Category:Letter type:NG
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:NG"
The following 200 pages are in this category, out of 625 total.
(previous page) (next page)N
- NG-02-0037, Address Change for Attorney Alvin Gutterman of Record for Licensing Actions
- NG-02-0110, Technical Specification Change Request, Incorporation of Portions of Approved Technical Specifications Task Force (TSTF) Item TSTF-258, Revision 4 Into DAEC TS
- NG-02-0145, Response to Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.
- NG-02-0187, Startup Test Report for Extended Power Uprate - Phase I
- NG-02-0232, Technical Specification Change Request (TSCR-055): Deferral of Type a Containment Integrated Leak Rate Test (ILRT)
- NG-02-0237, Response to Request for Additional Information (RAI) for Technical Specification Change Request TSCR-048 - One-Time On-Line Safety-Related Battery Replacement.
- NG-02-0259, Submittal of Proposed Risk Informed Inservice Inspection Program for the Duane Arnold Energy Center
- NG-02-0268, License DPR-49 Relief Request NDE-R001 Revision 1 NDE-R028 Revision 2, NDE-R044 and NDE-R045
- NG-02-0358, Annual Radioactive Material Release Report for 2001
- NG-02-0364, License DPR-49, 2001 Annual Radiological Environmental Report
- NG-02-0390, April 2002 Monthly Operating Report for Duane Arnold Energy Center
- NG-02-0470, Quality Assurance Program
- NG-02-0533, Response to NRC Regulatory Issue Summary 2002-09: Preparation and Scheduling of Operator Licensing Examinations.
- NG-02-0574, June 2002 Monthly Operating Report for Duane Arnold
- NG-02-0622, 10CFR 50.46 Annual Report of Changes in Peak Cladding Temperature
- NG-02-0698, July 2002 Monthly Operating Report for Duane Arnold Energy Center
- NG-02-0767, Transmittal of Compliance with Order for Interim Safeguards Security Compensatory Measures for Duane Arnold Energy Center
- NG-02-1106, Single Failure-Proof Status of Reactor Building Crane
- NG-02-1121, Transmittal of Signed Indemnity Agreement Amendment
- NG-03-0055, Request for Additional Information Regarding TS Change Request: Deferral of Type a Containment Integrated Leak Rate Test
- NG-03-0114, January 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0123, Technical Specification Change Request (TSCR-059): Adoption of Generic Letter 96-03: 'Relocation of Pressure Temperature Limit Curves & Low Temperature Overpressure Protection System Limits.'
- NG-03-0168, Request for Operating License Change Single-Failure-Proof Reactor Building Crane
- NG-03-0186, February 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0257, Core Operating Limits Report for DAEC Cycle 19 Operation
- NG-03-0272, March 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0297, Response to Request for Additional Information Regarding Duane Arnold Energy Center Relief Requests NDE-R001, Revision 1 & NDE-R045
- NG-03-0308, Technical Specification Change Request (TSCR-063): Addition of Limiting Condition for Operation (LCO) 3.0.4 Exception to Condition a to LCO 3.7.5, Control Building Chiller System
- NG-03-0313, Response to Request for Additional Information on Technical Specification Change Request (TSCR-063): Addition of Limiting Condition for Operation (LCO) 3.0.4 Exception to Condition a to LCO 3.7.5, Control Building Chiller.
- NG-03-0332, 2002 Annual Radioactive Materials Release Report
- NG-03-0333, 2002 Annual Radioactive Environmental Monitoring Report
- NG-03-0344, Annual Financial Reports
- NG-03-0355, Ctr Technical Specification Change Request, Eliminate Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process
- NG-03-0356, April 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0373, LER 03-S01-00, Duane Arnold Unattended Safeguards Information Outside of the Protected Area Caused by Personnel Error
- NG-03-0441, Central Iowa Power Cooperative Decommissioning Trust Change in Trustee
- NG-03-0474, Revised Pages for General Electric Co. Report, GE-NE-A22-00100-08-01-R1, Pressure-Temperature Curves for Alliant Energy Duane Arnold Energy Center.
- NG-03-0489, June 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0509, Inservice Inspection Report
- NG-03-0527, Response to NRC Unresolved Item 50-331/03-02-039(DRS): Epoxy Floor Coatings
- NG-03-0528, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for Duane Arnold Energy Center
- NG-03-0563, Registration of Independent Spent Fuel Installation Storage Casks
- NG-03-0577, Evaluation of Indication in Dollar Weld HCC-B002
- NG-03-0579, Generic Letter 2003-01: Control Room Habitability 60-Day Response
- NG-03-0582, July 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0590, Final Response to Staff'S Request for Additional Information on License Amendment Request TSCR-059A
- NG-03-0642, August 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0654, Change of Commitment to Regulatory Guide 1.97
- NG-03-0685, Response to NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations.
- NG-03-0697, Report of Facility Changes, Tests, and Experiments, Fire Plan Changes and Commitment Changes
- NG-03-0717, September 2003 Monthly Operating Report for Duane Arnold
- NG-03-0719, Registration of Independent Spent Fuel Storage Installation Casks
- NG-03-0749, Registration of Independent Spent Fuel Storage Installation Casks
- NG-03-0766, Registration of Independent Spent Fuel Storage Installation Casks
- NG-03-0774, October 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0791, Registration of Independent Spent Fuel Storage Installation Casks
- NG-03-0843, November 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-03-0891, Response to NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System
- NG-04-0003, Clarification of Assumptions Regarding Reactor Building Crane
- NG-04-0028, December 2003 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0037, Response to Staffs Request for Additional Information (RAI) Re Technical Specification Change Request (TSCR-029) to Adopt Four Nuclear Regulatory Commission - Approved Generic Chances to Improved Technical Specifications
- NG-04-0081, Revision 149 to the Table of Contents, Revision 10 to EPIP 2.6, Revision 2 to EPIP ORAA-01, Revision 1 EPIP ORAA-02, Revision 1 to EPIP ORAA-03
- NG-04-0082, Request for Relief from ASME Section XI, Appendix Viii, Supplement 11 Requirements
- NG-04-0084, January 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0093, Revision 19 to EAL Table of Contents, Rev. 8 to EAL EBD-A, Rev. 5 to EAL EBD-F, Rev. 8 to EAL EBD-H, and Rev. 6 to EAL EBD-S
- NG-04-0103, Request to Implement NDE-R047 Addressing Boiling Water Reactor Shell Weld Inspection Recommendations of the Boiling Water Reactor Vessel & Internals Project (BWRVIP) Report BWRVIP-05
- NG-04-0111, License Amendment Request (TSCR-056): Elimination of License Condition 2.C.(2)(b) for Performance of Large Transient Tests for Extended Power Uprate.
- NG-04-0152, February 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0176, Request for Authorization of Alternative Regarding Pressure Test Requirements
- NG-04-0223, Emergency Planning Department Procedure Transmittal Acknowledgment Memo (TAM-125)
- NG-04-0271, Additional Information Regarding NRC Unresolved Item from Safety System Design and Performance Capability Inspection
- NG-04-0279, Annual Exposure Report - Form 5s
- NG-04-0323, Annual Radiological Environmental Operating Report
- NG-04-0324, 2003 Annual Radioactive Material Release Report
- NG-04-0332, April 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0378, May 2004 Monthly Operating Report for Duane Arnold
- NG-04-0436, June 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0453, Preparation and Scheduling of Operator Licensing Examinations
- NG-04-0478, Response to Request for Additional Information Regarding License Amendment Request (Tscr - 056): Elimination of License Condition 2.C.(2)(b) for Performance of Large Transient Tests for Extended Power Uprate
- NG-04-0485, Correction to 2003 Annual Materials Release Report
- NG-04-0494, July 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0519, Change in Schedule for Actions Required for Implementation of NRC Security Related Orders
- NG-04-0529, Revision to Emergency Action Levels
- NG-04-0539, August 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0550, Revision to Security Plan
- NG-04-0603, Quality Assurance Program Approval for Radioactive Transport Packages
- NG-04-0604, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for the Duane Arnold Energy Center
- NG-04-0610, Letter Dtd 9/29/04 from NMC - Duane Arnold Energy Center, Information Submitted in Support of June 1, 2004 Enforcement Conference
- NG-04-0656, Updated Security Plan
- NG-04-0670, Page Revision for Duane Arnold Energy Center Security Plan
- NG-04-0689, Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process
- NG-04-0694, October 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-04-0764, November 2004 Monthly Operating Report for Duane Arnold Energy Center
- NG-05-0010, Request for Segmented Review of License Amendment Request (Tscr - 056)
- NG-05-0049, Response to NRC Generic Letter 2003-001: Control Room Habitability - Design Bases, Licensing Bases and Inleakage Testing Results
- NG-05-0050, Inservice Testing Interval Extension
- NG-05-0065, January 2005 Monthly Operating Report for Duane Arnold Energy Center
- NG-05-0207, Core Operating Limits Report for DAEC Cycle 20 Operation
- NG-05-0263, 2004 Annual Radioactive Material Release Report
- NG-05-0264, 2004 Annual Radiological Environmental Operating Report
- NG-05-0284, 2004 Annual Financial Reports
- NG-05-0301, Response to NRC Guidance Regarding Mitigation Strategies
- NG-05-0388, Request to Extend the Third 10-Year Inservice Inspection (ISI) Interval for Reactor Vessel Welds VLA-A001 and VLA-A002
- NG-05-0400, Report of Facility Changes, Spent Fuel Storage Cask Design Changes, and Tests and Experiments
- NG-05-0412, Response to a Notice of Violation Contained in Inspection Report 05000331-05-010
- NG-05-0417, Request for Relief Regarding Limited Examination Coverage for Vessel Stabilizer Attachment Welds
- NG-05-0418, Response to a Notice of Violation Contained in Inspection Report 05000331-05-011
- NG-05-0419, Application for Order and Conforming Amendments for License Transfer
- NG-05-0420, Inservice Inspection Report
- NG-05-0427, Inservice Testing Program, Fourth Ten-Year Interval Update
- NG-05-0436, Supplement to the Response to a Notice of Violation Contained in Inspection Report 5000331/2005011
- NG-05-0467, Technical Specification Change Request (TSCR-076): Relaxation of Emergency Diesel Generator Testing Criterion.
- NG-05-0483, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature
- NG-05-0510, Response to Request for Additional Information Response to NRC Guidance Regarding Mitigation Strategies
- NG-05-0516, Startup Test Report for Extended Power Uprate - Phase II
- NG-05-0563, Supplemental Information in Support of Application for Order and Conforming Amendments for License Transfer
- NG-05-0594, Response to Request for Additional Information Related to Proposed Amendment Requesting Elimination of Main Steamline Radiation Monitor Trips
- NG-05-0611, Response to Staff Request for Additional Information Application for Order and Conforming Amendments for License Transfer
- NG-05-2161, FPL Energy Duane Arnold, LLC, Change in Commitment
- NG-05-2178, NG-05-2178 Dated December 12, 2005, Additional Information Regarding Unresolved Item 5000331/2005002-02
- NG-05-2186, Transfer of Quality Assurance Program Approval for Radioactive Material Packages Pursuant to 10 CFR 71.101(f), in Conformance with 10 CFR Part 50 License Transfer
- NG-05-2208, License Amendment Request Pursuant to 10 CFR 50.90: Revision to the Plant Reactor Pressure Vessel Material Surveillance Program (TSCR-081)
- NG-06-0005, Fourth Ten-Year Interval Inservice Testing Program Relief Requests
- NG-06-0045, Supplement to a Reply to a Notice of Violation; EA-04-053
- NG-06-0093, Correspondence Service List
- NG-06-0099, Disposition of Pending NRC Actions
- NG-06-0128, Condition (4) of Order Approving Transfer of DPR-049
- NG-06-0250, Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.1
- NG-06-0271, Affirmation of Letter of Intent to Transition to 10 CFR 50.48(c) - National Fire Protection Association Standard NFPA 805, Performance-Based Standards for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition
- NG-06-0282, Decommissioning Funding Status Report
- NG-06-0307, Response to Annual Assessment Letter, Substantive Cross Cutting Issue
- NG-06-0319, Response to Apparent Violation in Office of Investigations Report No. 3-2004-03; EA-06-047
- NG-06-0329, Correction to Response to Apparent Violation in Office of Investigations Report No. 3-2004-033: EA-06-047
- NG-06-0338, Duane Arnold - Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS:
- NG-06-0338, Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS: Section 3.0
- NG-06-0353, Annual Radioactive Material Release Report
- NG-06-0354, 2005 Annual Radiological Environmental Operating Report
- NG-06-0355, Fourth Ten-Year Interval Inservice Testing Program Relief Requests
- NG-06-0384, Additional Information Regarding Inservice Testing Program Relief Request VR-01
- NG-06-0387, Reply to Notice of Violation, EA-04-053
- NG-06-0427, Response to Request for Additional Information Related to the Proposed Amendment to Revise the Surveillance Requirements for the Emergency Diesel Generators to Provide More Margin to the Acceptance Criterion
- NG-06-0432, Annual Financial Reports
- NG-06-0439, Fourth 10-Year Inservice Inspection Plan
- NG-06-0472, Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.2
- NG-06-0490, Follow-up Response to Request for Additional Information Related to Proposed Amendment to Revise the Surveillance Requirements for the Emergency Diesel Generators to Provide More Margin to the Acceptance Criterion
- NG-06-0516, Response to Request for Additional Information Related to Proposed Amendment to Revise Limiting Condition for Operation 3.10.1
- NG-06-0601, Withdrawal of TSCR-076, Relaxation of Emergency Diesel Generator Testing Criterion.
- NG-06-0622, Request to Allow Use of the Provisions of IWA-4132 for the Remainder of the Third 10-Year Inservice Inspection Interval and the Fourth Ten-Year Inservice Inspection Interval
- NG-06-0633, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for Duane Arnold Energy Center
- NG-06-0733, Response to Request for Additional Information Related to Request for Relief Concerning Flow Measurement for the Standby Liquid Control Pumps
- NG-06-0822, Transmittal of Startup Test Report for Extended Power Uprate - Phase III
- NG-06-0856, Response to Request for Additional Information Related to Relief Request NDE-R001
- NG-06-0866, Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program
- NG-07-0006, 10 CFR 21 Notification - Identification of Defect
- NG-07-0063, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
- NG-07-0143, Request for Relief from the ASME Section XI Code to Allow Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment
- NG-07-0164, Request to Extend Third 10-Year Inservice Inspection (ISI) Interval for Reactor Vessel-Welds: VLA-A001, VLA-A002, VLB-AO01, VLB-A002, VLC-B001, VLC-B002, VLD-B001, VLD-B002, and VCB-C005
- NG-07-0176, Alternative to ASME Section XI Requirements to Use Code Cases N-504-2 and N-638-1 for Weld Overlay Repairs at the Duane Arnold Energy Center
- NG-07-0188, Response to Requests for Additional Information on Alternative to ASME Section XI Requirements to Use Code Cases N-504-2 and N-638-1 for Weld Overlay Repairs
- NG-07-0191, Response to Request for Additional Information on Alternative to ASME Section XI Requirements to Use Code Cases N-504-2 and N-638-1 for Weld Overlay Repairs at the Duane Arnold Energy Center
- NG-07-0253, Rev. 1 to Core Operating Limits Report for Cycle 21 Operation
- NG-07-0255, Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment
- NG-07-0257, Response to Request for Additional Information Regarding Proposed Technical Specification Changes
- NG-07-0270, Withdrawal of Relief Request to Allow Use of the Provisions of IWA-4132 for the Remainder of the Third 10-Year Inservice Inspection Interval and the Fourth Ten-Year Inservice Inspection Interval
- NG-07-0301, Decommissioning Funding Status Report
- NG-07-0321, 2006 Annual Radioactive Material Release Report
- NG-07-0322, Transmittal of Duane Arnold Energy Center 2006 Annual Radiological Environmental Operating Report & Offsite Dose Assessment Manual
- NG-07-0355, LER 07-S01-00 for Duane Arnold Regarding Unauthorized Person Allowed Entry to Duane Arnold Energy Center Protected Area
- NG-07-0367, Relief Request for Drywell Stabilizer Examinations
- NG-07-0368, Relief Request for 3rd Period Limited Weld Examinations
- NG-07-0377, Reply to a Notice of Violation; EA-07-017
- NG-07-0412, Response to Request for Additional Information Regarding License Amendment Request (Tscr - 056A): Elimination of License Condition 2.C.(2)(b) for Performance of Large Transient Tests for Extended Power Uprate
- NG-07-0470, Partial Withdrawal of Proposed Technical Specification Change Request (TSCR-083)
- NG-07-0481, Revised Decommissioning Funding Status Report
- NG-07-0492, Inservice Inspection Report
- NG-07-0493, Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability
- NG-07-0536, Technical Specification Change Request (TSCR-068): Add an Action Statement for Two Inoperable Control Building Chiller Subsystems to Technical Specifications Using Consolidated Line Item Improvement Process TSTF-477, Rev, 3
- NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).
- NG-07-0588, Relief Request for Seal Weld Procedure Qualification
- NG-07-0641, Response to Request for Additional Information Regarding License Amendment Request (TSCR-056A): Elimination of License Condition 2.C.(2)(b) for Performance of Large Transient Tests for Extended Power Uprate
- NG-07-0672, Preparation and Scheduling of Operator Licensing Examinations
- NG-07-0692, Fitness for Duty Performance Data for Six-Month Period Ending June 30, 2007
- NG-07-0729, Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12
- NG-07-0809, Response to Request for Additional Information Related to the Relief Request for 3rd Period Limited Weld Examinations
- NG-07-0848, Appointment of Richard L. Anderson as Duly Authorized Officer for the Duane Arnold Energy Center (DAEC) and Update of Correspondence Service List
- NG-07-0878, Second 10-Year Containment Inspection Plan
- NG-07-0933, Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment
- NG-08-0001, Response to Request for Additional Information Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Technical Specifications Under Technical Specifications..
- NG-08-0093, Response to Request for Additional Information Related to the Relief Request for Seal Weld Procedure Qualification
- NG-08-0109, Amendment Application Letter Dated February 19, 2008, Technical Specification Change Request (TSCR-101): Elimination of Emergency Diesel Generator Conditional Surveillance Requirement for Pre-planned Preventive Maintenance and Testing
- NG-08-0121, Ltr. 02/26/08 Duane Arnold Re Confirmation of Initial Operator License Re-Take Examination
- NG-08-0135, Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations
- NG-08-0137, Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval
- NG-08-0141, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20
- NG-08-0201, Revised Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval
- NG-08-0239, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
- NG-08-0278, Response to Request for Additional Information Related to Relief Requests MC-R001 and MC-P001
- NG-08-0303, Withdrawal of Technical Specification Change Request TSCR-094 Application for Technical Specification Improvement to Adopt TSTF-343, Revision 1, Containment Structural Integrity, to Add Exception for Visual Inspection of Containment
- NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . .
- NG-08-0345, Transmittal of 2007 Annual Radioactive Material Release Report and 2007 Annual Radiological Environmental Operating Report for Duane Arnold Energy Center (DAEC)