Category:Letter type:PNP
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:PNP"
The following 200 pages are in this category, out of 468 total.
(previous page) (next page)P
- PNP 2011-002, License Amendment Request for Spent Fuel Pool Region I Criticality
- PNP 2011-005, Completion of License Renewal Commitment - Charging Line Evaluation
- PNP 2011-006, ASME Section XI 90-Day Inservice Inspection Summary Report
- PNP 2011-009, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor
- PNP 2011-016, 2011 Personnel Exposure and Monitoring Report
- PNP 2011-018, Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years
- PNP 2011-020, 2010 Personnel Exposure and Monitoring Report
- PNP 2011-023, ISFSI Annual Radioactive Effluent Release Report
- PNP 2011-025, Report of Changes, Tests and Experiments and Summary of Commitment Changes
- PNP 2011-027, Withdrawal and New Commitment for Program Plan for Aging Management of Reactor Vessel Internals
- PNP 2011-028, Response to Request for Additional Information and Revision to the Pnp Cyber Security Plan
- PNP 2011-030, Completion of Activities to Support Entry Into the Period of Extended Operation
- PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases
- PNP 2011-033, Generator Tube Inspection Report
- PNP 2011-034, Request for Relief from ASME Code, Section XI, Requirements for Reactor Pressure Vessel Shell-To-Flange Weld Examination
- PNP 2011-035, Withdrawal of License Amendment Request for Steam Generator Cold-Leg Tubesheet Inspection
- PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report
- PNP 2011-037, & ISFSI, Submittal of 2010 Radiological Environmental Operating Report
- PNP 2011-038, 2010 Annual Radioactive Effluent Release and Waste Disposal Report
- PNP 2011-040, Emergency Response Data System (ERDS) Changes
- PNP 2011-042, Submittal of 2010 Annual Personnel Exposure and Monitoring Report
- PNP 2011-043, 2010 Radiological Environmental Operating Report
- PNP 2011-044, Response to Request for Additional Information for Pressurized Thermal Shock Evaluation
- PNP 2011-047, Annual Report of Changes in Emergency Core Cooling System Models for Large and Small Break LOCA
- PNP 2011-049, Security Plan, Revision 12
- PNP 2011-050, Request for Extension of Enforcement Discretion and Commitment to Submittal Date for 10 CFR 50.48(c) License Amendment Request
- PNP 2011-051, 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
- PNP 2011-056, Day Response to NRC Bulletin 2011-01, Mitigating Strategies
- PNP 2011-057, Minor Errors Identified in Spent Fuel Pool Region I LAR Criticality Analysis
- PNP 2011-058, License Amendment Request to Revise Calculated Peak Containment Internal Pressure
- PNP 2011-061, Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations
- PNP 2011-062, Security Plan Revision 13
- PNP 2011-063, Response to Request for Additional Information - Steam Generator Tube Inspection Report
- PNP 2011-064, Response to Request for Additional Information - License Amendment Request for Spent Fuel Pool Region I Criticality
- PNP 2011-067, Response to Request for Additional Information - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years
- PNP 2011-070, Response to Request for Additional Information for License Amendment Request to Revise Calculated Peak Containment Internal Pressure (ME6875)
- PNP 2011-071, Special Report of Inoperability of High Range Noble Gas Monitor
- PNP 2011-079, Request Registration to Use Approved Spent Fuel Storage Casks at Palisdes Nuclear Plant ISFSI
- PNP 2011-080, Reply to Apparent Violation EA-11-227 in Inspection Report 2011013
- PNP 2011-089, Commitment Revision Letter
- PNP 2011-100, Response to Request for Additional Information Regarding Security Plan Revision 14 (U)
- PNP 2012-003, Change in Dates for Initial Licensed Operator Examinations
- PNP 2012-004, Registration of NUHOMS-24PTH Casks
- PNP 2012-005, License Amendment Request - Replacement of Spent Fuel Pool Region 1 Storage Racks
- PNP 2012-007, Special Report for Inoperability RIA-2327 of High Range Noble Gas Monitor
- PNP 2012-009, Updated SDP Assessment of DC Panel D11-2 Fault
- PNP 2012-014, Commitment Revision Letter
- PNP 2012-015, Transmittal of Fitness for Duty Program Performance Report for the Period of January 1, Through December 31, 2011
- PNP 2012-018, ISFSI Annual Radioactive Effluent Release Report
- PNP 2012-021, Notification of Deviation from EPRI Steam Generator Management Program: PWR Steam Generator Examination Guidelines: Revision 7
- PNP 2012-023, Entergy Letter on Radiological Data for September 26, 2011
- PNP 2012-024, Response to Request for Additional Information Regarding License Renewal Commitment for Alloy 600 Program
- PNP 2012-026, End of Cycle Slide Presentation
- PNP 2012-027, Answer to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049)
- PNP 2012-028, Answer to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- PNP 2012-029, 30-Day Response to March 12, 2012, Information Request
- PNP 2012-030, Submittal of 30-Day Report of Change in Emergency Core Cooling System Model
- PNP 2012-031, Revision to Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations
- PNP 2012-032, & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report
- PNP 2012-033, Submittal of 2011 Radiological Environmental Operating Report
- PNP 2012-034, Entergy Nuclear Operations, Inc. 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments
- PNP 2012-035, Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2012-042, 2011 Personnel Exposure and Monitoring Report
- PNP 2012-045, Readiness for 95001 Inspection
- PNP 2012-046, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones
- PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 3
- PNP 2012-049, Response to NRC Request for Information Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2012-050, Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments
- PNP 2012-051, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2012-053, ISFSI Security Plan Revision 6 (U)
- PNP 2012-055, Request for Exemption from Emergency Planning and Preparedness Requirements
- PNP 2012-056, Revised Commitment Date for Program Plan for Aging Management of Reactor Vessel Internals Submittal
- PNP 2012-058, Voluntary Response to NRC Regulatory Issue Summary 2012-07; Preparation and Scheduling of Operator Licensing Examinations
- PNP 2012-059, 60-Day Reports Per Bulletin 2004-01 and CAL No NRR-07-023 Pressurizer Inspection Results for the 2012 Refueling Outage
- PNP 2012-061, 120-Day Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2012-062, Initial License Examination Outline
- PNP 2012-063, Reply to Request for Information
- PNP 2012-064, Safety Injection Refueling Water Tank Leakage and Corrective Actions
- PNP 2012-065, Readiness for 95002 Supplemental Inspection
- PNP 2012-066, NRC Confirmatory Order EA-11-214 Section V, Actions 4, 5 and 6; Results of Actions Taken Available for NRC Inspection
- PNP 2012-068, Initial Operator License Examination Materials
- PNP 2012-069, ASME Section XI 90-Day Inservice Inspection Summary Report
- PNP 2012-071, Response to Request for Additional Information License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
- PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers
- PNP 2012-078, Security Plan Revision 14, Cover Letter
- PNP 2012-080, Revised Program Plan for Aging Management of Reactor Vessel Internals
- PNP 2012-084, Transmittal of Public Meeting Slides for 09/12/2012 Meeting
- PNP 2012-087, Proposed Alternative - Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW136
- PNP 2012-091, Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- PNP 2012-092, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
- PNP 2012-093, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System
- PNP 2012-094, 2012 Steam Generator Tube Inspection Report
- PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases
- PNP 2012-099, Response to Third Request for Additional Information on License Amend Request Re Replacement of Spent Fuel Pool Region I Storage Racks
- PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2012-105, Supplement to License Amendment Request - Cyber Security Plan Implementation Schedule Milestones
- PNP 2012-106, License Amendment Request to Adopt NFPA 805 Performance- Based Standard for Fire Protection for Light Water Reactors
- PNP 2012-107, Withdrawal of Proposed Alternative - Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW136
- PNP 2012-108, Change of Commitment in Submittal for Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting
- PNP 2013-002, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach
- PNP 2013-007, Emergency Plan, Revision 23
- PNP 2013-009, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- PNP 2013-010, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- PNP 2013-011, 2013 Palisades Nuclear Plant Initial License Re-Take Examination Proposed Examination Submission
- PNP 2013-013, Response to Clarification Request - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2013-015, Entergy Nuclear Operations, Inc. Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
- PNP 2013-016, 2012 ISFSI Annual Radioactive Effluent Release Report
- PNP 2013-017, Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
- PNP 2013-018, Fitness for Duty Program Performance Report for the Period of January 1, Through December 31, 2012
- PNP 2013-021, Response to Request for Additional Information on 2012 Refueling Outage Steam Generator Inspection Report
- PNP 2013-022, Response to Request for Additional Information - Revised Program Plan for Aging Management of Reactor Vessel Internals
- PNP 2013-024, Response to NRC Letter, Palisades Nuclear Plant - Summary of Conference Call Regarding the Spring 2012 Steam Generator Inspections (TAC ME8129).
- PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application
- PNP 2013-028, 10 CFR 50 Appendix G Equivalent Margins Analysis
- PNP 2013-029, Relief Request Number RR 4-16. Proposed Alternative, Alternate Leak Repair Addition of Safety Injection and Refueling Water Tank Bottom Liner, Fourth 10-Year Inservice Inspection Interval
- PNP 2013-030, License Termination Plan, Revision 3
- PNP 2013-031, Report of Changes in Emergency Core Cooling System Models
- PNP 2013-032, Letter from A. Vitale, Site Vice President, to C. Casto, Regional Administrator, Region III, Dated April 25, 2013; Subject: NRC Confirmatory Order EA-11-214; Palisades Nuclear Plant
- PNP 2013-033, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2013-034, 2012 Personnel Exposure and Monitoring Report
- PNP 2013-037, 2012 Radiological Environmental Operating Report
- PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report
- PNP 2013-041, Supplemental Information to Generic Safety Issue-191 Closure Option
- PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report
- PNP 2013-043, Radiological Environmental Operating Report, January 1, 2012 Through December 31, 2012
- PNP 2013-044, License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times
- PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation
- PNP 2013-050, Confirmatory Action Letter - Revision of Commitments to Address Safety Injection Refueling Water Tank and Control Room Concrete Support Structure Leakage
- PNP 2013-051, Voluntary Responses to NRC Regulatory Issue Summary 2013-06: Preparation and Scheduling of Operator Licensing Examinations
- PNP 2013-053, Retraction of Relief Request Number RR 4-16, Proposed Alternative, Alternate Leak Repair Addition of Safety Injection and Refueling Water Tank Bottom Liner, Fourth 10-Year Inservice Inspection Interval
- PNP 2013-057, Ventilation Storage Cask Inspection Summary Report
- PNP 2013-058, Response to NRC Letter Requesting an Online Reference Portal for Order EA-12-049 Overall Integrated Plan Documentation
- PNP 2013-060, Response to Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times
- PNP 2013-061, Response to Request for Additional Information for the Overall Integrated Plan in Response to the Commission Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
- PNP 2013-063, Unsatisfactory Laboratory Testing Report
- PNP 2013-064, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- PNP 2013-065, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- PNP 2013-068, Completion of Commitment for NRC Meeting Concerning Generic Safety Issue-191
- PNP 2013-069, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sit
- PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes
- PNP 2013-074, Notification of Commitment Changes
- PNP 2013-075, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2013-076, License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process
- PNP 2013-077, 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure
- PNP 2013-079, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2013-082, Relief Request Number 4-17, Proposed Alternative, Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW135
- PNP 2013-083, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2013-084, Response to Request for Additional Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements
- PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule
- PNP 2013-092, Schedule for Generic Safety Issue - 191 Resolution
- PNP 2014-001, Response to Second Request for Additional Information Reactor Vessel Internals - ME9569
- PNP 2014-003, Response to December 16, 2013 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times
- PNP 2014-004, Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on - Request for Additional Information - Reactor Vessel Internals - ME9569 Response Schedule
- PNP 2014-006, Response to NRC Order EA-12-155
- PNP 2014-007, Response to Request for Additional Information - NRC Bulletin 2012-01
- PNP 2014-008, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin Assessments
- PNP 2014-009, 40-Year Containment Tendon Surveillance Report
- PNP 2014-011, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- PNP 2014-014, 2013 ISFSI Annual Radioactive Effluent Release Report
- PNP 2014-015, Relief Request Number RR 4-18 - Proposed Alternative Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-018, 2013 Personnel Exposure and Monitoring Report
- PNP 2014-019, Relief Request Number RR 4-19 Proposed Alternative to the Requirements of ASME Code Case N-638-4
- PNP 2014-021, Response to Request for Additional Information Dated February 26, 2014 for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-022, Response to Second Request for Additional Information Dated February 27, 2014 for Relief Request RR 4-18 - Proposed Alternative Use of ASME Code Case N-770-1 Baseline Examination
- PNP 2014-024, Response to Request for Additional Information Dated February 28, 2014 for Relief Request Number RR 4-19, Proposed Alternative to Requirements of ASME Code Case N-638-4
- PNP 2014-028, Supplemental Response to Request for Additional Information Dated February 26, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-029, Response to Third Request for Additional Information Dated March 5, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-030, Second Supplemental Response to Request for Additional Information Dated February 26, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-031, Response to Fourth Request for Additional Information Dated March 11, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
- PNP 2014-032, Annual Report of Changes in Emergency Core Cooling System Models 041014
- PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.
- PNP 2014-035, Revised Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2014-036, 10-Day Response to an Apparent Violation in IR 2014406; EA-14-013
- PNP 2014-037, 2013 Personnel Exposure and Monitoring Report
- PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor
- PNP 2014-040, 2013 Radiological Environmental Operating Report
- PNP 2014-041, 2013 Radiological Environmental Operating Report
- PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process
- PNP 2014-044, & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report
- PNP 2014-045, 2013 Annual Non-radiological Environmental Operating Report
- PNP 2014-046, 30-Day Report of Changes in Emergency Core Cooling System Models
- PNP 2014-048, Initial License Examination Outline
- PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.
- PNP 2014-050, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times
- PNP 2014-052, Response to Request for Additional Information for License Amendment Request - Cyber Security Plan Implementation Schedule
- PNP 2014-054, Response to NRC Request for Additional Information - 10 CFR 50 Appendix G Equivalent Margin Analysis - Mf 2962
- PNP 2014-055, ASME Section XI 90-Day Inservice Inspection Summary Report
- PNP 2014-056, Reply to Non-Cited Violation, Failure to Complete Volumetric Examinations for DM Butt Welds in Branch Connections, 05000255/2014002-02
- PNP 2014-061, Voluntary Response to NRC Regulatory Issue Summary 2014-05: Preparation and Scheduling of Operator Licensing Examinations
- PNP 2014-063, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors
- PNP 2014-066, Supplemental Response to NRC Request for Additional Information - Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margin Analysis - Mf 2962
- PNP 2014-067, Response to Third Request for Additional Information - Reactor Vessel Internals (ME9569)
- PNP 2014-069, Reply to Inspection Report 05000255/2014007
- PNP 2014-072, 2014 Steam Generator Tube Inspection Report
- PNP 2014-073, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
- PNP 2014-074, Relief Request Number RR 4-20 Proposed Alternative, Use of Alternate ASME Code Case N-716
- PNP 2014-075, Response to Request for Additional Information - Palisades - RR 4-17, Proposed Alternative, Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW135 - MF3192
- PNP 2014-080, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors