P .

TS 5.6.4 TRM 6.2 C"' Progress Energy Serial: RNP-RA/03-0132 OCT 1 0 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual Section 6.2, "Monthly Operating Report," Progress Energy Carolinas, Inc.,

submits the attached report of operating statistics and shutdown experience for the month of September 2003.

If you have any questions concerning this matter, please contact me.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/jwv Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. P. Patel, NRC, NRR Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road

,,--a~4-Hartsville, SC 29550

Attachment to Serial: RNP-RA/03-0132 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP). UNIT NO. 2 DATE 10/912003 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: SEPTEMBER 2003

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 720.00 6551.0 218348.99
4. HOURS GENERATOR ON LINE 720.00 6551.0 215029.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 520176.00 4804049.00 140741507.00

Attachment to Serial: RNP-RA/03-0132 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP. UNIT NO. 2 DATE 10/09/03 COMPLETED BY TIM SURMA TELEPHONE (843) 857-1086 REPORTING PERIOD: SEPTEMBER 2003 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Comments F: Forced (Hours) the Reactor' S: Scheduled 2

Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & Ucense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at approximately full power for the entire month. There were no challenges to the pressurizer safety valves.