&RC Activity Briefing Form. If a medical emergency exists, verbal authorization may be given for team dispatch as long as the information is documented in the OSC Team Leader log.
8.3.4 RECORDS N/A 8.3.5 ATTACHMENTS 8.3.5.1 E&RC Team Activity Priorities 8.3.5.2 E&RC Activity Briefing Form SEPoso03 Rev. 5 Page 3-7 of 3-9
ATTACHMENT 8.3.5.1 Page 1 of 1 E&RC TEAM ACTIVITY PRIORITIES (*)
- 1. Assign personnel to accompany Search and Rescue and First Aid: Life Saving Only
- 2. Set up OSC, including Fax machine
- 3. Assure habitability and badging of Emergency Response Facilities
- 4. In-plant surveys to calculate Initial Source Term
- 5. Provide personnel to accompany initial Damage Control Team and Support Operations
- 6. Provide personnel to monitor at the Access Control Point for Radiation/Contaminated Areas
- 7. Assign personnel to accompany emergency first aid and decontamination mission: not Life-saving
- 8. Provide personnel to accompany follow-up reentry teams
- 9. Personnel exposure control routine dosimetry assurance and completion of Special Radiation Work Permits
- 10. Place badges on fenceline
- 11. Release vehicles at plant entrances
- 12. Follow-up in-plant/onsite monitoring and sample collection
- 13. Sample analysis
- 14. Assign personnel to accompany minor First Aid and Decontamination
(*) This list of activity priorities is sequenced in a "likely order" for a fast breaking radiological emergency when personnel resources may be limited. Personnel assignments should be made as needed by the specific plant and personnel requirements. EPOSC-03 Rev. 5 Page 3-8 of 3-91
ATTACHMENT 8.3.5.2 Page 1 of 1 E&RC ACTIVITY BRIEFING FORM
- 1. Team Number:
- 2. Activity
Description:
- 3. Team Member(s):
- 4. Assigned personnel have been briefed on their activities, plant conditions, and necessary precautions. /
E&RC Lead Date
- 5. The RCD and OSC Leader have been notified and the E&RC Status Board has been updated. /
E&RC Lead Date EPOSC-03 Rev. 5 Page 3-9 of 3-9
United States Nuclear Regulatory Commission Attachment VI to Serial RNP-RA/02-0052 77 Pages EPRAD-03 DOSE PROJECTIONS Revision 11
R CP&L Reference Use CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PLANT OPERATING MANUAL VOLUME 2 PART 5 EMERGENCY PROCEDURE EPRAD-03 DOSE PROJECTIONS REVISION 11 IEPRAD-03 Rev. 11 1 Page 3-1 of 3-76 1
SUMMARY
OF CHANGES STEP # REVISION COMMENTS Attachment 8.3.5.7, Corrected containment volume and referenced Engineering Page 1 of 4 Calculation RNP-C/CONT-1002, Determination of Containment Heat Sink. (AR #48622) I EPRAD-03 Rev. 11 Page 3 76
TABLE OF CONTENTS SECTION PAGE 8.3.1 PURPOSE .............................................................................................. 3-4 8.3.2 RESPONSIBILITIES ............................................................................... 3-4 8.3.3 INSTRUCTIO NS ..................................................................................... 3-4 8.3.3. 1 Use of the Dose Projection Program in the Control Room ........... 3-4 8.3.3.*2 Use of the Dose Projection Program by the Dose Projection Team .......................................................................................... 3-19 8.3.3.53 Interpretation of the Dose Projection Summary Table ............... 3-41 8.3.4 RECORDS ............................................................................................ 3-43 8.3.5 ATTACHM ENTS ................................................................................... 3-43 8.3.5.1 Definitions and Abbreviations ..................................................... 3-45 8.3.5.2 General Information ................................................................... 3-48 8.3.5.C3 Quality Codes ............................................................................. 3-49 8.3.5.z Core Uncovery Time Determ ination ........................................... 3-50 8.3.5.5 Accident Mitigation System s ...................................................... 3-51 8.3.5.E Obtaining and Updating Meteorological Data ............................. 3-52 8.3.5.7 Source Time Determ ination ........................................................ 3-57 8.3.5.1 Flow Rates ................................................................................. 3-61 8.3.5.9 Detector Sensitivities .................................................................. 3-66 8.3.5.1 0 Measuring Radiation Level on Main Steam Lines ...................... 3-67 8.3.5.1 1 Typical RMS Values ................................................................... 3-68 8.3.5.1 2 RMS Monitored Systems ............................................................ 3-70 8.3.5.1 3 Weather Service Data ................................................................ 3-71 8.3.5.1 4 Onsite Meteorological Data ........................................................ 3-72 8.3.5.1 5 Meteorological Forecast Form .................................................... 3-73 8.3.5.1 6 HBRDOSE/RASCAL Com parison Matrix ................................... 3-74 8.3.5.1 7 Manual Calculation of Curies Released ..................................... 3-76 EPRAD-03 Rev. 11 Page 3-37of 3-76]
8.3.1 PURPOSE This procedure provides instruction for performing dose projections in case of possible offsite emergencies from a release of airborne radioactivity. 8.3.2 RESPONSIBILITIES
- 1. Operations personnel under the direction of the Site Emergency Coordinator are responsible for performing the Control Room portion of this procedure until the Dose Projection Team is activated.
- 2. The Radiological Control Manager or the Dose Projection Team Leader is responsible for calculating the TEDE and the thyroid CDE, to be used by the Radiological Control Manager and the Emergency Response Manager in determining and evaluating possible off-site consequences from a release of airborne radioactivity.
NOTE: Due to the complexity and branching nature of this procedure a slightly different numbering convention from other Emergency Procedures (EPS) is used. Additionally, this section contains several Attachments to assist the user that are not specifically referenced in the body of the section. 8.3.3 INSTRUCTIONS
- 1. USE OF THE DOSE PROJECTION PROGRAM IN THE CONTROL ROOM 1.1 Accessing The Dose Projection Computer Program.
EPRAD-03 Rev. 11 Page 3-4 of 3-76]
8.3.3 (Continued) NOTE: This section represents a systematic approach to access the dose projection computer program. Steps must be followed in order and you must be logged into EDS with an event declared. Any problems in accessing the program must be promptly reported to Information Technology personnel for resolution. 1.1.1 IF the ERFIS terminal to be used is initially aligned to the site LAN, THEN align the terminal to the ERFIS system. NOTE: Inability to link with the ERFIS host is indicated by the following: IF initially in ERFIS during the failure an "ERR1 1 COMMUNICATIONS TIMED OUT!!!" message on the top line of the man machine interface, and the EDS icon in the upper right corner will turn red. IF initially in the site LAN during the failure Error text on the screen and a login prompt. 1.1.2 IF the ERFIS terminal was in the site LAN at the time of the failure and error text and a login prompt are displayed, THEN proceed to Step 1.1.5 for "local mode" operations. 1.1.3 IF the ERFIS terminal to be used is aligned and linked to ERFIS, THEN dose projection may be accessed by typing the turn on code "hbrdose" in the man-machine interface or alternately, from the main menu select the "EP" Menu, then choose "hbrdose."
- 1. IF the dose projection program is accessed, THEN proceed to Section 1.2 "Control Room Dose Projection."
- 2. IF the dose projection program is not accessed, THEN proceed to the next step.
EPRAD-03 Rev. 11 Page 3-5 of 3-76
8.3.3 (Continued) 1.1.4 IF the ERFIS terminal to be used is aligned but not linked to ERFIS, THEN dose projection may still be used, however, radiological and meteorological data must be manually entered.
- 1. Type the turn on code "hbrdose" in the man-machine interface.
- 2. Notify Information Technology personnel of problems as soon as practical.
- 3. IF the dose projection program is accessed, THEN proceed to Section 1.2 "Control Room Dose Projection."
- 4. IF the dose projection is not accessed, THEN proceed to the next step.
1.1.5 IF the ERFIS terminal to be used can not be aligned to ERFIS, THEN continue in this section to configure the ERFIS terminal for "local mode." NOTE: As long as the ERFIS terminal has power the following sub-steps should align the terminal to perform dose projection in "local mode." This method will require manual entry of radiological and meteorological data.
- 1. Reboot the ERFIS terminal by depressing CTRL, ALT, SHIFT, DEL (numeric keypad delete must be used) simultaneously. The computer may take up to 10 seconds to respond to this key sequence.
- 2. Choose ERFIS/EDS from the System Commander.
- 3. IF a grey QNX window appears, THEN press the right mouse button to get the menu, choose "exit," and confirm the exit choice. Otherwise skip this step and proceed to the next step.
- 4. When the cursor is displayed, possibly after various system messages, press "ENTER" if the login prompt is not displayed. A "Login" prompt should appear.
EPRAD-03 Rev. 11 Page 3-6 of 3-76
1.1.5 (Continued) NOTE: The login and password prompts are case sensitive and must be entered in lower case.
- 5. At the login prompt type "hbrdose" and press "Enter."
- 6. At the password prompt type "hbrdose" and press "Enter."
Hbrdose will automatically start after this step.
- 7. Do not attempt to print or make electronic notifications in "local mode," as this will further degrade execution of the program.
- 8. IF "local mode" worked, go to Section 1.2, "Control Room Dose Projection."
Contact Information Technology personnel for instructions to return the ERFIS terminal to normal when dose projections are complete. 1.1.6 IF "local mode" did not work on the initial ERFIS terminal, THEN repeat Step 1.1.5 on another ERFIS terminal, and request that Information Technology personnel immediately bring a computer to the Control Room with a current version of the dose projection program installed.
- 1. Information Technology personnel will provide instructions on accessing the program.
- 2. Proceed to Section 1.2, "Control Room Dose Projection."
I EPRAD-03 Rev. 11 1 Page 3-7 of 3-76
1.2 Control Room Dose Projection: NOTE: IF at any time the computer locks up while performing the following steps, THEN depress CTRL, ALT, DEL simultaneously, or if that is unsuccessful depress CTRL, ALT, SHIFT, DEL (numeric keypad delete must be used) simultaneously, AND GO TO step 1.1. 1.2.1 With the mouse, left click the Projection menu item. 1.2.2 Left click the Control RM menu item. NOTE: Within each release pathway, the left mouse button can be used to move the cursor to the desired field. Depressing the left mouse button will also select or deselect any of the monitors. CAUTION DO NOT USE radiation monitors that are out-of-service for dose projections. Verify that ERFIS data is correct by comparing it to the control room readouts if the RMS/ERFIS interface multiplexer is in alarm. When manually entering data in hbrdose do not leave blank spaces between characters, (e.g., use 3,000,000 or 3E6 NOT 3 E6). 1.2.3 CONTAINMENT = ENVIRONMENT Group
- a. IF no monitor in the CONTAINMENT=>ENVIRONMENT group is in alarm, Make sure that none of the check boxes are selected. You can deselect any monitor by pressing the left mouse button on the desired monitor. Go to step 1.2.4.
I EPRAD-03 Rev. 11 Page 3-8 of 3-761
1.2.3 (Continued) NOTE: When performing the following step be aware that R-2 is in units of mR/hr while R-32 A&B are in R/hr.
- b. IF R-32A OR R-32B OR R-2 are in alarm, THEN select the alarming monitor that has the highest radiation level AND GO TO step 1.2.3.e.
- c. IF R-12 is in alarm and is aligned to the CV, THEN select R-1 2 AND GO TO Step 1.2.3.e.
- d. IF R-12 is in alarm AND is aligned to the plant vent, THEN GO TO Step 1.2.4.
- e. IF a bad quality code OR no data is being displayed for the selected monitor, THEN manually enter the reading from the radiation monitor drawer.
NOTE: The default CV release flow of 1.5 CFM is based on the CV design leak rate at design basis CV pressure.
- f. IF containment integrity is maintained, THEN go to step 1.2.4.
- g. IF containment integrity is not maintained, THEN enter the leakrate that is escaping through an unmonitored pathway in the FLOW field (next to R-32A).
EPRAD-03 Rev. 11 Page 3-9 of 3-76
1.2.4 PLANT VENT STACK Group
- a. IF no monitors in the PLANT VENT STACK group are in alarm, THEN GO TO Step 1.2.5.
- b. IF R-14E is above 50 cpm, THEN select R-14E AND GO TO Step 1.2.4.f.
- c. IF R-14D is above 12 cpm, THEN select R-14D AND GO TO Step 1.2.4.f.
- d. IF R-14C is in alarm, THEN select R-14C AND GO TO Step 1.2.4.f.
- e. IF R-21 is in alarm, THEN select R-21.
- f. IF a bad quality code OR no data is being displayed for the selected monitor, THEN manually enter the reading from the radiation monitor drawer.
- g. IF R-21 was selected, THEN GO TO Step 1.2.5.
- h. IF a good quality code is provided for stack FLOW THEN GO TO Step 1.2.4.i.
- i. Select the ventilation units which are operating.
1.2.5 R-12
- a. IF R-12 is not in alarm THEN GO TO Step 1.2.6.
- b. IF R-12 is aligned to the CV THEN GO TO Step 1.2.6.
- c. IF R-14C OR R-14D OR R-14E were selected in Step 1.2.4 THEN GO TO Step 1.2.6.
EPRAD-03 Rev. 11 Page 3-10 of 3-76
1.2.5 (Continued)
- d. IF R-21 was selected in Step 1.2.4 AND HVE-15 is the only release pathway THEN GO TO Step 1.2.6.
- e. Select R-12.
- f. IF a bad quality code OR no data is being displayed for R-12, THEN manually enter the reading from the radiation monitor drawer.
NOTE: The groups of HVE units in the PLANT VENT STACK group or Attachment 8.3.5.8, Flow Rates, can be used to determine the following flowrate.
- g. Move the cursor to the plant vent stack flow field and enter the flow that is going up the plant vent stack.
1.2.6 LOWER FHB
- ENVIRONMENT Group
- a. IF no monitors in the Lower FHB =* ENVIRONMENT group are in alarm, THEN GO TO Step 1.2.7.
- b. IF R-20 is in alarm AND has not failed high, THEN select R-20 AND GO TO Step 1.2.6.d.
- c. IF R-20 has failed high, THEN select R-30.
- d. IF a bad quality code OR no data is being displayed for the selected monitor, THEN manually enter the reading from the radiation monitor drawer.
I EPRAD-03 Rev. 11 1 Page 3-11 of 3-76
1.2.7 SECONDARY RELEASE
- a. IF NO R-31 monitors are above one mrem/hr, THEN GO TO Step 1.2.8.
- b. IF steam/water from the Main Steam Line that has a monitor above one mrem/hr is escaping through a faulted Main Steam System outside containment, THEN GO TO step 1.2.7.d.
- c. IF NO PORVs AND NO SRVs are open, THEN GO TO Step 1.2.8.
- d. Select PORV/SRV.
- e. IF a bad quality code OR no data is being displayed for the selected monitor, THEN manually enter the reading from the radiation monitor drawer.
- f. IF the release is due to a Main Steam System fault as described in Step 1.2.7.b., THEN using the Main Steam indications on the RTGB and Attachment 8.3.5.8 to compare flowrates, enter the PORV and SRV combination that would produce the same flow rate as the fault, in the fields below the monitor(s) in alarm, AND GO TO Step 1.2.7.1 .i.
- g. IF the PORV on the Main Steam Line(s) that has the monitor(s) in alarm are open, THEN enter 1 in the PORV field below the monitor(s)in alarm.
- h. IF any SRV(s) on the Main Steam Line(s) that has(have) the monitor(s) in alarm are open, THEN enter the number open in the SRV field below the monitor(s) in alarm.
IF a bad quality code OR no data is being displayed in the SG Press field(s) below the monitor(s) in alarm, THEN manually enter the correct pressure as obtained from control room readouts. I EPRAD-03 Rev. 11 1 Page 3-12 of 3-76
1.2.8 STEAM = CONDENSER
- a. IF R-15 is not in alarm, THEN GO TO Step 1.2.9.
- b. IF R-14C OR R-14D OR R-14E were not selected in the Plant Vent Stack group OR R-1 2 was not selected in Step 1.2.5.f, THEN select Steam => Condenser.
- c. IF R-15 is in alarm and not failed high THEN select STEAMCONDENSER AND go to 1.2.8.d.
- d. IF a bad quality code OR no data is being displayed for R-1 5, THEN manually enter the reading from the radiation monitor drawer.
- e. IF only one vacuum pump is running, THEN select 310 CFM flow AND GO TO Step 1.2.9.
- f. IF two vacuum pumps are running, THEN select 610 CFM flow.
1.2.9 Left click the Done button. I EPRAD-03 I Rev. 11 Page 3-13 of 3-76
1.2.10 SPECTRUM DETERMINATION NOTE: The core uncovery time will be the time that a RED status occurs on the CORE COOLING critical safety function status tree until the tree conditions return to yellow status (core covered and core exit thermocouples
< 7000 F). This determination can be performed on the TV monitor or on the manual board.
- a. IF the incident does not involve the reactor (i.e. spent fuel, waste gas, old spent fuel), THEN GO TO step 1.2.10.f
- b. IF the incident involves the reactor AND the core has not been uncovered, THEN GO TO step 1.2.1 0.e.
- c. Select the time that the core has been uncovered:
- < 30 minutes - 0.5 - 1.8 hours (30 minutes - 1 hour 48 minutes) - > 1.8 hours (1 hour 48 minutes)
- d. GO TO step 1.2.11.
- e. IF the incident involves mechanical damage to fuel in the reactor, THEN select'< 30 minutes' AND GO TO step 1.2.11.
- f. IF the incident involves a Waste Gas Decay Tank, THEN select WASTE GAS AND GO TO step 1.2.11.
I EPRAD-03 Rev. 11 Page 3-14 of 3-76 1
1.2.10 (Continued) NOTE: Spent fuel that is being shipped or is in preparation for shipment should be classified as OLD SPENT FUEL. Assume that the spent fuel has been out of the reactor core for less than three years if the true time is unknown.
- g. IF the incident is a fuel handling accident AND involves spent fuel that has been out of the reactor core for less than three years THEN select SPENT FUEL AND GO TO step 1.2.11.
- h. IF the incident is a fuel handling accident AND involves spent fuel that has been out of the reactor core for more than three years THEN select OLD SPENT FUEL.
1.2.11 FILTRATION/CV SPRAYS/PARTITIONING NOTE: Attachment 8.3.5.5, Accident Mitigation Systems, of this procedure describes if Filtration/CV Sprays/Partitioning are "Effective" or "Not Effective".
- a. IF Filtration OR CV Sprays OR Partitioning are effective, THEN select Effective AND GO TO Step 1.2.12.
- b. IF Filtration OR CV Sprays OR Partitioning are not effective, THEN select Not Effective.
EPRAD-03 Rev. 11 Page 3-15 of 3-76
1.2.12 METEOROLOGY CAUTION If direct access to the meteorological tower has failed, the data will appear colored red in the input fields. DO NOT USE THIS DATA.
- a. IF meteorological data with a good quality code is being displayed, THEN GO TO Step 1.2.12.m.
- b. IF a bad quality code OR no data is being displayed for meteorological data, THEN left click the REFRESH button to make a second attempt to acquire meteorological data from ERFIS.
- c. IF the computer makes the connection to the meteorological tower AND the meteorological data is properly updated (in accordance with Caution Statement above), THEN GO TO Step 1.2.12.m.
- d. IF meteorological data is not available from the control room computer, THEN manually update the meteorological data.
- e. Call the CP&L offsite meteorological contact (See the ERO Phone Book for number).
- f. IF meteorological data is available from the CP&L offsite meteorological contact, THEN manually update the meteorological data AND GO TO Step 1.2.12.k.
NOTE: If the Florence Airport or the National Weather Service office is called, the only information that can be obtained is the wind direction, wind speed, and ambient temperature. Stability factor must be obtained from Step 1.2.12.k of this procedure. If wind speed and direction are only supplied for one point enter these values in both the elevated and ground fields. Do not enter wind gust as the wind speed, and if no Delta T is supplied do not enter one.
- g. Call the Florence Airport: (See the ERO Phone Book for numbers)
EPRAD-03 Rev. 11 Page 3-16 of 3-76
1.2.12 (Continued)
- h. IF meteorological data is available from the Florence Airport, THEN manually update the meteorological data AND GO TO Step 1.2.13.
Call the National Weather Service office in Columbia, South Carolina: (See the ERO Phone Book for numbers)
- j. IF meteorological data is available from the National Weather Service, THEN manually update the meteorological data.
- k. IF there is no stability class data available, THEN make an estimate of the current Atmospheric Stability Class by visual observation, using the following table:
Rain, Sunny Cloudy Cloudy Clear Day or Day Day Night Night Nght light wind or calm D B C E F (< 11.5 mph) moderately strong D C D D D wind(_Ž 11.5 mph) I. Enter the stability class in the appropriate field.
- m. Left click the Shutdown time field.
1.2.13 REACTOR SHUTDOWN TIME
- a. IF the reactor is not shutdown, THEN GO TO Step 1.2.14.
- b. IF the reactor is shutdown AND the shutdown time is not displayed OR is not correct, THEN manually enter the date and time of shutdown in the space provided.
I EPRAD-03 Rev. 11 Page 3-17 of 3-76
1.2.14 RELEASE DURATION NOTE: The estimated release duration should be from the start of the release until the projected time that the release should stop. This can be determined by estimating the completion of a damage control mission, performance of a repair to stop the release, or the estimated time until the RCS, CV Sump, or Steam Generator is below 2000 F.
- a. IF the release duration is known, THEN manually enter the release duration in the field provided AND go to Step 1.2.15.
- b. IF the release duration is unknown AND an estimate is available, THEN enter the estimated time in the field provided AND go to Step 1.2.15.
- c. IF the release duration is unknown AND no estimate is available, THEN enter 1 in the field provided AND go to Step 1.2.15.
1.2.15 Left click the Done button. 1.2.16 The dose projection will be given on the screen. 1.2.17 Using the information supplied notify the government officials as per the requirements of EPNOT-00. I EPRAD-03 Rev. 11 1 Page 3-18 of 3-76
- 2. USE OF THE DOSE PROJECTION PROGRAM BY THE DOSE PROJECTION TEAM 2.1 Access the software using Section 1.1 of this procedure as a guideline, and return to this section instead of the Control Room Dose Projection section.
2.2 The main menu screen will appear. The items in this menu can be accessed by clicking the left button on any of these items. 2.3 Six menu topics are available for use. They are listed here along with the section in this procedure which explains their use. Projection 2.4 Contingency 2.5 Int Phase 2.6 Graphics 2.7 Utilities 2.8 Exit 2.9 NOTE: The Dose Projection Program should be used to calculate the "Total Dose" from the start of the release until the projected end. To do so conservatively, the Dose Projection Team may decide to use the estimated peak release rate throughout the release period. If no information is available, the current release rate should be considered constant throughout the release period. 2.4 PROJECTION This menu item should be used to perform early phase dose projections based on plant radiation monitors, plant samples, or environmental samples. I EPRAD-03 I Rev. 11 Page 3-19of376
2.4.1 Control Room This function should be used by control room personnel. Its use is described in Step 1.2 of this procedure. 2.4.2 RMS This function should be used by the dose projection team to perform dose projections when adequate data is available from the plant effluent monitors. The following steps are for guidance and are not required to be performed in entirety or in the order in which they are given. 2.4.2.1 The first screen that will appear when this menu option is selected is the ROBINSON EFFLUENT MONITORS screen. The following items should be considered when using this screen: CAUTION DO NOT perform an official dose projection using data obtained from a radiation monitor that is out-of-service. The control room may be contacted to determine any monitors that are out-of-service that may have good quality codes on ERFIS. This could occur when the RMS/ERFIS interface multiplexer fails. When manually entering data in hbrdose do not leave blank spaces between characters, (e.g., use 3,000,000 or 3E6 NOT 3 E6). NOTE: Attachment 8.3.5.12, RMS Monitored Systems can be used to determine the relationship between radiation monitors and effluent pathways. Data that is on this screen will have quality codes in Attachment 8.3.5.3, Quality Codes of this procedure. I EPRAD-03 Rev. 11 Page 3-20 of 3-76
2.4.2.1 (Continued)
- Dose projections for more than one release pathway can be performed using this program. The monitors are grouped on this screen according to the release pathway that they monitor. Therefore, only one monitor from each group can be selected each time the dose projection program is executed.
The Containment to Environment release path is a valid release path in most situations even when no containment leakage has been identified. The 1.5 cfm flow is the design basis release rate when the CV is pressurized to design basis pressure. If containment leakage is into the Auxiliary Building and the release is monitored by a stack monitor a dose projection using the containment monitors is not necessary. NOTE: If a projection is made using R-12 aligned to the plant vent it will be based on a ground level release pathway instead of a mixed mode release. R-12 is usually lined up to the containment atmosphere. If a dose projection is performed using R-12, ensure that it aligned the way that it is being used. R-1 2 can be used to perform a dose projection when it is aligned to the plant vent. In order to accomplish this the R-1 2 plant vent flowrate must be manually entered into the containment monitors flowrate field. If this is performed, then it can not be accomplished at the same time that a dose projection is being performed based on containment leakage. For this reason, if a projection is needed based on both release paths, they must be performed separately and manually added together. EPRAD-03 Rev. 11 1 Page 3-21 of 3-76
2.4.2.1 (Continued)
- The flow rate for the R-14 monitors will be automatically updated by ERFIS to reflect the plant vent stack when ERFIS is available.
R-21 has a default flow rate which is equivalent to the flow of HVE-1 5. This default value should normally be used, because this is the effluent volume that this detector is monitoring. R-20 and R-30 have a default flow rate which is equivalent to the flow of HVE-14. R-31A, 31B, and 31C should not normally be used if they are below 1 mrem/hr. However, if they are, they must be background corrected and manually entered. Obtain the latest valid normal reading from the weekly background/alarm setpoint check or other source (Attachment 8.3.5.11, Typical RMS Data, may be used) and subtract the normal reading from the control room readout and enter this value. If a release is due to a faulted steam line, a dose projection can be performed by selecting the number of SRV's and PORV that would approximate the release (use Attachment 8.3.5.8, Flow Rates). The UNKNOWN MIX under the CONTINGENCY menu can be used to perform a dose projection under this condition using Attachment 8.3.5.7, Source Term Determination, Part E. I EPRAD-03 Rev. 11 Page 3-22 of 3-76 1
2.4.2.1 (Continued) NOTE: If a dose projection is performed using R-15 and the release is due to a break in the line between the condenser vacuum pumps and the plant vent stack, the projection will be based on a mixed mode release, instead of a ground level release. The program will allow you to perform dose projections using the R-15 monitor and the plant vent monitors at the same time. However, this should only be done under the following circumstances: R-15 is above background and the line from the condenser vacuum pumps to the plant vent is allowing leakage, OR R-15 is above background and NEITHER R 14C, R-14D, R-14E, NOR R-12 when it is aligned to the plant vent, are being used for a dose projection. 2.4.2.2 Once selections have been made on this screen select the DONE field. EPRAD-03 Rev. 11 Page 3-23 of 3-76]
2.4.2.3 The SPECTRUM DETERMINATION screen is the next screen that will appear. Several characteristics of the incident must be entered on this screen in order to identify the source term. NOTE: Only one of the following conditions can exist for each execution of the Dose Projection Program. If more than one of the following conditions exist, execute the projection more than once using the appropriate effluent monitors to accurately quantify the effluent. If the incident involves the reactor, the time that the reactor core has been uncovered must be selected using the guidelines in Attachment 8.3.5.4, Core Uncovery Time Determination of this procedure. If the incident involves Spent Fuel, regardless of the location, you must identify if the fuel is Spent Fuel or Old Spent Fuel. Old Spent Fuel is fuel that has not been in the reactor while critical for three years or more. If the incident involves a Waste Gas Decay Tank select the Waste Gas option. NOTE: The estimated release duration should be from the start of the release until the projected time that the release should stop. This can be determined by estimating the completion of a damage control mission, performance of a repair to stop the release, or the estimated time until the RCS, CV Sump, or Steam Generator is below 2000 F. The RELEASE DURATION should be determined and entered in the appropriate field. If an estimate of the time is not known one hour can be used here until better information is available. I EPRAD-03 Rev. 11 1 Page 3-24 of 3-76
2.4.2.3 (Continued) NOTE: A Plant Operations Advisor, SRO on the Accident Assessment Team, or the Shift Technical Advisor should be consulted to determine whether these mitigation systems are operable. The effectiveness of FILTRATION/CV SPRAYS/PARTITIONING should be determined. Use the guidelines in Attachment 8.3.5.5, Accident Mitigation Systems, of this procedure to make this determination. If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using Attachment 8.3.5.6, Obtaining and Updating Meteorological Data, of this procedure for guidance. If the plant has SHUTDOWN enter the shutdown date and time in the appropriate fields. Otherwise, these fields can be left as they appear. The DONE field should be selected when all of the information on this screen has been entered. 2.4.2.4 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. 2.4.3 PLANT SAMPLE This function is for use by the dose projection team to perform dose projections based on plant samples of the effluent stream. It should be used as needed by the dose projection team. I EPRAD-03 Rev. 11 1 Page 3-25 of 3-76
2.4.3.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. Enter the activity of each nuclide that is listed on the screen that is available from the plant sample analysis. Identify the release height of the effluent. Select mixed if the release is through the plant vent regardless of the wind speed. Select ground if the release is by any other pathway, or if the pathway is unknown. The time from sample to release is provided to correct the sample activity for any radioactive decay that has occurred in the sample effluent between the time the sample was collected and the time of the release. DO NOT enter a value in this field unless you wish to decay correct the effluent stream. Enter the flowrate in cfm of the effluent stream. Care should be taken to understand where the sample was obtained, and ensure that the FLOW field data corresponds with the flow of the sampled air with no further dilution. A flowrate can be manually entered using the flowrates in Attachment 8.3.5.8, Flow Rates, as a reference, or a flow can be selected by selecting the FLOWS field. I EPRAD-03 Rev.1 1 Page 3-26 of 3-76
2.4.3.1 (Continued) NOTE: The estimated release duration should be from the start of the release until the projected time that the release should stop. This can be determined by estimating the completion of a damage control mission, performance of a repair to stop the release, or the estimated time until the RCS, CV Sump, or Steam Generator is below 2000 F. The release duration should be determined and entered in the appropriate field. If an estimate of the time is not known, one hour can be used until better information is available. If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using Attachment 8.3.5.6, Obtaining and Updating Meteorological Data of this procedure for guidance. If the plant has shutdown, enter the shutdown date and time in the appropriate fields. The DONE field should be selected when all of the information on this screen has been entered. 2.4.3.2 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. 2.4.4 ENVIRONMENTAL SAMPLE This function is for use by the dose projection team to perform dose projections based on environmental samples. It should be used as needed by the dose projection team. I EPRAD-03 I Rev. 11 Page 3-27 of 3-761
NOTE: Protective action recommendations are required to be made within 15 minutes of obtaining environmental sample results. (AR #48774) 2.4.4.1 The screen that will appear when this menu option is selected is titled as the ENVIRONMENTAL MONITORING TEAM. It should be completed with the help of the following guidelines. Enter the closed window dose rate (in mrem/hr) that is obtained at a height of approximately one meter above the ground. The value should be obtained from the Environmental Monitoring Team Leader and should reflect the most recent data that is available from near the centerline of the plume. For the air sample dose rate select the CART field, and enter data in the appropriate fields using the following guidance: Enter the sample volume in cubic feet. Select whether count rate or dose rate will be entered. Enter the count rate or dose rate on contact with the iodine cartridge. This data should be obtained from the Environmental Monitoring Team Leader and should reflect the most recent data that is available from the centerline of the plume. Select the DONE field and the program will calculate the Thyroid Committed Dose Rate. (This calculation is based on Attachments in EPRAD-01, Environmental Monitoring.) Select the CANCEL field to exit this window or click the mouse outside of the window. EPRAD-03 Rev. 11 Page 3-28 of 3-76
2.4.4.1 (Continued) Enter the downwind distance from the plant stack to the sample collection location. Enter the direction from the plant that the sample was collected in degrees. The release duration should be determined and entered in the appropriate field. If the time is not known one hour should be used here until better information is available. Identify the release height of the effluent. Select mixed if the release is through the plant vent regardless of the wind speed. Select ground if the release is by any other pathway, or if the pathway is unknown. If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using step Attachment 8.3.5.6, Obtaining and Updating Meteorological Data, of this procedure for guidance. If the plant has shutdown enter the shutdown date and time in the appropriate fields. The DONE field should be selected when all of the information on this screen has been entered. 2.4.4.2 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. I EPRAD-03 Rev. 11 Page 3-29 of 3-76]
2.5 CONTINGENCY Contingency calculations are typically "what if" types of calculations that allow the Dose Projection Team to make predictions of off-site dose based on a projected event. However, they can be used to make actual dose projections. 2.5.1 KNOWN MIX This function allows the user to input the isotopic analysis of the release in order to perform a dose projection. 2.5.1.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. Enter the activity of each nuclide that is listed on the screen which could be in a postulated release. Identify the release height of the effluent. Select mixed if the release is through the plant vent regardless of the wind speed. Select ground if the release is by any other pathway, or if the pathway is unknown. Enter the time from when the activities were determined until the release could begin. This is not required, it should only be entered when it is expected that the activity has decayed since the sample was pulled. Enter the number of Curies that could be released. Attachment 8.3.5.7, Source Term Determination, of this procedure can be used to help determine this value. IEPRAD-03 Rev. 11 1 Page 3- 76
2.5.1.1 (Continued) If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using Attachment 8.3.5.6, Obtaining and Updating Meteorological Data, of this procedure for guidance. If the plant has shutdown enter the shutdown date and time in the appropriate fields. The DONE field should be selected when all of the information on this screen has been entered. 2.5.1.2 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. 2.5.2 UNKNOWN MIX This function allows the user to project what the offsite dose to the public would be due to a release if the total activity of the release is known but the isotopic abundances are not known. 2.5.2.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. NOTE: Only one of the following conditions can exist for each execution of the Dose Projection Program. If more than one of the following conditions exist, execute the projection more than once using the appropriate effluent monitors to accurately quantify the effluent. If the incident involves the reactor core the time that the reactor core has been uncovered or could be uncovered must be selected. Use Attachment 8.3.5.4, Core Uncovery Time Determination, to help make this determination. I EPRAD-03 I Rev. 11 Page 3-31 of 3-761
2.5.2.1 (Continued) If the incident involves Spent Fuel, regardless of the location, you must identify if the fuel is Spent Fuel or Old Spent Fuel. Old Spent Fuel is fuel that has not been in the reactor while critical for three years or more. If the incident involves a Waste Gas Decay Tank select the Waste Gas option. Enter the number of Curies that could be released. Attachment 8.3.5.7, Source Term Determination, of this procedure can be used to help determine this value. Identify the release height of the effluent. Select mixed if the potential release is through the plant vent regardless of the wind speed. Select ground if the release is by any other pathway, or the pathway is unknown. The effectiveness of Filtration/CV Sprays/Partitioning should be determined. The guidelines in Attachment 8.3.5.5, Accident Mitigation Systems, of this procedure should be used to make this determination. If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using Attachment 8.3.5.6, Obtaining and Updating Meteorological Data, of this procedure for guidance. If the plant has shut down enter the shutdown date and time in the appropriate fields. The DONE field should be selected when all of the information on this screen has been entered. I EPRAD-03 Rev. 11 1 Page 3-32of 3-76]
2.5.2.2 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. 2.5.3 DEFAULTS CAUTION Calculated dose using defaults are EXTREMELY conservative and may assume all of the core activity is released, depending on the spectrum determination. This function allows the user to hypothesize what the offsite dose to the public would be due to a postulated release if plant conditions are unknown. A default should only be used when neither the total activity nor the isotopic analysis of the potential release are known. 2.5.3.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. NOTE: Only one of the following conditions can exist for each execution of the Dose Projection Program. If more than one of the following conditions exist, execute the projection more than once using the appropriate effluent monitors to accurately quantify the effluent. If the incident involves the reactor core the time that the reactor core has been uncovered or could be uncovered must be selected. Use Attachment 8.3.5.4, Core Uncovery Time Determination, to make this determination. If the incident involves Spent Fuel, whether in the containment or in the Fuel Handling Building, you must identify if the fuel is Spent Fuel or Old Spent Fuel. Old Spent Fuel is fuel that has not been in the reactor while critical for three years or more. EPRAD-03 Rev. 11 Page 3-33 of 3-76]
2.5.3.1 (Continued)
- If the incident involves a Waste Gas Decay Tank select the Waste Gas option.
Identify the release height of the effluent. Select mixed if the potential release is through the plant vent regardless of the wind speed. Select ground if the release is by any other pathway, or the pathway is unknown. The effectiveness of Filtration/CV Sprays/Partitioning should be determined. The guidelines Attachment 8.3.5.5, Accident Mitigation Systems, of this procedure should be used for making this determination. If the quality codes for the meteorology data are good they may be used. If the quality codes are bad or there is other reason to question them, complete this section using Attachment 8.3.5.6, Obtaining and Updating Meteorological Data, of this procedure for guidance. If the plant has shutdown enter the shutdown date and time in the appropriate fields. The DONE field should be selected when all of the information on this screen has been entered. 2.5.3.2 The Projection Screen is the final screen to appear. It is explained in Step 3 of this procedure. I EPRAD-03 I Rev. 11 Page 3-34o376
2.6 INTERMEDIATE PHASE Intermediate phase calculations are used during the intermediate phase of an emergency to project the one year, two year, and fifty year committed dose to the public due to exposure from contamination deposited on the ground. The calculations are based on environmental data. 2.6.1 DOSE RATE This function is used to calculate the projected doses using dose rate data from environmental monitoring teams. 2.6.1.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. It should be determined if weathering (radioactive decay is also included in this factor) will be considered when performing this function. To do this select the UTILITIES function from the main menu, and follow the guidelines in Step 2.8.5 of this procedure. Enter the closed window dose rate in mrem/hr taken at approximately one meter from the ground in the 1 meter dose rate field. Enter the straight line distance in miles or fractions of miles from the plant vent that the sample was taken. Enter the bearing in degrees from the plant for the sample location. I EPRAD-03 Rev. 11 1 Page 3-35 of 3-761
2.6.1.1 (Continued) NOTE: If no data has been entered under the "Sample" then the "Average Spectrum" choice will not appear, and only the Default Spectrum can be used. Select if the Default Spectrum or the Average Spectrum should be used to perform the projection. The Average Spectrum should be selected here when adequate data has been entered in the "Sample" screen (Step 2.6.2). Select the DONE field when complete and the dose will be given. 2.6.2 Sample This function is used to calculate the projected dose using isotopic analysis of samples collected by environmental monitoring teams. 2.6.2.1 The screen that will appear when this menu option is selected should be completed with the help of the following guidelines. It should be determined if weathering (radioactive decay is also included in this factor) will be considered when performing this function. To do this select the UTILITIES function from the main menu, and follow the guidelines in Step 2.8.5 of this procedure. Enter the activity of each nuclide that is present in the sample that is listed on this screen. These activities should be entered in units of pCi/m2 . The nuclides that are listed on this screen are the only ones in RNP's anticipated source term that have a long enough half-life to contribute significant dose. EPRAD-03 Rev. 11 Page 3-36 of 3-76]
2.6.2.1 (Continued)
- Enter the sample identification number. This will normally be our radiochemistry form number. - Determine if the sample should be added to the sample data base from which the average deposition is calculated. Choosing this option will also include the sample in the average spectrum function of the DOSE RATE option. - Enter the straight line distance in miles or fractions of miles from the plant vent that the sample was taken. - Enter the direction in degrees from the plant for the sample location. - Select the DONE field when complete and the dose will be given.
2.7 GRAPHICS This menu item provides a graphic display of the 10 mile and 50 mile Emergency Planning Zones. It should be used as an aid by the Dose Projection Team to help with Protection Action Recommendations, and determining the adequacy of the environmental monitoring efforts. NOTE: The latest graphics of the 10 MILE ISOPHLETHS and the 10 MILE PARs are automatically saved to a disk file. They can be printed using the Microsoft Paintbrush program. 2.7.1 10 MILE ISOPLETHS This function provides a display of the isopleths within the 10 mile Emergency Planning Zone where the TEDE and Thyroid CDE limits are exceeded. If isopleths do not appear the EPA PAGs are not exceeded by the latest dose projection. I EPRAD-03 Rev. 11 Page 3-37 of 3-76
2.7.2 10 MILE PARS This function displays the evacuation Protective Action Recommendations for the 10 Mile Emergency Planning Zone. This display consist of a five mile radius with a two mile keyhole superimposed on the map. The two mile keyhole applies to only the two mile sector (AO). Any of the five mile sectors (Al, B1, C1, D1, and El) that are intersected by the five mile radius keyhole should be evacuated. Ifthe dose at the centerline of the plume exceeds the EPA PAGs at any distance five miles or beyond, then the radius of the keyhole is extended to ten miles. Any of the ten mile sectors (A2, B2, C2, D2, and E2) which are intersected by the ten mile keyhole should be evacuated. 2.7.3 10 MILE EMT POINTS This function provides a method to enter and display Environmental Monitoring Team Data in the 10 mile EPZ. Click the mouse on the map location were the sample was taken. Enter the closed window dose rate taken at approximately one meter above the ground. Use units of mrem/hr and depress the enter key when complete. The computer will update the sample point with a color coded circle depending on the dose rate recorded at the location. These color codes are given in the upper right hand corner of the screen. EPRAD-03 Rev. 11 Page 3-38 of 3-76
2.7.4 50 MILE INT PHASE This function provides a method to enter Environmental Monitoring Team Data in the 50 mile EPZ, and calculate and display the 1, 2, and 50 year committed doses along with the skin dose. Click the mouse on the map location were the sample was taken. Enter the closed window dose rate taken at approximately one meter above the ground. Use units of mrem/hr and depress the enter key when complete. The computer will update the sample point with a color code that represents if the program is above the EPA limits, above normal background, at background level. It will also calculate the 1, 2, and 50 year committed doses along with the skin dose. 2.8 UTILITIES This menu item is provided to assist the Dose Projection Team. These functions can be used at any time they are needed while using the program. EPRAD-03 Rev. 11 Page 3-39 of 3-76
2.8.5 WEATHERING This function is used when performing an Intermediate Phase Dose Projection to account for reductions in the source term due to weathering and radioactive decay. 2.8.6 PRINTING SETUP This function can be used to configure printing from this application. The user can configure custom printers and enable or disable the automatic printing of dose projection screens. 2.8.7 DISTANCES This function allows the user to adjust the distances from the plant that dose projections are calculated. This is done by identifying the maximum distance from the plant and the increment between each distance that is desired. This function is especially useful in determining distances close in to the site or beyond 10 miles. EPRAD-03 Rev. 11 Page 3-40 of 3-76]
2.8.8 NOTIFICATION This function will automatically print out a State Notification Form in the proper format with the dose projection information completed when it is selected. 2.8.9 MANUAL SCREEN PRINT Use this menu item to print the currently displayed dialog or screen. The printout will be directed to the default printer for the workstation unless a custom printer has been selected. 2.9 EXIT This menu item will exit the dose projection program when it is selected.
- 3. INTERPRETATION OF THE DOSE PROJECTION
SUMMARY
TABLE This summary table appears on the screen after the dose projection calculation has been completed. 3.1 The first column at the top of this table is the distance from the plant. These distances default to Site Boundary, 2 Miles, 5 Miles, and 10 Miles. The distance along the centerline of the plume is identified in the Max row. 3.2 The second column at the top of this table is the TEDE in mrem. This will give the value that is entered on the Notification Form in the appropriate location. 3.3 The third column at the top of this table is the Thyroid CDE in mrem. This will give the value that is entered on the Notification Form in the appropriate location. I EPRAD-03 Rev. 11 1 Page 3-4 76
3.4 The next three columns give the Effective Dose Equivalent due to Immersion in the plume, the Committed Effective Dose Equivalent due to inhalation, and the Effective Dose Equivalent due to ground deposition. These columns are provided for information only. 3.5 The final column at the top of the table gives the X/Q value in s/m 3 . This value should be provided to the State and Federal Emergency Response Officials when requested. For stability classes E, F, and G in MIXED MODE RELEASES, the X/Q is extremely small at the site boundary when compared with the other X/Q values. 3.6 The Dose Projection Summary Table also contains the Dose Projection Meteorology Data. 3.7 The reactor shutdown time is also found on this table. 3.8 The Projection Time which the Notification Form refers to is listed on the table as the Calculation Time. NOTE: The following two steps are very important for proper correlation between the dose projections performed by HBR's Dose Projection Team and the projections performed by State personnel. The Xe-133 Equivalent Release and the 1-131 Equivalent Release values are used by South Carolina Department of Health and Environmental Control for input into their dose assessment program. 3.9 The Xe-133 Equivalent Release is provided on this table and it is the value that should be entered as the Noble Gas Activity on the Notification Form. If any results are questionable, then Attachment 8.3.5.17 should be used to calculate this value. 3.10 The 1-131 Equivalent Release is provided on this table and it is the value that should be entered as the Iodine Activity on the Notification Form. If any results are questionable, then Attachment 8.3.5.17 should be used to calculate this value. 3.11 The Dosimeter Correction Factor that is provided on this table should only be used when the Radiological Control Manager has directed that a Dosimeter Correction Factor is necessary, and there is not adequate data to calculate one using environmental data. I EPRAD-03 Rev. 11 Page 3-42 of 3-76
NOTE: The Emergency Action Level provided by the dose projection program is for INFORMATION ONLY. All Emergency Classifications shall be made by using the EAL procedures. 3.12 Emergency Action Levels If an Emergency Action Level due to a dose projection is exceeded, the output screen will indicate the appropriate classification. Evaluate the EAL Flow Charts and compare the dose calculation against the EAL's to determine the Emergency Classification. Notify the RCM of all Emergency Action Levels that the program recommends. 3.13 HBRDOSE/RASCAL Attachment 8.3.6.16, HBRDOSE/RASCAL Comparison Matrix can be used to discuss differences in plant dose projections and those performed using the NRC's RASCAL program. 8.3.4 RECORDS N/A 8.3.5 ATTACHMENTS 8.3.5.1 Definitions and Abbreviations 8.3.5.2 General Information 8.3.5.3 Quality Codes 8.3.5.4 Core Uncovery Time Determination 8.3.5.5 Accident Mitigation Systems 8.3.5.6 Obtaining and Updating Meteorological Data EPRAD-03 Rev. 11 Page 3-43 of 3-76]
8.3.5.7 Source Term Determination 8.3.5.8 Flow Rates 8.3.5.9 Detector Sensitivities 8.3.5.10 Measuring Radiation Level on Main Steam Lines 8.3.5.11 Typical RMS Values 8.3.5.12 RMS Monitored Systems 8.3.5.13 Weather Service Data 8.3.5.14 Onsite Meteorological Data 8.3.5.15 Meteorological Forecast Form 8.3.6.16 HBRDOSE/RASCAL Comparison Matrix I EPRAD-03 Rev. 11 Page 3-44 of 3-76
ATTACHMENT 8.3.5.1 Page 1 of 3 DEFINITIONS/ABBREVIATIONS Definitions: Atmosphere Dispersion Factor (X/Q. - the fraction of activity released that will reach the point of interest (sec/m3). Committed Dose Equivalent- The dose equivalent to organs or tissue of reference that will be received from an intake of radioactive material by an individual during the 50 year period following the intake. Committed Effective Dose Equivalent - The sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues. Core Uncovery Time - The time that inadequate core cooing occurs until the time that adequate core cooling is restored. (See Attachment 8.3.5.4). Early Phase - The period at the beginning of a nuclear incident when immediate decisions for effective use of protective actions are required, and must be based primarily on predictions of radiological conditions in the environment. This phase may last from hours to days. For the purpose of dose projection, it is assumed to last for four days. Effective Dose Equivalent - The sum of the products of the dose equivalent to each organ and a weighting factor, where the weighting factor is the ratio of the risk of mortality from delayed health effects arising from irradiation of a particular organ or tissue to the total risk of mortality from delayed health effects when the whole body is irradiated uniformly to the same dose. This unit is considered equivalent to be the Deep Dose Equivalent for the purposes of dose projections because the external exposures are considered to be uniform across the whole body. I EPRAD-03 Rev. 11 Page 3-45 of 3-76]
ATTACHMENT 8.3.5.1 Page 2 of 3 DEFINITIONS/ABBREVIATIONS Intermediate Phase - The period beginning after the incident source and releases have been brought under control and reliable environmental measurements are available for use as a basis for decisions on additional protective actions and extending until these protective actions are terminated. This phase may overlap the early and late phases and may last from weeks to many months. For the purpose of dose projection, it is assumed to last for one year. Late Phase - The period beginning when recovery action designed to reduce radiation levels in the environment to permanently acceptable levels are commenced, and ending when all recovery actions have been completed. This period may extend from months to years (also referred to as the recovery phase). Release Duration - The period of time from the beginning of the release until the end of the release or the projected end of the release. This can be determined by estimating the completion of a damage control mission, performance of a repair to stop the release, or the estimated time until the RCS, CV Sump, or Steam Generator temperature is below 2000 F. Release Rate (Q) - The term in the dose projection which describes the amount of activity that is being released. This is recorded in Curies per second. The total curies released may be calculated from the release rate (Q) and the release duration in seconds. Total Effective Dose Equivalent - The sum of the deep-dose equivalent (for external exposures) and the committed effective dose equivalent(for internal exposures). Weathering/Weathering Factor - The fraction of radioactivity remaining after being affected by average weather conditions for a specified period of time. Abbreviations:
- 1. ALARA - As Low As is Reasonably Achievable
- 2. BSEP - Brunswick Steam Electric Plant
- 3. CDE - Committed Dose Equivalent
- 4. CFM - Cubic Feet per Minute
- 5. CPM - Counts Per Minute
- 6. CV - Containment Vessel
- 7. EAL - Emergency Action Level
- 8. EMT - Environmental Monitoring Team
- 9. EOF - Emergency Operations Facility
- 10. ERFIS - Emergency Response Facility Information System
- 11. ERO - Emergency Response Organization
- 12. GPM - Gallons Per Minute
- 13. HNP - Harris Nuclear Project
- 14. LAN - Local Area Network
- 15. LOCA - Loss Of Coolant Accident EPRAD-03 Rev. 11 Page 3-46 of 3-76]
ATTACHMENT 8.3.5.1 Page 3 of 3 DEFINITIONS/ABBREVIATIONS
- 16. PORV - Power Operated Relief Valve
- 17. RCS - Reactor Coolant System
- 18. RMS - Radiation Monitoring System
- 19. SDS - Satellite Display System
- 20. SRO - Senior Reactor Operator
- 21. SRV - Safety Relief Valve
- 22. STA - Shift Technical Advisor
- 23. TEDE - Total Effective Dose Equivalent EPRAD-03 Rev. 11 Page 3-47 of 3-761
ATTACHMENT 8.3.5.2 Page 1 of 1 GENERAL INFORMATION Backup Capability: If ERFIS or a computer with the dose projection program are not available, contact computer support personnel and request that they provide a computer with the current revision of the dose projection software installed on it. R-14 C, D, and E operate as follows: R-14C is the Normal range Noble Gas monitor. R-14D is the Intermediate range Noble Gas monitor. R-14E is the High range Noble Gas monitor. R-14D and R-14E normally read between 10 and 11 CPM. R-1 4C when increasing will reach its predetermined alarm setpoint. Further increase will cause R-1 4C to reach its predetermined swap-over setpoint. When the swap-over setpoint is reached, R-14C will fail to 1 Meg (1M) which also will cause R-14D and R-14E to activate and start providing intermediate and high range noble gas readings. If R-14C is reading 1 Meg, this SHOULD NOT be used as a valid reading and RMS data SHOULD BE obtained from R-14D and R-14E. Special attention should be paid to the quality code of the data on the program. Quality code color schemes are given in Attachment 8.3.5.3. In order to select an item when performing the dose projection press the space bar. Pressing the space bar will also deselect the item if it had already been selected. The help menu may be accessed at any time while using the dose projection program. This can be accomplished by pressing the Flfunction key. The function can be exited by clicking the mouse on the EXIT field or by pressing the F1 key. Messages are displayed at the bottom of each screen to describe the function that the cursor is on. Attachments 8.3.5.14, Onsite Meteorological Data, and 8.3.5.15, Meteorological Forecast Form, can be used to record weather conditions and forecast. I EPRAD-03 Rev. 11 Page 3-48 of 3-76
ATTACHMENT 8.3.5.3 Page 1 of 1 QUALITY CODES Color of Data Meaning Action Red Stars Computer Entered Bad Data Do Not Use This Data Green Computer Entered Good This Data May Be Used Data Normal Level Yellow Computer Entered Good This Data May Be Used Data Alert Level Red Computer Entered Good This Data May Be Used Data Alarm Level White Manually Entered Data This Data May Be Used I EPRAD-03 Rev. 11 Page 3-49 of 3-761
ATTACHMENT 8.3.5.4 Page 1 of 1 CORE UNCOVERY TIME DETERMINATION NOTE: The time determination below is based upon the core level and temperature that the core cooling is insufficient to prevent the cladding from overheating and failing. This basis is conservative for all fuel damage scenarios which result from core uncovery. This time can be determined by consulting a SRO or RO with access to plant data. Core uncovery time is defined for dose projection purposes to be the point in time that inadequate core cooling occurs until the time that adequate core cooling is restored. For the purposes of dose projection core uncovery time will be the time that a RED status occurs on the CORE COOLING critical safety function status tree until the tree conditions return to YELLOW status (core covered and core exit thermocouples < 7000 F). There are other possible accidents that may result in fuel damage. These events could be initiated by core flow blockage from debris or by localized melting from a rod ejection accident, pump failures, etc. as analyzed by the UFSAR. In this case, judgment may be applied using the bases information for CORE UNCOVERY TIME DETERMINATION above to most closely describe the fuel damage situation. In general choice of "uncovery < 30 min", corresponding to a release of 100% of the gap activity will conservatively account for most mechanical and miscellaneous fuel damage situations. I EPRAD-03 Rev. 11 1 Page 3-50 of 3-76
ATTACHMENT 8.3.5.5 Page 1 of 1 ACCIDENT MITIGATION SYSTEMS The capability to take credit for accident release mitigation systems is built into the dose projection program. Credit is given one of three ways, charcoal filtration, containment sprays, and water partitioning in the steam generator. NOTE: It is important to note that if the release is mitigated by ANY of the following: Charcoal Filtration, CV Sprays, or Partitioning, then assume mitigating effects are EFFECTIVE unless information is known to be otherwise. Only if the release pathway is direct to the environment without mitigation, should NOT EFFECTIVE be selected.
- Filtration Various fans can be aligned to cleanup effluent from leaking systems. When the release is passing through any one of the following fans, filtration can be considered effective. The general area(s) where the fan draws a suction is listed in parenthesis. - HVE-1A or HVE-1B (Containment Purge) - HVE-3 or HVE-4 (Containment Air, In pre-purge mode) - HVE-5A or HVE-5B (Auxiliary Building Exhaust) - HVE-15A (Spent Fuel Pit during refueling) - The CV Spray System The CV Spray System is designed to remove radioiodine from containment in the event a radioactive release (typically a LOCA) occurs inside containment. If such a release occurs and the CV Spray System (with NaOH added) is operating, then the CV Sprays are considered effective. - Water Partitioning Occurs during a release through the steam generators (e.g., a tube leak or tube rupture) and level in the affected steam generator is above the top of the tubes.
Partitioning is effective for removing iodines and some particulates when the steam generator level is greater than 10% on the Narrow Range Steam Generator Level Indicator. I EPRAD-03 Rev. 11 Page 3-51 of 3-76
ATTACHMENT 8.3.5.6 Page 1 of 5 OBTAINING AND UPDATING METEOROLOGICAL DATA In the manual data entry mode, meteorological data may not be available from ERFIS. Determine wind direction, wind speed, and atmospheric stability class using one of six methods listed in preferred order of use. NOTE: Meteorological data will normally display a green value and an "OK" quality code. If the values are displayed in white, or the quality code is "BAD", DO NOT USE THIS DATA.
- 1. If operable, use the data from control room readouts to obtain the atmospheric stability class, wind speed, and wind direction.
OR
- 2. Call the CP&L offsite meteorological contact (See ERO Phone Book for number).
NOTE: If The Florence Airport or the National Weather Service office is called, the only information that can be obtained is the wind direction, wind speed, and ambient temperature. Stability factor must be obtained from Step 5 of this Attachment. Ifwind speed and direction are only supplied for one point enter these values in both the elevated and ground fields. Do not enter wind gust as the wind speed, and if no Delta T is supplied do not enter one.
- 3. Call the Florence Airport for Weather Information (See ERO Phone Book for number).
OR EPRAD-03 Rev. 11 Page 3-52 of 3-76]
ATTACHMENT 8.3.5.6 Page 2 of 5 OBTAINING AND UPDATING METEOROLOGICAL DATA
- 4. Call the National Weather Service office in Columbia, South Carolina, for daily weather information or in Wilmington, North Carolina, for severe weather information. Use Attachment 8.3.5.13 to document this: (See ERO Phone Book for number)
OR
- 5. If there is no stability class data readily available, a general estimate of the current Atmospheric Stability Class can be made by visual observation, using the following table:
Rain, Sunny Cloudy Cloudy Clear Day or Day Day Night Night Night light wind or calm D B C E F (< 11.5 mph) moderately strong D C D D D wind(Ž_ 11.5 mph) OR EPRAD-03 Rev. 11 Page 3-53 of 3-76]
ATTACHMENT 8.3.5.6 Page 3 of 5 OBTAINING AND UPDATING METEOROLOGICAL DATA
- 6. A manual method may be used to acquire data from the meteorological tower.
The following method may be used to manually obtain this data: A. Obtain the Meteorological Tower Building key from E&RC or Plant Security. B. Locate the Met Tower recorder inside the building. C. Locate the Upper Display key on the recorder. D. Depress the Upper Display key one or more times until the Upper Display is placed in manual control. "MAN" will be displayed in the Lower Display of the recorder. E. Locate the Channel Up (CH Up) and Channel Down (CH Down) keys on the recorder. F. Using the Channel Up (CH Up) and Channel Down (CH Down) keys, scroll through the recorder channels to obtain the necessary information required on the "Manual Meteorological Collection Data Sheet" included in this attachment. G. Using the Differential Temperature values obtained from the recorder, determine the Stability Class as per the table included in this attachment. EPRAD-03 Rev. 11 Page 3-54 of 3-76
ATTACHMENT 8.3.5.6 Page 4 of 5 OBTAINING AND UPDATING METEOROLOGICAL DATA EXAMPLE OF RECORDER CHANNEL SELECTIONS CH 01 LT1 - Lower Temperature #1 ( ambient temperature) CH 02 DT1 - Differential Temperature #1 CH 03 DT2 - Differential Temperature #2 CH 04 LWS - Lower Wind Speed CH 05 LWD - Lower Wind Direction CH 06 UWS - Upper Wind Speed CH 07 UWD - Upper Wind Direction CH 08 DPT - Dew Point MANUAL METEOROLOGICAL COLLECTION DATA SHEET WIND SPEED UPPER WIND SPEED MPH LOWER WIND SPEED MPH WIND DIRECTION UPPER WIND DIRECTION DEGREES LOWER WIND DIRECTION DEGREES AMBIENT TEMPERATURE TEMPERATURE DEGREES F DIFFERENTIAL TEMPERATURE DT1= (C/100M DT2= C/1O00M STABILITY CLASS DT1 + DT2= C/100M 2 I EPRAD-03 Rev. 11 Page 3-55 of 3-76:
ATTACHMENT 8.3.5.6 Page 5 of 5 OBTAINING AND UPDATING METEOROLOGICAL DATA STABILITY CLASS DIFFERENTIAL TEMP. C/1OOM (circle one) A <-1.9 B -1.9 TO -1.7 C -1.7 TO -1.5 D -1.5 TO -0.5 E -0.5 TO +1.5 F +1.5 TO +4.0 G I EPRAD-03 Rev.1 1 Page 3-56 of 3-76
ATTACHMENT 8.3.5.7 Page 1 of 4 SOURCE TERM DETERMINATION Part A - Determination of Curies in Containment Atmosphere This calculation can be performed by obtaining the activity in the containment from the RCD or E&RC lead technician, or by calculating it using the radiation monitor data and their sensitivities. When calculations are performed utilizing radiation levels obtained from R-2, consideration should be given to background correcting the radiation level.
- 1) Containment atmospheric activity:
As determined by sampling CV atmosphere: ________________ ci/cc Calculation of atmospheric activity from a CV radiation monitor: Monitor Reading Sensitivity CV Activity R-12 cpm / ____cpm/(PCi/cc) = [____ici/cc R-2 mrem/hr / _ (mrem/hr)/(liCi/cc) = tVCi/cc R-32A/B rem/hr / - (rem/hr)/(ltCi/cc) = _IýCi/cc
- 2) Equation for determining curies in containment:
Curies in containment 1 = (CV activity [itCi/cc]) (5.7 x 104 [Ci-cc/LCi])
= ( [liCi/cc]) (5.7 x 10' [Ci-cc/VCi]) = _Ci
- This value can be determined by referencing the summary page of the RMS Detector Sensitivity Calculations. Volumes I and II of these calculations can be found in the EOF library. Ensure that the sensitivity that corresponds to the correct accident and shutdown time are used.
1 Containment volume as calculated per RNP-C/CONT-1 002, Determination of Containment Heat Sink, is 2.013 x 106 cubic feet (5.7 x 1010 cc). The value of 5.7 x 104 is used to account for [iCi to Ci conversion. EPRAD-03 Rev. 11 Page 3-57 of 3-76]
ATTACHMENT 8.3.5.7 Page 2 of 4 SOURCE TERM DETERMINATION Part B - Determination of Curies in the Reactor Coolant System (RCS) Obtain the RCS activity from the RCD or the E&RC lead technician to perform this calculation.
- 1) RCS activity: _ _ Ci/m iI
- 2) Equation for determining curies in the RCS:
Curies in RCS = (RCS activity [ltCi/ml]) (2.65 x 102 Ci-ml/l*Ci)
= ( .[liCi/ml]) (2.65 x 102 Ci-mIVICi) = _Ci Part C - Determination of Sump Source Term Obtain the sump activity and the sump volume from the RCD or the E&RC lead technician in order to perform this calculation.
- 1) Quantity of liquid in sump ga .I
- 2) Sump activity _ _LCi/c(
- 3) Equation for determining curies in sump:
Curies in the sump = (volume of liquid in sump [gal]) (activity of sump [lCi/ml]) (3.79 x 10-3)
= [gal]) ( [[pCi/ml]) (3.79 x 10-3 Ci-ml/,Ci-gal)
Ci Part D - Determination of Primary to Secondary Leakage Source Term Obtain the primary to secondary leak rate and RCS activity in order to perform this calculation.
- 1) Primary to Secondary Leakage gal/min
- 2) Source Term (Ci) = (Leakrate gal/min)(6.3E-5)(RCS Activity itCi/cc)
= ( gpm)(6.3E-5)( iLCi/cc) = ( Ci/sec)( hrs)(3600 sec/hr) =_ _ Ci EPRAD-03 Rev. 11 Page 3-58 of 3-76]
ATTACHMENT 8.3.5.7 Page 3 of 4 SOURCE TERM DETERMINATION Part E - Determination of Source Term Released Due To Secondary Leakage Determine the leakrate from the PORV or SRVs using Attachment 8.3.5.8. If the leak is due to a faulted Main Steam System obtain an estimate of the leakrate can be obtained from the Accident Assessment Team.
- 1) Secondary Leakrate _cc/sec
- 2) Source Term (Ci) =
mrem/hr x hr x cc/sec x 3.6E-03 Ci-sec/ltCi-hr R-31 Rad Level Duration Leakrate (m rem/h r)/(l. C i/cc) R-31 Sensitivity
= _ _ Ci
- This value can be determined by referencing the summary page of the RMS Detector Sensitivity Calculations. Volumes I and II of these calculations can be found in the EOF library. Ensure that the sensitivity that corresponds to the correct accident and shutdown time are used.
Part F - Determination of Source Term Released Through Main Steam Using Direct Survey Request that the RCD dispatch a member of the plant monitoring team with an extendable probe survey instrument to a location one level below the Main Steam lines as indicated by Attachment 8.3.5.10. The probe should be extended to a position adjacent to the low point of each steam line (or as directed by the Dose Projection Teamleader or RCD) to determine the contact dose rate. The status (open/closed) of the PORV and SRVs on the monitored lines should also be noted.
- 1) Contact radiation level on Steam Line: mrem/hr
- 2) Flow Rate: cc /sec (Attachment 8.3.5.8 or Accident Assessment Team)
- 3) Detector Sensitivity from Attachment 8.3.5.9: (mrem/hr)/([tCi/cc)
- 4) Source Term (Ci) =
mrem/hr x hr x cc*/sec x 3.6E-03 Ci-sec/ltCi-hr Rad Level Duration Flow Rate (mrem/hr)/(liCi/cc*) Detector Sensitivity
=__ Ci
- Substitute ml for cc when calculations are performed for water filled main steam lines.
I EPRAD-03 I Rev. 11 Page 3-5 76
ATTACHMENT 8.3.5.7 Page 4 of 4 SOURCE TERM DETERMINATION Part G - Determination of Source Term Released Plant Vent Stack Request that the RCD dispatch a member of the plant monitoring team with an extendable probe survey instrument to obtain a contact radiation level on the side of the plant stack (an instrument with a remote probe can also be used). The measurement should be made inside the shielded orifice which is approximately 4 feet above the Auxiliary Building roof on the south side of the stack.
- 1) Contact radiation level on Plant Vent Stack: mrem/hr
- 2) Release rate = (Use Attachment 8.3.5.8)
= (Stack Flow Rate [cfm]) (28320 [cc/ft 3 ]) (60 [min/hr]) - ( cfm) (28320 cc/ft 3) (60 min/hr) =_ _ cc/hr
- 3) Detector Sensitivity from Attachment 8.3.5.9: (mrem/hr)/(l Ci/cc)
- 4) Source Term (Ci) =
mrem/hr x hrx cc/hr x 1 E-06 Ci/!1 Ci Rad Level Duration Release Rate (mrem/hr)/( IýC i/cc) Sensitivity
=__ Ci I EPRAD-03 I Rev. 11 I Page 3-60 of 3-761
ATTACHMENT 8.3.5.8 Page 1 of 5 FLOW RATES R-11, R-12, R-14 HV E-2A/B ................................................................... 4.4 x 104 cfm HVE-2A/B and HVE-15/15A ........................................ 5.5 x 10 4 cfm HVE-2A/B and HVE-1A/B ............................................ 6.2 x 104 cfm HVE-2A/B and HVE-1A/B & HVE-15/15A .................. 7.2 x 104 cfm R-1 5, Air Ejector - Noble Gas Flow Rate = 3.10 x 102 cfM (for one vacuum pump running) Flow Rate = 6.10 x 102 cfm (for two vacuum pumps running) R-20, R-30, Fuel Building Basement Exhaust - Low and High Range Noble Gas Flow Rate = 1.0 x 10 4 cfm R-21, Fuel Building UPPER Level Exhaust Flow Rate = 1.34 x 104 cfm R-31A, R-31B, R-31C - Steam-Line Monitors (at 800 psi) PORV (100% lift) .................................... 1.92E06 cc/sec (4.57E05 Ibm/hr) PORV and 1 SRV .................................. 4.00E06 cc/sec (9.51 E05 Ibm/hr) PORV and 2 SRV ................................... 6.11E06 cc/sec (1.45E06 lbm/hr) PORV and 3 SRV .................................. 9.19E06 cc/sec (2.19E06 Ibm/hr) EPRAD-03 Rev. 11 Page 3-61 of 3-76]
ATTACHMENT 8.3.5.8 Page 2 of 5 FLOW RATES R-31A, R-31B, R-31C - Steam-Line Monitors (Filled with Water) PORV (100% lift) ............................................... 7.32E04 ml/sec PORV AND 1 SRV ........................................... 1.56EO5 ml/sec PORV AND 2 SRV ........................................... 2.42EO5 ml/sec PORV AND 3 SRV ........................................... 3.68EO5 ml/sec R-2, R-32A, R-32B - Containment Radiation Monitors Containment isolated with no discharge via plant vent .......... 1.5 CFM 1 Containment vented via plant vent ........................................ 2500 CFM 1 Design basis leakage for containment at 0.1% containment volume per day. EPRAD-03 Rev. 11 Page 3-62 of 3-76
ATTACHMENT 8.3.5.8 Page 3 of 5 FLOW RATES STEAM LINE FLOW RATE CALCULATION FOR A DRY STEAM GENERATOR 1.0
- 1. RCS Leak Rate (RCSLR) gpm
- 2. RCS Temperature OF
- 3. RCS Pressure psig
- 4. S/G Pressure psig
- 5. S/G Temp OF 2.0 1. From the Steam Tables determine the specific volume of RCS Fluid (RCSsv) at conditions in 1.0 ft3/Ib
- 2. From the Steam Tables determine the specific volume of S/G Fluid (SG sv) at condition in 1.0 ft3/lb 3.0 Determine the RCS Mass Release Rate (RCSMRR) into S/G by using the following formula:
RCSLR (gal/min )
= lb/min (7.48 gal/ft3 ) (RCSsv ft 3/lb)
( RCSLR gal/min) lb/min (7.48 gal/ft3) ( RCSsv ft 3/lb) 4.0 Determine the steam flow rate using the following formula: RCSMRR (lb/min) SGsv (ft3/Ib) (472 cc/sec) = cc/sec ft 3 /min ( ) J) (472 cc/sec) = RCSMRR (lb/min) SGsv (ft3/Ib) ft /min cc/sec 5.0 Performed by: Verified by: I EPRAD-03 Rev. 11 1 Page 3-63 of 3-76
ATTACHMENT 8.3.5.8 Page 4 of 5 FLOW RATES CONVERSION OF STEAM MASS FLOW RATE TO VOLUMETRIC FLOW RATE (1)
- 1. Obtain and record the steam mass flow rate in lbs/hr from the Accident Assessment Team.
_ _ lbs/hr [1]
- 2. Obtain and record the main steam pressure in psig.
_ Ipsig
- 3. Use the figure on the following page to determine the specific volume (cc/lb) for the pressure determined in step 2.
___ cc/lb [2]
- 4. Determine the volumetric flow rate using the following formula:
(lbs/hr) (1 hr/3600 sec) (cc/lb) = cc/sec (__ lb/hr) (1 hr/3600 sec) (__ cc/lb) = _ cc/sec [1] [2] Performed by: / Date Time Verified by: / Date Time (1) For use with R-31 readings under any conditions. I EPRAD-03 Rev.1 1 Page 3-64 of 3-76 1
ATTACHMENT 8.3.5.8 Page 5 of 5 FLOW RATES STEAM PRESSURE VS SPECIFIC VOLUME PSIG VS CC PER POUND PSIG 1200 1100 1000 900O 800 CC 700 600 w 500 I 400 ca 300 200 100 0 0 25 50 75 100 125 150 175 200 225 250 SPECIFIC VOLUME - CC/LB (THOUSANDS) I EPRAD-03 Rev. 11 Page 3-65 of 3-76
ATTACHMENT 8.3.5.9 Page 1 of 1 DETECTOR SENSITIVITIES Determine the appropriate accident scenario classification (1-10) utilizing the following table. ACCIDENT PLANT CONDITIONS FILTRATION/PARTITIONING/SPRAYS SCENARIO 1 Core not uncovered Effective or Not Effective 2 Core uncovered <30 minutes Effective 3 Core uncovered <30 minutes Not Effective 4 Core uncovered 0.5 - 1.8 hours Effective 5 Core uncovered 0.5 - 1.8 hours Not Effective 6 Core uncovered > 1.8 hours Effective 7 Core uncovered > 1.8 hours Not Effective 8 New Spent Fuel Effective or Not Effective 9 Old Spent Fuel Effective or Not Effective 10 Waste Gas Decay Tank Effective or Not Effective Determine the sensitivity of the appropriate detector using the following table and accident scenario. (These sensitivities are based on nuclide mixes at reactor shutdown) ACCIDENT PLANT VENT STEAM FILLEDMAIN STEAM WATER FILLED MAIN SCENARIO STACK(mrem/h r)/(ltCi/cc) LIN E(mrem/hr)/(liCi/cc) STEAM LIN E(mrem/hr)/(pCi/ml) 1 3.28E+02 1.49E+01 4.51 E+00 2 1.42E+03 7.11 E+01 2.15E+01 3 2.63E+03 9.66E+01 2.35E+01 4 1.40E+03 7.08E+01 2.16E+01 5 1.98E+03 7.94E+01 2.09E+01 6 1.40E+03 7.08E+01 2.15E+01 7 2.20E+03 8.24E+01 2.06E+01 8 2.80E+03 N/A N/A 9 5.44E+00 N/A N/A 10 2.48E-01 N/A N/A I EPRAD-03 Rev. 11 1 Page 3-66 of 3-76
ATTACHMENT 8.3.5.10 Page 1 of 1 MEASURING RADIATION LEVEL ON MAIN STEAM LINES Steel Support Wall To Turbine 11i 4" Platform Grating Reference Points
" B ", "C" ""Alt, EPRAD-03 Rev. 11 Page 3-67 of 3-76]
ATTACHMENT 8.3.5.11 Page 1 of 2 TYPICAL RMS VALUES The background and alarm setpoint for radiation monitors should be obtained from the control room or other current sources if they are needed to perform dose projections. The following two tables provide the typical values for the background and alarm setpoints for radiation monitors, however these values should not be used for performing dose projections unless no other data is available. Table 1 contains all of the radiation monitors that are used for dose projections, while Table 2 contains other monitors that may be of interest to the dose projection team. TABLE 1: RADIATION CHANNEL DESCRIPTION TYPICAL* SCALE MONITOR BKG/SETPOINT R2 CV LOW RANGE AREA - 10 / 100 mR/HR 0.1 - 10,000 mR/HR R12 CV AIR GAS -1 K/2.2KCPM 10 -10,000,000 CPM
= 1.8 times BKG R14C PLANT VENT GAS LOW 30-60/1-0,000 CPM 10 - 1,000,000 CPM Default 1 M in high range. switch to high range or 10 M at monitor - 700 k CPM all R-14 channels R14D PLANT VENT GAS MID 10-11 / 130 CPM 10 - 1,000,000 CPM Default 10 in low range R14E PLANT VENT GAS HIGH 10-11 / 140 CPM 10 - 1,000,000 CPM Default 10 in low range R15 CONDENSER AIR EJECTOR 10-15/1 00+BKG CPM 10 - 1,000,000 CPM R20 LOWER FUEL HANDLING 10-40 / 9,800 CPM 10 -10,000,000 CPM BUILDING low range R21 UPPER FUEL HANDLING 10-25 / 9,730 CPM 10 -10,000,000 CPM FUEL HANDLING R30 LOWER FUEL HANDLING - 0.5 /18+BKG mR/HR 1 - 100,000 mR/HR BUILDING high range R31A MAIN STEAM LINE A - 0.3 /12 mR/HR 1 - 100,000 mR/HR R31B MAIN STEAM LINE B - 0.4/12 mR/HR 1 - 100,000 mR/HR R31C MAIN STEAM LINE C - 0.6/12 mR/HR 1 - 100,000 mR/HR R32A CV HIGH RANGE <1/ 10&1,000 R/HR 1-10,000,000 R/HR R32B CV HIGH RANGE <11 10&1,000 R/HR 1-10,000,000 R/HR
- A printscreen can be performed on either the EDS terminal or ERFIS at the onset of an accident to provide more current backgrounds for monitors that are not yet being effected by the accident.
I EPRAD-03 Rev. 11 1 Page 3-68 of 3-76
ATTACHMENT 8.3.5.11 Page 2 of 2 TYPICAL RMS VALUES TABLE 2: RADIATION CHANNEL DESCRIPTION TYPICAL BKGISETPOINT SCALE -MONITOR R1 CONTROL ROOM AREA <1 / 2.5 mR/HR 0.1 - 10,000 mR/HR R3 PASS PANEL AREA 0.1-0.3/20 mR/HR 0.1 - 10,000 mR/HR R4 CHARGING PUMP AREA -4/50 mR/HR 0.1 - 10,000 mR/HR R5 SPENT FUEL BLDG. AREA <1 / 50 mR/HR 0.1 - 10,000 mR/HR R6 SAMPLING ROOM AREA <1 / 50 mR/HR 0.1 - 10,000 mR/HR R7 IN-CORE INSTRUMENT AREA -4 / 200 mR/HR 0.1 - 10,000 mR/HR R8 DRUMMING ROOM 1-2 / 50 mR/HR 0.1 - 10,000 mR/HR R9 LETDOWN LINE AREA 10-40/ 3000 mR/HR 1 - 100,000 mR/HR Ri1 CV AIR PARTICULATE -20 K / 3.6E4 CPM 10 - 1,000,000 CPM
= 1.8 times BKG R14A PLANT VENT PARTICULATE -500 / 2E6 CPM 10 - 1,000,000 CPM R14B PLANT VENT IODINE -10 / 90,000 CPM 10 - 1,000,000 CPM R16 HVH COOLING WATER -300 / 1,900 CPM 10 - 1,000,000 CPM R17 COMPONENT COOUNG WATER -300 / 830 CPM 10 - 1,000,000 CPM R18 LIQUID WASTE DISPOSAL -18,500/ VARIES 10 - 1,000,000 CPM R19A SG "A" BLOWDOWN <2,000/ -10 K CPM 10 -10,000,000 CPM R19B SG "B" BLOWDOWN <1,000/ -8 K CPM 10 -10,000,000 CPM R19C SG "C" BLOWDOWN <2,000/ -10 K CPM 10 -10,000,000 CPM R22P E&RC BLDG. PARTICULATE -300 / 10,000 CPM 1 - 1,000,000 CPM R221 E&RC BUILDING IODINE -15/300 CPM 1 - 1,000,000 CPM R22NG E&RC BUILDING NG -40 / 1,000 CPM 1 - 1,000,000 CPM R23P RADWASTE BLDG. PART. -60 / 9,700 CPM 1 - 1,000,000 CPM R231 RADWASTE BLDG. IODINE <10 / 1090 CPM 1 - 1,000,000 CPM R23NG RADWASTE BLDG. NG -20 / 387 CPM 1 - 1,000,000 CPM R33 MONITOR BLDG. AREA <1 / 10 mR/HR 1 - 100,000 mR/HR R37 COND. POLISHER -100 /18,500 CPM 10 -10,000,000 CPM R38P EOF PARTICULATE -900 / 32,000 CPM 10 - 1,000,000 CPM R381 EOF IODINE -10 / 802 CPM 10 - 1,000,000 CPM R38NG EOF NOBLE GAS -25 / 935 CPM 10 - 1,000,000 CPM EPRAD-03 Rev. 11 Page 3-69 of 3-76
6 C.0 C3 w, 0 Za 0 lCo (D m z m -Li CA)
-Cl C-) 4 c-,
Ic
*H444 I I
CD 0 CA) 44 (Y)
ATTACHMENT 8.3.5.13 Page 1 of 1 WEATHER SERVICE DATA
- 1. Call the Weather Service at the Florence Airport, Columbia, South Carolina or Wilmington, North Carolina. Ask for the forecaster on duty and identify yourself by saying, "This is (your name) at the Carolina Power & Light Company (CP&L)
H. B. Robinson Nuclear Plant. This is an emergency (or emergency drill). May I have the last hour surface weather observation from Florence, South Carolina?" If the last hour data is not available from Florence, then request the last hour surface weather observation from Columbia. The following data should be obtained: 1-Hour Forecast
- Station for which data is given - Wind Speed (MPH) - Cloud Cover (in tenths of total) - Cloud Ceiling (feet above ground) - Wind Direction (from N,S,E,W,etc.) - Wind Direction Trends (steady, shifting, variable) - Precipitation Activity - Probability of Precipitation
- 2. Also, obtain a 3 hour forecast for Florence from the meteorologist on duty.
3-Hour Forecast
- Station for which data is given - Wind Speed (MPH) - Cloud Cover (in tenths of total) - Cloud Ceiling (feet above ground) - Wind Direction (from N,S,E,W,etc.) - Wind Direction Trends (steady, shifting, variable) - Precipitation Activity - Probability of Precipitation
- 3. Other Information:
Date: Time: Name: I EPRAD-03 Rev. 11 Page 3-71 of 3-76 1
ATTACHMENT 8.3.5.14 Page 1 of 1 ONSITE METEOROLOGICAL DATA Date: Time Ground Wind Speed (mph) Elevated Wind Speed (mph) Ground Wind Dir. (From) Elevated Wind Dir. (From) AMB Temp. (OF) AT ("0/100m) Stability Class Time Ground Wind Speed (mph) Elevated Wind Speed (mph) Ground Wind Dir. (From) Elevated Wind Dir. (From) AMB Temp. (°F) AT (0/1100m) Stability Class I EPRAD-03 I Rev. 11 1 Page 3-72 of 3-76
ATTACHMENT 8.3.5.15 Page 1 of 1 METEOROLOGICAL FORECAST FORM Date: Time Issued: Issued By: Received By: Forecast Location: A) Next 1 Hour
- 1) Wind Direction: Sector Deg.
- 2) Winds Should Remain (Steady; Shifting; Variable) 2a) Variation Should Be Deg.
- 3) Wind Velocity: to - (MPH)
- 4) Stability Class
- 5) Precipitation Activity Will Be (None, Scattered, Steady)
- 6) Precipitation Type (Rain, Rainshowers, Thunderstorms, Ice, Snow)
- 7) Precipitation Intensity (Light, Moderate, Severe)
B) Next 3 Hours: C) Next 3 Days: D) Remarks: I EPRAD-03 Rev. 11 1 Page 3-73 of 3-76
ATTACHMENT 8.3.5.16 Page 1 of 2 HBRDOSE/RASCAL COMPARISON MATRIX [HBRDOSE RASCAL DIFFERENCES/COMMENTS EFFECTS EPA 400 Dose Yes Partial See Note 1 HBRDOSE will give higher ground exposure factors doses. Rascal will give higher external doses. TEDE may be affected in either direction. Reg Guide Yes No RASCAL uses a single equation with RASCAL generally will use higher X/Q values, 1.145 X/Qs non site-specific wake factors. Also, especially for ground level releases at closer probably doesn't use plume meander distances. When using default cap on Sigma z, default. RASCAL cap on Sigma z is Rascal will calculate higher doses during 500 m. R.G. 1.145 shows 3000 m. unstable met conditions. Deposition No Yes RASCAL calculates deposition as a NONE separate dose quantity, which does not effect TEDE. Depletion No No NONE Wet Deposition No Yes RASCAL uses a mass balance for RASCAL immersion and inhalation doses will wet deposition. be lower than HBRDOSE. RASCAL ground doses will be higher. Finite Model Yes Yes RASCAL converts to a semi-infinite Conversion point of finite model, semi-infinite model at Sigma y = 400 m. HBRDOSE model will cause negligible difference. RASCAL uses Sigma y = 500 m. RASCAL uses use of Sigma y instead of an average sigma as horizontal dispersion coefficient only in described in "Meteorology and Atomic Energy" determining plume size. HBRDOSE may cause a big difference in the calculated uses average Sigma. gamma dose for non-isotropic plumes. Decay for TAS Yes Yes NONE Downwind No No NONE Decay I EPRAD-03 Rev. 11 Page 3-74 of 3-76 1
ATTACHMENT 8.3.5.16 Page 2 of 2 HBRDOSE/RASCAL COMPARISON MATRIX _HBRDOSE[ RASCAL DIFFERENCES/COMMENTS EFFECTS Daughter No Yes RASCAL calculates ingrowth of HBRDOSE may underestimate doses, Ingrowth daughter decay products. particularly inhalation doses. Source Term RTM-92 NUREG- Different isotopes, RASCAL can During LOCA sequences, Spent Fuel accidents, 1228 dynamically calculate spectrum or Waste Gas Decay Tank rupture, there should based on particular accident be little difference. Other sequences may cause sequence. large differences. Uses monitor Yes No NRC will probably be doing worst NRC predicted dose will be higher. CP&L should reading for case analysis based on specific consider a method of providing gross noble gas, source term accident and PRA instead of actual iodine, and particulate release rates to the NRC. release. DO NOT ALLOW THE NRC TO USE THE EQUIVALENT RELEASE RATES CALCULATED BY HBRDOSE. Source term Yes Yes HBRDOSE uses gross (cpm or NRC results will not be available for several based on EMT mrem/hr) inputs. RASCAL requires hours, but may be more accurate. samples isotopic analysis. Intermediate Yes No NONE Phase Calculations Note 1: Dose factors for thyroid are identical between the two models. For external dose, RASCAL includes the contribution of short lived daughters in the external dose factors, which EPA-400 does not do. Similarly, RASCAL includes short lived daughter products in the inhalation and ground exposure dose factors. The most obvious result of this is that some of the noble gases (i.e. Kr-88), are included in inhalation and ground exposure dose in RASCAL. Ground exposure dose factors are calculated in RASCAL assuming a 0.3 cm/s deposition rate and further correction factor of 0.5 to account for rough ground. EPA-400 dose factors assume a deposition velocity of 1 cm/s for iodines and 0.1 cm/s for particulates with no correction factor. EPRAD-03 Rev. 11 Page 3-75 of 3-76
ATTACHMENT 8.3.5.17 Page 1 of 1 MANJAL CALCULATION OF CURIES RELEASED (FOR DOSE PROJECTION TEAM USE) Use this manual calculation for stability classes E, F, and G in MIXED MODE RELEASES when X/Q is extremely small at the site boundary when compared with the other X/Q values. The Xenon Dose Equivalent and the Iodine Dose Equivalent are the source term values used by South Carolina Department of Health and Environmental Control for input into their dose assessment program. Use the following formula, and the data from the most reasonable distance, to calculate Q in Curies. Q= [3600(D)] / [(1 000)(X/Q)(DCF)] where: Q = the calculated Dose Equivalent source term in Curies, 3600 converts the release from Ci/sec to Curies 1000 = millirem - rem conversion D = TEDE or thyroid CDE in mRem, both from the dose projection program printout, X/Q = the dispersion factor (from the same distance as the dose, D), DCF = the dose conversion factor (Rem per uCi - cm - hr); 20 for Xenon dose equivalent or 1.3 E +06 for Iodine dose equivalent. Q= [3600(D)] /[(1 000)(XIQ)(DCF)] Q = [3.6(D)] / [(X/Q)(DCF)] Q(Xe) = [3.6( )]/[( )(20)] = Curies Xe-1 33 Dose Equivalent Q(I) = [3.6( )]/ [( ) (1.3E+06)] = Curies Iodine Dose Equivalent I EPRAD-03 Rev. 11 Page 3-76 of 3-76 1}}