Category:Letter type:SVP
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:SVP"
The following 200 pages are in this category, out of 270 total.
(previous page) (next page)S
- SVP-00-018, Radioactive Effluent Report for January Through December 1999
- SVP-00-026, Changes to Emergency Plan Procedures
- SVP-02-001, Request for Code Relief, Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11, Examination
- SVP-02-003, December 2001 Monthly Operating Report for Quad Cities, Units 1 & 2
- SVP-02-006, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report
- SVP-02-008, Core Operating Limits Report for Cycle 17A
- SVP-02-024, Radioactive Effluent Report for January Through December 2001
- SVP-02-025, CFR50.46, 30-Day Report
- SVP-02-033, Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII
- SVP-02-035, March 2002 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-02-039, . Transmittal of 10CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, Annual Report
- SVP-02-040, Annual Radiological Environmental Operating Report for 2001
- SVP-02-041, Core Operating Limits Report Revision for Cycle 17A
- SVP-02-049, Day Post Outage ISI Letter
- SVP-02-057, Regulatory Commitment Change Summary Report
- SVP-02-059, Request for Scheduler Exemption for Performance of Reactor Pressure Vessel Nozzle-to-Vessel Weld & Nozzle Inside Radius Section Examinations Required by 10CFR 50.55a
- SVP-02-064, Core Operating Limits Report for Cycle 17A
- SVP-02-070, July 2002 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-02-072, Change of Commitment to Inspect And/Or Weld Overlay Repair Welds 02BS-F4, 02AS-S4 & 02AD-F12
- SVP-02-096, Request for Approval of Pipe Flaw Evaluation & GE Report GE-NE-0000-0009-4533-01, Quad Cities Unit 1 Evaluation of Indication in Weld 02BS-F4 in 28 Inch Recirculation Piping.
- SVP-02-102, Supplemental Request for Approval of Pipe Flaw Evaluation and Response to Request for Additional Information
- SVP-02-104, 10 CFR 50.46, 30-Day Report for Quad Cities Nuclear Power Station, Unit 1
- SVP-02-110, November 2002 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 & 2
- SVP-03-002, 10 CFR 50.59 Summary Report
- SVP-03-008, Quad-Cities, Units 1 & 2 Interval Inservice Inspection Program Plan
- SVP-03-019, Fourth Interval Inservice Inspection Program Plan
- SVP-03-033, Completion of Actions Associated with Supplement No.1 to Generic Letter 87-02: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue
- SVP-03-034, Day Post Outage ISI Letter
- SVP-03-042, February 2003 Monthly Operating Report for Quad Cities, Units 1 & 2
- SVP-03-054, March 2003 Monthly Operating Report for Quad Cities, Units 1 & 2
- SVP-03-060, Station'S Occupational Radiation Exposure Report for January Through December 2002
- SVP-03-063, Transmittal of 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, Annual Report for Quad Cities Nuclear Power Station, Units 1 & 2
- SVP-03-066, Annual Radiological Environmental Operating Report
- SVP-03-067, April 2003 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 & 2
- SVP-03-073, Core Operating Limits Report for Quad Cities Unit 1 Cycle 18A
- SVP-03-078, Core Operating Limits Report for Quad Cities Unit 2 Cycle 17A
- SVP-03-087, Notification of Changes to Emergency Response Data System
- SVP-03-091, July 2003 Monthly Operating Report for Quad Cities, Units 1 & 2
- SVP-03-096, Submittal of Proposed Relief Requests to the Requirements of 10 CFR 50.55a Concerning the Fourth Ten-Year Interval Inservice Testing Program
- SVP-03-097, Core Operating Limits Report for Quad Cities Unit 1 Cycle 18A (Revision 1)
- SVP-03-099, Regulatory Commitment Change Summary Report
- SVP-03-101, August 2003 Monthly Operating Report for Quad Cities, Units 1 and 2
- SVP-03-114, October 2003 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 & 2
- SVP-03-118, Transmittal of Lost Parts Analysis and Associated Operability Evaluation
- SVP-03-121, November 2003 Monthly Operating Report for Quad Cities Units 1 and 2
- SVP-04-009, December 2003 Monthly Operating Report for Quad Cities, Units 1 and 2
- SVP-04-012, Commitment to Communicate Decision as to Whether to Continue Efforts to Locate and Retrieve Missing Dryer Material
- SVP-04-017, January 2004 Monthly Operating Report for Quad Cities, Units 1 and 2
- SVP-04-029, February 2004 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-04-030, Letter Transmitting Core Operating Limits Report for Quad Cities, Unit 2, Cycle 18
- SVP-04-034, Radioactive Effluent Report for January Through December 2003
- SVP-04-040, Licensee Security Event Report 254/04-001, Failure to Adequately Monitor a Degraded Vital Area Barrier
- SVP-04-041, Occupational Radiation Exposure Report for January Through December 2003
- SVP-04-045, Annual Radiological Environmental Operating Report
- SVP-04-050, April 2004 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-04-065, June 2004 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2
- SVP-04-067, Regulatory Commitment Change Summary Report
- SVP-04-068, Commitment to Communicate Decision to Continue Efforts to Locate and Retrieve Missing Dryer Material
- SVP-04-071, July 2004 Monthly Operating Report for Quad Cities Units 1 and 2
- SVP-04-081, August 2004 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2
- SVP-04-088, September 2004 Monthly Operating Report for Quad Cities Nuclear Power Station Units 1 and 2
- SVP-04-094, October 2004 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-04-099, Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037
- SVP-04-104, November 2004 Monthly Operating Report for Quad Cities Units 1 & 2
- SVP-05-001, Summary Report of Changes, Tests, and Experiments Completed
- SVP-05-002, December 2004 Monthly Operating Report Quad Cities Nuclear Power Station Units 1 and 2
- SVP-05-009, January 2005 Monthly Operating Report Quad Cities Units 1 and 2
- SVP-05-018, February 2005 Monthly Operating Report for Quad Cities, Units 1 and 2
- SVP-05-024, March 2005 Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2
- SVP-05-026, Core Operating Limits Report for Plant Cycle 19
- SVP-05-027, Radioactive Effluent Report for January Through December 2004
- SVP-05-031, Occupational Radiation Exposure Report for January Through December 2004
- SVP-05-037, Annual Radiological Environmental Operating Report
- SVP-05-040, Core Operating Limits Report for Quad Cities Unit 2 Cycle 18 (Revision 1)
- SVP-05-043, Core Operating Limits Report for Plant Cycle 19, Rev 1
- SVP-05-049, Day Post Outage ISI Letter
- SVP-05-056, Provisional Variance Request from National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037
- SVP-05-058, Regulatory Commitment Change Summary Report
- SVP-05-059, Approval of Provisional Variance from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-05-071, Core Operating Limits Report for Quad Cities Unit 2 Cycle 18 (Revision 2)
- SVP-05-082, Main Steam Safety Valve Performance
- SVP-06-027, Core Operating Limits Report for Cycle 19
- SVP-06-028, Radioactive Effluent Report for January Through December 2005
- SVP-06-048, Annual Radiological Environmental Operating Report
- SVP-06-050, Core Operating Limits Report for Quad Cities Unit 2 Cycle 19 (Revision 1)
- SVP-06-057, Day Post Outage ISI Letter
- SVP-06-061, Groundwater Protection - Data Collection Questionnaire
- SVP-06-076, Reply to Notice of Violation; EA-06-112
- SVP-06-078, Provisional Variance from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-06-081, Extension of the Provisional Variance of National Pollutant Discharge Elimination System Permit No. IL0005037
- SVP-06-089, Core Operating Limits Reports (Revision 2)
- SVP-06-090, Response to NRC Triennial Fire Protection Baseline Inspection Report
- SVP-06-099, Request for Enforcement Discretion Technical Specification 3.1.7, Standby Liquid Control (SLC) System
- SVP-06-102, Regulatory Commitment Change Summary Report, Summary Information from June 1, 2005 Through May 31, 2006 Contained within the Report
- SVP-07-001, CFR 50.59/10 CFR 72.48 Summary Report for January 2004 to December 31, 2006
- SVP-07-004, Core Operating Limits Reports for Plant Cycle 19 (Revision 3)
- SVP-07-013, Core Operating Limits Reports Cycle 19 (Revision 2)
- SVP-07-025, Transmittal of Radioactive Effluent Report for January Through December 2006
- SVP-07-027, 90-Day Post Outage ISI Letter, Dated July 14, 2006
- SVP-07-029, Annual Radiological Environmental Operating Report for 2006
- SVP-07-031, Core Operating Limits Report for Quad Cities Unit 1 Cycle 20
- SVP-07-034, Core Operating Limits Report for Unit 1 Cycle 20 (Revision 1)
- SVP-07-049, Day Post Outage ISI Letter
- SVP-07-051, Provisional Variance from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-07-054, Core Operating Limits Report for Quad Cities Unit 2 Cycle 19 (Revision 4)
- SVP-07-060, Regulatory Commitment Change Summary Report
- SVP-07-069, Core Operating Limits Report, Cycle 20 (Revision 2)
- SVP-08-017, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for April 1, 2007 Through March 31, 2008
- SVP-08-021, Cycle 20 Core Operating Limits Report
- SVP-08-022, Transmittal of Radioactive Effluent Report for January 2007 Through December 2007
- SVP-08-023, Annual Radiological Environmental Operating Report
- SVP-08-033, 90-Day Post Outage ISI Letter
- SVP-08-034, Ltr. from T. Tulon to B. Booker Follow-up to Response to Violation Notice M-2008-02001, Quad Cities Nuclear Power Station
- SVP-09-001, CFR 50.59 / 10 CFR 72.48 Summary of Completed Changes, Tests, and Experiments Report
- SVP-09-016, Submittal of Radioactive Effluent Release Report for 2008
- SVP-09-022, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- SVP-09-028, Core Operating Limits Report Cycle 21
- SVP-09-045, Post Outage Inservice Inspection (ISI) Summary Report
- SVP-10-021, Annual Radiological Environmental Operating Report
- SVP-10-023, Core Operating Limits Report for Cycle 21
- SVP-10-024, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report
- SVP-10-031, Regulatory Commitment Change Summary Report
- SVP-10-044, Post Outage Inservice Inspection (ISI) Summary Report
- SVP-10-062, National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-11-001, 10 CFR 50.59/10 72.48 Summary Report
- SVP-11-021, Clarification of License Renewal Commitment Regarding Bellows Testing
- SVP-11-026, Regarding Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- SVP-11-029, Radioactive Effluent Release Report for 2010
- SVP-11-039, Annual Dose Report for 2010
- SVP-11-042, Annual Radiological Environmental Operating Report
- SVP-11-050, Regulatory Commitment Change Summary Report
- SVP-11-051, Submittal of Core Operating Limits Report, Cycle 22
- SVP-11-069, Post Outage Inservice Inspection (ISI) Summary Report
- SVP-11-082, Core Operating Limits Report Cycle 21 (Revision 1)
- SVP-12-028, Provisional Variance from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-12-029, Submittal of Core Operating Limits Report, Cycle 22
- SVP-12-033, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report
- SVP-12-041, Annual Dose Report for 2011
- SVP-12-045, Annual Radiological Environmental Operating Report
- SVP-12-048, License Renewal - Commitment Change in Accordance with NEI 99-04
- SVP-12-056, Submittal of Regulatory Commitment Change Summary Report
- SVP-12-057, Provisional Variance from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-12-062, Post Outage Inservice Inspection (ISI) Summary Report
- SVP-12-081, Provisional Variance (IEPA-12-19) from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-12-083, Extension of Provisional Variance (IEPA-12-19) from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-12-091, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation
- SVP-12-094, License Renewal Commitment for Evaluation of Operating Experience at Extended Power Uprate Levels Prior to Period of Extended Operation
- SVP-13-001, Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 2012
- SVP-13-019, Core Operating Limits Report Unit 1 Cycle 23
- SVP-13-022, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- SVP-13-031, Submittal of Radioactive Effluent Release Report for 2012
- SVP-13-032, Annual Dose Report for 2012
- SVP-13-037, Regulatory Commitment Change Summary Report
- SVP-13-044, Day Post Outage ISI Letter
- SVP-13-050, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report
- SVP-13-080, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report
- SVP-14-006, Illinois Environmental Protection Agency Violation Notice
- SVP-14-013, National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037
- SVP-14-025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
- SVP-14-027, Annual Dose Report for 2013
- SVP-14-031, Radioactive Effluent Release Report for 2013
- SVP-14-034, Core Operating Limits Report for Quad Cities Unit 2 Cycle 23
- SVP-14-036, Annual Radiological Environmental Operating Report for 2013
- SVP-14-042, Regulatory Commitment Change Summary Report
- SVP-14-049, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of RB-2 Welds
- SVP-14-057, Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities
- SVP-14-082, Registration of Use of Casks to Store Spent Fuel
- SVP-15-030, ISFSI Annual Radioactive Effluent Release Report
- SVP-15-032, Radioactive Effluent Release Report for 2014
- SVP-15-048, Submittal of Owner'S Activity Report Submittal Fifth 10- Tear Interval 2015 Refueling Outage Activities
- SVP-15-052, Submittal of Regulatory Commitment Change Summary Report
- SVP-15-061, Registration of Use of Casks to Store Spent Fuel
- SVP-15-062, Letter to Nmss/Dsfm from W. Beck/Exelon Generation Registration of Use of Casks to Store Spent Fuel, Dated October 30, 2015
- SVP-15-077, Registration of Use of Casks to Store Spent Fuel
- SVP-16-004, 2016 Quad Cities Nuclear Power Station Initial License Examination Proposed Exam Submittal Letter
- SVP-16-021, Core Operating Limits Report, Cycle 24
- SVP-16-026, Submittal of ISFSI Annual Radioactive Effluent Release Report for Period April 1, 2015 Through March 31, 2016
- SVP-16-030, Radioactive Effluent Release Report for 2015
- SVP-16-034, Annual Radiological Environmental Operating Report
- SVP-16-035, Core Operating Limits Report for Quad Cities Unit 1 Cycle 24, Revision 1
- SVP-16-041, Owner'S Activity Report and Fifth 10-Year Interval 2016 Refueling Outage Activities
- SVP-16-044, Deviation from BWR Vessel and Internals Project (Swavip) Guidelines Inspection Core Shroud Welds
- SVP-16-045, Registration of Use of Casks to Store Spent Fuel
- SVP-16-047, Regulatory Commitment Change Summary Report for June 2015 - May 2016
- SVP-16-057, Registration of Use of Casks to Store Spent Fuel
- SVP-16-065, Regarding Registration of Use of Casks to Store Spent Fuel
- SVP-16-071, Registration of Use of Cask to Store Spent Fuel
- SVP-16-075, Registration of Use of Casks to Store Spent Fuel
- SVP-17-002, O CFR 50.59 I 1 O CFR 72.48 Summary Report
- SVP-17-022, Core Operating Limits Report Cycle 25
- SVP-17-023, Supplemental Information Related to the Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 12
- SVP-17-029, Annual Dose Report for 2016
- SVP-17-032, Radioactive Effluent Release Report for 2016
- SVP-17-039, Submittal of Annual Radiological Environmental Operating Report
- SVP-17-043, Core Operating Limits Report for Quad Cities Unit 1, Cycle 25, Revision 1
- SVP-17-046, Regulatory Commitment Change Summary Report
- SVP-17-048, Owner'S Activity Report Submittal, Fifth 10-Year Interval 2017 Refueling Outage Activities
- SVP-18-020, Core Operating Limits Report for Quad Cities Unit 2 Cycle 25
- SVP-18-022, Unit 2 - Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory ...
- SVP-18-029, Submittal of Radioactive Effluent Release Report for 2017