RNP-RA/03-0085, June 2003 Monthly Operating Report for H. B. Robinson, Unit 2

From kanterella
Jump to navigation Jump to search
June 2003 Monthly Operating Report for H. B. Robinson, Unit 2
ML031970441
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/10/2003
From: Baucom C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/03-0085, TRM 6.2, TS 5.6.4
Download: ML031970441 (3)


Text

S 4-TS 5.6.4 TRM 6.2 aJ Progress Energy Serial: RNP-RA/03-0085 JUL 1 0 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc., submits the attached report of operating statistics and shutdown experience for the month of June 2003.

If you have any questions concerning this matter, please contact me.

Sincerely, C. T. Baucom Supervisor - Licensing/Regblatory Programs N

CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas. Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550

"'O

Attachment to Serial: RNP-RA/03-0085 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP). UNIT NO. 2 DATE 77/2003 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: JUNE 2003

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 720.00 4343.0 216140.99
4. HOURS GENERATOR ON LINE 720.00 4343.0 212821.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 522429.00 3214138.00 139151596.00

Attachment to Serial: RNP-RA/03-0085 Page 2 of 2 DOCKET NO.50-026 UNrT NAME HBRSEP. UNIr NO.2 DATE 7/07/03 COMPLETED BY llM SlURMA TELEPHONE (843)857-1086 REPORTING PERIOD: JUNE 2003 No. Date Type Duration Reason1 Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor or Reducing Power 2 5: Scheduled I2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual 6-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training &Ucense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUM MARY: The unit operated at approximately full power for the entire month.