Category:Letter type:HNP
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:HNP"
The following 200 pages are in this category, out of 551 total.
(previous page) (next page)H
- HNP-00-008, Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter
- HNP-01-157, Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9)
- HNP-02-006, Withdrawal of License Amendment Request Technical Specifications 3/4.3.2, 3/4.3.3.1, 3/4.6.1.1, 3/4.6.1.7, 3/4.6.3, 3/4.9.4 & 3/4.9.9
- HNP-02-009, Supplemental Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles
- HNP-02-016, Annual Operating Report for 2001
- HNP-02-018, January 2002 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-02-033, Submittal of Revision 2 to the Physical Security and Safeguards Contingency Plan
- HNP-02-035, Twenty-day Response to Order for Interim Safeguards and Security Compensatory Measures for Shearon Harris Nuclear Power Plant
- HNP-02-049, Revised EPIP PEP-430, Rev 2, Routine Maintenance & Testing of Dialogic System.
- HNP-02-050, Request for License Amendment Startup Test Report
- HNP-02-051, Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End
- HNP-02-052, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
- HNP-02-055, NRC Correspondence Addressee Change Request
- HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 2001
- HNP-02-059, Annual Radiological Environmental Operating Report for 2001
- HNP-02-060, Annual Radioactive Effluent Release Report for 2001
- HNP-02-063, 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
- HNP-02-066, NPDES Permit Renewal Issued
- HNP-02-078, Request for Emergency License Amendment, Revises TSs 3/4.3.3.6
- HNP-02-088, Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2
- HNP-02-093, Request for License Amendment Technical Specifications 3/4.9.9
- HNP-02-095, Change to Emergency Plan Implementing Procedure
- HNP-02-113, Request for License Amendment, Response Time Testing Elimination
- HNP-02-115, On-Site Storage of Classified Information for the NRC
- HNP-02-118, 30-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs
- HNP-02-119, Notification of Full Compliance with Order for Interim Safeguards and Security Compensatory Measures
- HNP-02-124, Cycle 11, Startup Test Report Revision 1
- HNP-02-125, Emergency Core Cooling System Evaluation Changes
- HNP-02-126, Unit No.1, Application for TS Change Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process
- HNP-02-129, Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations.
- HNP-02-141, Request for License Amendment - Response Time Testing Elimination Supplemental Information
- HNP-02-142, Response to RAI Generic Ltr. 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions.
- HNP-02-150, Approval Requested to Use Later Edition & Addenda of OM Code Approved for Use by NRC for Pressure Relief Devices Subject to IST Requirements for Remainder of Second 10-Year IST Interval
- HNP-02-153, Request for Additional Information on Amendment Application Regarding Addition of Methodology References to the Core Operation Limits Report
- HNP-02-162, Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information
- HNP-02-164, Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
- HNP-02-172, Conversion to Improved Standard TS Schedule Change
- HNP-03-006, Request for License Amendment - Response Time Testing Elimination Supplemental Information
- HNP-03-014, Request for License Amendment TS 5.6.3.d
- HNP-03-015, TS Bases Change - Containment Isolation Valves
- HNP-03-017, Annual Operating Report - 2002
- HNP-03-019, Change to Emergency Plan Implementing Procedures
- HNP-03-020, January 2003 Monthly Operating Report for Shearon Harris
- HNP-03-022, NRC Correspondence Addressee Change Request
- HNP-03-028, Change to Emergency Plan Implementing Procedures
- HNP-03-033, NRC Correspondence Addressee Change Request
- HNP-03-043, Annual Environmental Operating Report
- HNP-03-044, Annual Radiological Environmental Operating Report, 2002
- HNP-03-049, March 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-03-057, April 2003 Monthly Operating Report for Shearon Harris
- HNP-03-061, Emergency Core Cooling System Evaluation Changes
- HNP-03-063, Day Special Report - Steam Generator Tubes Plugged
- HNP-03-067, May 2003 Monthly Operating Report for Shearon Harris
- HNP-03-074, Revised Epips, Including EPIP-PEP-260, Rev. 10, EPIP-PEP-270, Rev. 10 & EPIP-PEP-330, Rev. 6
- HNP-03-075, Cycle 12 Core Operating Limits Report
- HNP-03-079, June 2003 Monthly Operating Report for Shearon Harris
- HNP-03-080, Day Response to NRC Bulletin 2003-01 for Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
- HNP-03-081, Inservice Inspection Summary Report
- HNP-03-089, Response to Generic Letter 2003-01, Control Room Habitability, Sixty-Day Response
- HNP-03-093, Submittal of Revision 3 to the Physical Security and Safeguards Contingency Plan
- HNP-03-094, July 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-03-099, Partial Withdrawal of License Amendment Request Regarding Addition of Methodology References to the Core Operating Limits Report
- HNP-03-101, Withdrawal of License Amendment Request Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process
- HNP-03-107, August 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-03-111, Change to Emergency Plan Implementing Procedures for Shearon Harris
- HNP-03-114, Revision to the Cycle 12 Core Operating Limits Report
- HNP-03-115, September 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-03-118, 90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity
- HNP-03-122, Report of Changes Pursuant to 10 CFR 50.59
- HNP-03-138, November 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-03-140, Notification of NPDES Permit Proposed Change
- HNP-03-145, Revision 15 to PEP-310, Notifications and Communications.
- HNP-03-150, Partial Withdrawal of License Amendment Request Regarding Administrative Revision to the Technical Specification Index
- HNP-04-003, December 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-04-005, Supplemental Information to the RAI Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.
- HNP-04-006, Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers
- HNP-04-008, License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index
- HNP-04-014, Annual Operating Report - 2003
- HNP-04-047, NRC Correspondence Distribution List Update
- HNP-04-050, Change to Emergency Plan Implementing Procedures
- HNP-04-051, Annual Radioactive Effluent Release Report
- HNP-04-056, Annual Radiological Environmental Operating Report for 2003
- HNP-04-057, Annual Environmental (Non-Radiological) Operating Report
- HNP-04-060, Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval
- HNP-04-063, March 2004 Monthly Operating Report for Shearon Harris
- HNP-04-067, Shearon, Unit I Supplemental Response to the April 29, 2003, Order EA-03-086
- HNP-04-071, Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases
- HNP-04-075, Requested Additional Information for License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b
- HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results
- HNP-04-082, Supplemental Response to the April 29,2003, Order EA-03-086
- HNP-04-083, Day Special Report, Steam Generator Tube Plugging
- HNP-04-085, Emergency Core Cooling System Evaluation Changes
- HNP-04-088, May 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-04-090, Notification of Modification Activities Temporarily Affecting the Harris Nuclear Plant Emergency Response Data System
- HNP-04-093, Withdrawal of the Request for a License Amendment Regarding Technical Specification Surveillance Requirement 4.4.5.3a
- HNP-04-097, Day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-water Reactors
- HNP-04-099, Withdrawal of the Relief Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers
- HNP-04-105, NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations
- HNP-04-110, Security Order EA-03-086, Response to Request for Additional Information on Security Training and Qualification Plan
- HNP-04-118, July 2004 Monthly Operating Report for Shearon Harris
- HNP-04-122, Cycle 13 Core Operating Limits Report
- HNP-04-133, 60-Day Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections
- HNP-04-134, Response to Request for Additional Information Regarding NRC Bulletin 2004-01 for Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurized Penetrations and Steam Space Piping Connections at Pressurized-Water Reactor
- HNP-04-135, Response to Request for Additional Information Regarding NRC Bulletin 2003-01 for Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
- HNP-04-141, Security Order EA-03-086, Supplemental Response Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan
- HNP-04-148, Supplement to 180-Day Response to Generic Letter 2003-01, Control Room Habitability
- HNP-04-151, Technical Specification Bases Change: Undervoltage and Underfrequency - Reactor Coolant Pump Buses
- HNP-04-154, Day Summary Report NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity, Request (2)
- HNP-04-158, October 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-04-162, Notification of NPDES Permit Proposed Change
- HNP-04-165, Technical Specification Bases Change: Control Room Emergency Filtration System
- HNP-04-166, Day Report, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, Request (2)
- HNP-04-175, Conversion to Improved Standard Technical Specifications
- HNP-05-001, December 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-002, Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.1
- HNP-05-008, Notification of NPDES Permit Change
- HNP-05-014, January 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-016, Annual Operating Report - 2004
- HNP-05-018, Inservice Inspection Summary Report
- HNP-05-027, Notification of Modification Activities Temporarily Affecting the Harris Nuclear Plant Emergency Response Data System
- HNP-05-029, February 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-038, Annual Radioactive Effluent Release Report
- HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004
- HNP-05-044, Annual Radiological Environmental Operating Report
- HNP-05-045, March 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-049, Relief Request to Use a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds
- HNP-05-059, Emergency Response Data System (ERDS) Data Point Library Changes
- HNP-05-060, Accident Monitoring Instrumentation Special Report
- HNP-05-061, April 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-062, Request for License Amendment Technical Specifications (TS) 3/4.4.7 Temperature Limit for Reactor Coolant System Dissolved Oxygen
- HNP-05-067, Emergency Core Cooling System Evaluation Changes
- HNP-05-071, Response to February 25, 2005, NRC Letter, Subject: NRC Staff Guidance for Use in Achieving Satisfactory Compliance with February 25, 2002, Order Section B.5.b
- HNP-05-072, May 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-080, June 2005 Monthly Operating Report for Shearon Harris Nuclear Power Plant
- HNP-05-087, NRC Correspondence Distribution List Update
- HNP-05-092, Response to the Request for Additional Information on the Proposed License Amendment Request to Technical Specification
- HNP-05-100, Annual Radiological Environmental Operating Amended Report
- HNP-05-101, Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage No Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- HNP-05-109, NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator License Examinations
- HNP-05-128, Relief Request from Inservice Inspection Program No. 2R1-015 Alternative to ASME Code Section XI, IWA-4000 Requirements
- HNP-05-129, Response to the Request for Additional Information on the Proposed License Amendment Request to Technical Specifications 3/4.4.7 Temperature Limit for Reactor Coolant System Dissolved Oxygen
- HNP-05-130, Relief Requests No 2R1-016 Request for Relief from Inservice Inspection Requirements for Pressure Retaining Dissimilar Metal Welds and No 2R1-017 Request for Relief from Inservice Inspection Program Requirements for Reactor Vessel..
- HNP-05-143, Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools
- HNP-05-146, Response to NRC Letter Dated November 2, 2005, Request for Additional Information Regarding the February 2002, Order Section B.5.b
- HNP-06-004, Response to Request for Additional Information (RAI) Regarding the Request for a License Amendment to Use Fire-Resistive Electrical Cable
- HNP-06-007, Response to the Request for Additional Information on the Relief Request from Inservice Inspection Program No. 2R1-015 Alternative to ASME Code Section XI, IWA-4000 Requirements
- HNP-06-013, Systems Drawings Supporting License Renewal
- HNP-06-026, Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results
- HNP-06-027, Annual Report in Accordance with Technical Specification 6.9.1.2
- HNP-06-029, Day Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications.
- HNP-06-031, Notification of NPDES Permit Renewal Application
- HNP-06-032, Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.
- HNP-06-046, Annual Radioactive Effluent Release Report
- HNP-06-047, Change in Licensing Basis Compliance from 10 CFR 70.24 to 10 CFR 50.68
- HNP-06-050, Annual Environmental (Non-Radiological) Operating Report for 2005
- HNP-06-051, Annual Radiological Environmental Operating Report for 2005
- HNP-06-060, License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity
- HNP-06-061, Cycle 14 Core Operating Limits Report
- HNP-06-073, Day Special Report Steam Generator Tube Plugging During RFO-13
- HNP-06-074, Letter from David Corlett (Progress Energy) to Sunil Weerakkody (NRC) Regarding Frequently Asked Questions Regarding Transition to NFPA-805
- HNP-06-077, Emergency Core Cooling System Evaluation Changes
- HNP-06-079, Withdrawal of the Request for a License Amendment to Use Fire-Resistive Electrical Cable
- HNP-06-080, Shearon Harris Nuclear Power Plant, Unit, 60-Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized
- HNP-06-080, Unit, 60-Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water....
- HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant
- HNP-06-082, Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
- HNP-06-089, Response to Request for Additional Information Regarding License Amendment Request to Revise Values Associated with the Steam Generator Water Level (SGWL) Trip Setpoints
- HNP-06-091, Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves
- HNP-06-094, Groundwater Protection - Data Collection Questionnaire
- HNP-06-103, Withdrawal of Request for Approval of Changes Made to the Quality Assurance Program Description
- HNP-06-111, Response to NRC Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
- HNP-06-116, Response to Request for Additional Information Regarding License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity
- HNP-06-126, Response to Request for Additional Information (RAI) Regarding License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity
- HNP-06-127, Report of Changes Pursuant to 10 CFR 50.59
- HNP-06-136, License Renewal - Resolution of Confirmatory Items and License Renewal Application Amendment 7
- HNP-06-141, Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan
- HNP-06-150, License Amendment Request Technical Specification (TS) 6.12 High Radiation Area
- HNP-06-156, Changes to Emergency Plan; PLP-201, Rev 52 and Emergency Plan Implementing Procedures; PEP-110, Rev 16; PEP-230, Rev 14; PEP-240, Rev 9; PEP-270, Rev 17 and PEP-310, Rev 21
- HNP-07-004, Supplemental Information Regarding GL-96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.
- HNP-07-005, Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5
- HNP-07-011, NRC Correspondence Distribution List Update
- HNP-07-013, Annual Report in Accordance with Technical Specification 6.9.1.2 for 2006
- HNP-07-015, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
- HNP-07-026, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
- HNP-07-029, Notification of NPDES Permit Renewal
- HNP-07-032, License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes
- HNP-07-033, Response to the Request for Additional Information Regarding the License Amendment Request to Revise Values Associated with the Steam Generator Water Level Trip Setpoints
- HNP-07-040, Request for License Amendment to Use Other Containment Sump Water Level Instruments
- HNP-07-041, Inservice Inspection Relief Request 1, Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs
- HNP-07-042, Revision of the Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan
- HNP-07-044, Annual Environmental (Non-Radiological) Operating Report for 2006
- HNP-07-045, Annual Radiological Environmental Operating Report for 2006
- HNP-07-046, Annual Radioactive Effluent Release Report for 2006
- HNP-07-051, Submittal of Information in Support of NFPA 805 Pilot Observation Reviews
- HNP-07-061, G20060793 - C. S. Hinnant Ltr Shearon Harris, Unit 1, Response to Request for Comment on Proposed Director'S Decision Under 10 CFR 2.206
- HNP-07-067, 90-Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
- HNP-07-068, Day Special Report of the Metal Impact Monitoring System
- HNP-07-073, Withdrawal of the Relief Request from ASME Code Inservice Testing Requirements for the Second 10-Year Interval
- HNP-07-083, Emergency Core Cooling System Evaluation Changes
- HNP-07-087, License Renewal Application - Responses to Requests for Additional Information 2.1-1 and 3.0-1