Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24025A936 | 31 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
IR 05000263/2023004 | 31 January 2024 | Integrated Inspection Report 05000263/2023004 | |
ML24024A072 | 24 January 2024 | Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
IR 05000263/2024401 | 22 January 2024 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 | |
L-MT-23-054, Subsequent License Renewal Application Supplement 8 | 11 January 2024 | Subsequent License Renewal Application Supplement 8 | Non-Destructive Examination Coatings Aging Management License Renewal |
L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | 29 December 2023 | License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | Safe Shutdown Shutdown Margin Fire Barrier Anticipated operational occurrence Hydrostatic Coatings Emergency Lighting Pressure and Temperature Limits Report License Renewal Subsequent License Renewal Fire Protection Program |
L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | 18 December 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | Offsite Dose Calculation Manual |
ML23349A057 | 15 December 2023 | and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota | |
IR 05000263/2023402 | 13 December 2023 | Security Baseline Inspection Report 05000263/2023402 | Fitness for Duty Safeguards Contingency Plan |
L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 11 December 2023 | 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | Power Uprate |
L-MT-23-052, Subsequent License Renewal Application Supplement 7 | 30 November 2023 | Subsequent License Renewal Application Supplement 7 | Aging Management License Renewal |
L-MT-23-051, Update to the Technical Specification Bases | 28 November 2023 | Update to the Technical Specification Bases | |
L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | 21 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | |
ML23319A318 | 15 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | 13 November 2023 | 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | Grace period |
IR 05000263/2023003 | 13 November 2023 | Integrated Inspection Report 05000263/2023003 and 07200058/2023001 | Unanalyzed Condition Packing leak Commercial Grade Dedication Enforcement Discretion Functionality Assessment Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program Scaffolding Power Uprate |
L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | 10 November 2023 | License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | Safe Shutdown Surveillance Frequency Control Program |
L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | 9 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | Coatings VT-2 Aging Management Through Wall Leak |
ML23291A110 | 23 October 2023 | Environmental Audit Summary and RCIs and RAIs | License Renewal Subsequent License Renewal Environmental Justice |
ML23285A306 | 12 October 2023 | Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Earthquake Minimum staff Grace period Integrated Public Alert and Warning System Siren |
L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | 3 October 2023 | Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | Aging Management License Renewal Subsequent License Renewal |
L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 3 | 22 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 3 | Coatings Aging Management License Renewal Subsequent License Renewal |
ML23262B037 | 19 September 2023 | Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports | |
ML23248A209 | 18 September 2023 | Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve | Incorporated by reference Locked High Radiation Area Scaffolding |
ML23256A168 | 13 September 2023 | Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection | |
IR 05000263/2023010 | 7 September 2023 | Commercial Grade Dedication Inspection Report 05000263/2023010 | Half scram Commercial Grade Dedication Condition Adverse to Quality Significance Determination Process |
L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | 5 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal Fire Protection Program |
ML23214A241 | 31 August 2023 | Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application | Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination VT-2 Incorporated by reference Aging Management License Renewal Subsequent License Renewal Control of Heavy Loads Fire Protection Program Dissimilar Metal Weld Power Uprate |
IR 05000263/2023005 | 30 August 2023 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) | |
L-MT-23-035, Subsequent License Renewal Application Supplement 5 | 28 August 2023 | Subsequent License Renewal Application Supplement 5 | Finite Element Analysis Aging Management Scram Discharge Volume License Renewal Pressure Boundary Leakage |
ML23241A973 | 21 August 2023 | Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) | |
L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 1 | 15 August 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 1 | Hydrostatic Operating Basis Earthquake Incorporated by reference Aging Management License Renewal Dissimilar Metal Weld |
ML23222A012 | 10 August 2023 | Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence | |
ML23215A131 | 9 August 2023 | License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application | Internal Flooding License Renewal Subsequent License Renewal Environmental Justice Fatality Power Uprate Affidavit |
IR 05000263/2023002 | 7 August 2023 | Plantintegrated Inspection Report 05000263/2023002 | High Radiation Area Offsite Dose Calculation Manual Enforcement Discretion Met Tower Nondestructive Examination Functionality Assessment FLEX Aging Management Operability Determination Pressure Boundary Leakage Fire Protection Program Coast down |
L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | 31 July 2023 | 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | Locked High Radiation Area Test box Scaffolding |
L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 31 July 2023 | 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | Through-Wall Leakage |
ML23198A041 | 28 July 2023 | LRA Availability Letter | |
ML23206A234 | 25 July 2023 | Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence | |
ML23201A035 | 24 July 2023 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML23202A003 | 21 July 2023 | Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program |
L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | 18 July 2023 | Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | Fire Barrier Hydrostatic Coatings Operating Basis Earthquake Aging Management License Renewal Subsequent License Renewal Power Uprate |
ML23195A173 | 14 July 2023 | Revision of Standard Practice Procedures Plan | |
IR 05000263/2023501 | 13 July 2023 | Emergency Preparedness Inspection Report 05000263/2023501 | |
L-MT-23-030, Subsequent License Renewal Application Supplement 3 | 4 July 2023 | Subsequent License Renewal Application Supplement 3 | Hydrostatic Fire Protection Program |
ML23199A280 | 3 July 2023 | Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application Wright and Sherburne Counties, Minnesota | |
ML23181A022 | 30 June 2023 | Revision to Correspondence Service List for Northern States Power - Minnesota | |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
ML24016A229 | 27 June 2023 | Fws to NRC, Monticello SLR List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project | |
ML24016A228 | 27 June 2023 | Fws to NRC, Federal Agency Coordination Under ESA Section 7 and Concurrence That Monticello SLR Is Not Likely to Adversely Affect the Northern long-eared Bat | |
ML24016A230 | 27 June 2023 | Us Dept. of the Interior, Verification Letter for 'Monticello Subsequent License Renewal' for Specified Threatened and Endangered Species That May Occur in Proposed Project Location Consistent with the Minnesota-Wisconsin Endangered Species | Subsequent License Renewal |
L-MT-23-025, Subsequent License Renewal Application Supplement 2 | 26 June 2023 | Subsequent License Renewal Application Supplement 2 | High Radiation Area Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier License Renewal Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld |
ML23047A118 | 2 June 2023 | Notice of Intent to Conduct Scoping Process and Prepare an EIS | License Renewal Subsequent License Renewal |
ML23150A172 | 30 May 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
ML23123A422 | 16 May 2023 | Request RR 001 to Use Later Edition of ASME BPV Section XI Code for Cisi Program | Nondestructive Examination Incorporated by reference |
ML23117A338 | 15 May 2023 | Letter to Melanie Benjamin, Chief Executive, Mille Lacs Band of Ojibwe, from Chair Hanson Responds to Concerns Regarding the Tritium Leaks at the Monticello Nuclear Generating Plant | |
L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report | 10 May 2023 | Submittal of 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report | 10 May 2023 | Submittal of 2022 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
IR 05000263/2023401 | 4 May 2023 | Security Baseline Inspection Report 05000263/2023401 | Affidavit |
L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | 2 May 2023 | Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | MELLLA |
ML23115A417 | 28 April 2023 | Requesting for Withholding Information from Public Disclosure for Monticello Nuclear Generating Plant Core Operating Limits Report (COLR) for Cycle31, Revision 2 | |
ML23116A267 | 28 April 2023 | Request for Withholding Information from Public Disclosure for Monticello Nuclear Generating Plant Core Operating Limits Report (COLR) for Cycle 31, Revision 3 | |
ML23114A124 | 25 April 2023 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
ML23111A228 | 25 April 2023 | Information Meeting with Question and Answer Session to Discuss Nrc 2022 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Power Station | Open House |
L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | 18 April 2023 | 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | |
ML23079A074 | 11 April 2023 | Request RR-003 to Use Later Edition of ASME Section XI Code for ISI Code of Record | Incorporated by reference |
L-MT-23-010, Subsequent License Renewal Application Supplement 1 | 3 April 2023 | Subsequent License Renewal Application Supplement 1 | |
ML22357A100 | 31 March 2023 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility | Safe Shutdown Health Physics Network High winds Minimum staff Fire Protection Program Siren |
ML23089A267 | 30 March 2023 | Summary of Nuclear Property Insurance | |
ML23089A076 | 29 March 2023 | Decommissioning Funding Status Reports | |
L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 3 | 28 March 2023 | Core Operating Limits Report (COLR) for Cycle 31, Revision 3 | MELLLA |
ML23083B960 | 24 March 2023 | Guarantee of Payment of Deferred Premiums | |
L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 | 17 March 2023 | Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 | MELLLA |
ML23069A280 | 13 March 2023 | Tribal - Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application | |
ML23069A274 | 13 March 2023 | Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application | |
IR 05000263/2022006 | 1 March 2023 | Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2022006) | Commercial Grade Dedication Exemption Request COVID-19 |
ML23059A352 | 1 March 2023 | Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000263/2023010 | Commercial Grade Dedication Large early release frequency |
ML23048A037 | 28 February 2023 | SLRA - Portal Letter | |
ML23058A152 | 27 February 2023 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000263/2023002 | Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML23048A023 | 24 February 2023 | Subsequent License Renewal Application - Audit Plan | Aging Management License Renewal Subsequent License Renewal |
ML23047A175 | 23 February 2023 | SLRA Acceptance Letter | Subsequent License Renewal |
L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) | 7 February 2023 | 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) | Incorporated by reference |
ML23010A007 | 24 January 2023 | SLRA Availability Letter | |
L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program | 23 January 2023 | CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program | Non-Destructive Examination |
IR 05000263/2022004 | 17 January 2023 | Integrated Inspection Report 05000263/2022004 | Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
ML23012A156 | 13 January 2023 | Issuance of Amendment No. 210 Re Revised Methodologies for Determining the Core Operating Limits (EPID L-2021-LLA-0144) - Non-proprietary | Shutdown Margin Anticipated operational occurrence Feedwater Controller Failure Time Critical Operator Action Power change |
ML23009A353 | 9 January 2023 | Docket No. 50-263, Renewal License Numbers DPR-22 Application for Subsequent Renewal Operating License | License Renewal Subsequent License Renewal |
L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) | 6 January 2023 | Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) | Anchor Darling |
ML22362A114 | 29 December 2022 | Project Manager Assignment | |
ML22318A215 | 27 December 2022 | Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | Anticipated operational occurrence Temporary Modification Cyber Security Qualified Offsite Circuit Aging Management Surveillance Frequency Control Program |
ML23006A133 | 19 December 2022 | Submittal of Revision 40 to Updated Safety Analysis Report | Safe Shutdown Incorporated by reference Aging Management Surveillance Frequency Control Program License Renewal Subsequent License Renewal Fire Protection Program |
L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | 15 December 2022 | L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | |
L-MT-22-049, Industry Groundwater Protection Initiative Special Report | 15 December 2022 | Industry Groundwater Protection Initiative Special Report | Offsite Dose Calculation Manual |
IR 05000263/2022012 | 15 December 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000263/2022012 | Scaffolding Weak link |
L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 13 December 2022 | 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | |
L-MT-22-048, Update to the Monticello Technical Specification Bases | 28 November 2022 | Update to the Monticello Technical Specification Bases | |
IR 05000263/2022013 | 21 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000263/2022013 | Packing leak Cyber Security Condition Adverse to Quality FLEX Scaffolding Inattentive Siren |
IR 05000263/2022003 | 17 November 2022 | Reissue - Monticello Nuclear Generating Plant - Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination License Renewal Fire Protection Program |
ML22314A216 | 16 November 2022 | Withdrawal of Alternative Request VR-08 | |
ML22307A182 | 14 November 2022 | Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Fire Protection Program |
L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | 10 November 2022 | Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | |
ML22308A196 | 10 November 2022 | Regulatory Audit Report Regarding License Amendment Request to Transition to Atrium 11 Fuel | Anticipated operational occurrence |
L-MT-22-045, Letter Submitting Post-Exam Package | 4 November 2022 | Letter Submitting Post-Exam Package | |
ML22264A106 | 31 October 2022 | Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency | Ultimate heat sink Foreign Material Exclusion |
IR 05000263/2022403 | 19 October 2022 | Security Baseline Inspection Report 05000263/2022403 (Public) | Affidavit |
ML22271A916 | 3 October 2022 | Operator Licensing Examination Approval | |
ML22258A190 | 15 September 2022 | Voluntary Security Clearance Program 2022 Insider Threat Program Self-Inspection | |
ML22251A171 | 7 September 2022 | 10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello and Prairie Island Nuclear Generating Plants | Pandemic Coronavirus |
L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan | 6 September 2022 | Sixth Interval Inservice Testing (1ST) Plan | Safe Shutdown Packing leak Stroke time Water Inventory Control Squib Incorporated by reference Locked High Radiation Area Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Breakaway torque Cold shutdown justification Earthquake Power Operated Valves Scaffolding |
L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency | 29 August 2022 | Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency | |
IR 05000263/2022005 | 29 August 2022 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2022005) | Commercial Grade Dedication Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
ML22220A272 | 8 August 2022 | Response to a Request for Additional Informational Regarding the Monticello Fuel Oil Storage Tank Inspection | |
ML22187A291 | 3 August 2022 | Request for Withholding Information from Public Disclosure Monticello Nuclear Generating Plant | |
ML22189A019 | 29 July 2022 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |
IR 05000263/2022002 | 28 July 2022 | Integrated Inspection Report 05000263/2022002 | Functionality Assessment Operability Determination Minimum staff Fire Protection Program Siren |
ML22206A166 | 25 July 2022 | Information Request to Support Upcoming Problem Identification and Resolution Inspection at Monticello Nuclear Generating Plant | Temporary Modification Aging Management Maintenance Rule Program |
L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) | 22 July 2022 | Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) | |
ML22201A129 | 20 July 2022 | Independent Spent Fuel Storage Installation, and Monticello, Submittal of Quality Assurance Topical Report (NSPM-1) | |
L-MT-22-026, Changes to the Emergency Plan | 19 July 2022 | Changes to the Emergency Plan | Health Physics Network High Radiation Area Met Tower Design basis earthquake Severe Accident Management Guideline Earthquake Minimum staff |
ML22182A384 | 1 July 2022 | Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection 05000263/2022012 | Probabilistic Risk Assessment |
ML22161A915 | 10 June 2022 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Earthquake Minimum staff Fire Protection Program Grace period |
L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies | 6 June 2022 | Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies | Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake MELLLA |
L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency | 25 May 2022 | Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency | Surveillance Frequency Control Program |
ML22139A309 | 19 May 2022 | Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000263/2022003 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML22130A522 | 12 May 2022 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
L-MT-22-017, 2021 Annual Radiological Environmental Operating Report | 11 May 2022 | 2021 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
L-MT-22-018, 2021 Annual Radioactive Effluent Release Report | 11 May 2022 | 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
IR 05000263/2022001 | 10 May 2022 | Generation Plant - Integrated Inspection Report 05000263/2022001 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Severe Accident Management Guideline Fire Protection Program Scaffolding Power change Unidentified leakage |
IR 05000263/2022402 | 5 May 2022 | Security Baseline Inspection Report 05000263/2022402; Independent Spent Fuel Storage Installation Security Inspection Report 07200058/2022401 | Affidavit |
L-MT-22-016, 2021 Annual Report of Individual Monitoring | 28 April 2022 | 2021 Annual Report of Individual Monitoring | |
ML22110A123 | 25 April 2022 | Withdrawal of Relief Requests PR-09 and VR-07 (Epids: L 2021 Llr 0095 and L 2022 Llr 0021) | |
ML22109A075 | 20 April 2022 | Information Meeting with a Question-And-Answer Session to Discuss NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant | |
L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval | 18 April 2022 | Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval | Incorporated by reference |
ML22088A227 | 29 March 2022 | Guarantee of Payment of Deferred Premiums | |
ML22088A224 | 29 March 2022 | Summary of Nuclear Property Insurance | |
IR 05000263/2022401 | 28 March 2022 | Generation Plant - Cyber Security Inspection Report 05000263/2022401 | Cyber Security |
L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency | 18 March 2022 | License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency | Ultimate heat sink Foreign Material Exclusion Power Operated Valves |
ML22076A135 | 17 March 2022 | Preparation and Scheduling of Operator Licensing Examinations | |
L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System | 15 March 2022 | Special Report for the Bypass of the Offgas Treatment Storage System | Offsite Dose Calculation Manual |
L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) | 7 March 2022 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) | Surveillance Frequency Control Program |
ML22067A084 | 7 March 2022 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-28 (LMT-22-007) | Incorporated by reference |
IR 05000263/2021006 | 2 March 2022 | Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2021006) | Commercial Grade Dedication Exemption Request Coronavirus |
ML22059A988 | 28 February 2022 | Revision to Correspondence Service List | |
ML22056A024 | 24 February 2022 | Submittal of 2021 Fitness of Duty Performance Data | Fitness for Duty |
L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) | 18 February 2022 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) | |
IR 05000263/2021004 | 28 January 2022 | Integrated Inspection Report 05000263/2021004 and 07200058/2021001 | Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment FLEX Job Performance Measure Operability Determination Fire Protection Program |
L-MT-22-004, Technical Specification 5.6.4 Post Accident Monitoring Report | 20 January 2022 | Technical Specification 5.6.4 Post Accident Monitoring Report | Post Accident Monitoring |
L-MT-22-003, Submittal of Revision 1 of the Core Operating Limits Report for Cycle 31 | 11 January 2022 | Submittal of Revision 1 of the Core Operating Limits Report for Cycle 31 | MELLLA |
L-MT-21-068, 2021 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 15 December 2021 | 2021 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | |
L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | 13 December 2021 | License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | Anticipated operational occurrence Qualified Offsite Circuit FLEX Aging Management Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
ML21342A376 | 13 December 2021 | Confirmation of Initial License Examination | |
ML21347A974 | 13 December 2021 | Independent Spent Fuel Storage Installation Decommissioning Funding Plans | Decommissioning Funding Plan Authorized possession limits Aging Management COVID-19 Fuel cladding Fire Watch Scaffolding |
L-MT-21-063, Notice of Intent to Pursue Subsequent License Renewal for Plant | 1 December 2021 | Notice of Intent to Pursue Subsequent License Renewal for Plant | |
L-MT-21-067, Update to the Monticello Technical Specification Bases | 29 November 2021 | Update to the Monticello Technical Specification Bases | |
ML21322A236 | 18 November 2021 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2022401 | Cyber Security |
IR 05000263/2021420 | 15 November 2021 | Security Baseline Inspection Report Cover Letter 05000263 2021420 | Affidavit |
ML21277A295 | 8 November 2021 | Request for Withholding Information from Public Disclosure | |
IR 05000263/2021003 | 27 October 2021 | Plan, Integrated Inspection Report 05000263/2021003 | Internal Flooding Cyber Security Functionality Assessment Locked High Radiation Area FLEX Aging Management Operability Determination Coronavirus COVID-19 Fire Protection Program |
ML21223A280 | 15 October 2021 | Issuance of Amendment No. 207 Adoption of TSTF-564 Safety Limit MCPR | Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
IR 05000263/2021010 | 8 October 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000263/2021010 | Internal Flooding Probabilistic Risk Assessment Significance Determination Process Large early release frequency Time Critical Operator Action Earthquake Coronavirus COVID-19 |
ML21278A185 | 5 October 2021 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049) | Stroke time Scaffolding |
IR 05000263/2021005 | 1 September 2021 | Updated Inspection Plan for Monticello Nuclear Generating Plant 2 (Report 05000263/2021005) | Cyber Security Open Phase Condition Exemption Request Coronavirus |
IR 05000263/2021501 | 1 September 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000263/2021501 | Coronavirus COVID-19 |
L-MT-21-038, 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 17 August 2021 | 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | |
ML21215A217 | 3 August 2021 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
IR 05000263/2021002 | 3 August 2021 | Integrated Inspection Report 05000263/2021002 | High Radiation Area Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area FLEX Aging Management Scram Discharge Volume Operability Determination Coronavirus COVID-19 Pressure Boundary Leakage Fire Protection Program Coast down |
L-MT-21-044, License Amendment Request: Application to Adopt Advanced Framatome Methodologies | 29 July 2021 | License Amendment Request: Application to Adopt Advanced Framatome Methodologies | Shutdown Margin Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Finite Element Analysis Feedwater Controller Failure MELLLA Fuel cladding Power change |
ML21148A274 | 12 July 2021 | Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment Squib Qualified Offsite Circuit Emergency Lighting FLEX Tornado-Generated Missile Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency MELLLA Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit |
L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 30 June 2021 | Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Probabilistic Risk Assessment Large early release frequency |
ML21160A104 | 9 June 2021 | Submittal of Changes to the Emergency Plan | |
ML21147A508 | 3 June 2021 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
ML21146A190 | 25 May 2021 | Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant | |
ML21134A100 | 13 May 2021 | Submittal of Core Operating Limits Report for Cycle 31 | |
ML21133A495 | 13 May 2021 | 2020 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
L-MT-21-033, 2020 Annual Radioactive Effluent Release Report | 13 May 2021 | 2020 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML21130A302 | 7 May 2021 | Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System | |
L-MT-21-035, Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System | 7 May 2021 | Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System | |
IR 05000263/2021001 | 30 April 2021 | Integrated Inspection Report 05000263/2021001 | Packing leak Enforcement Discretion Functionality Assessment Operability Determination Coronavirus COVID-19 Offsite Circuit Fire Protection Program Power change Coast down Weak link |
L-MT-21-028, 2020 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | 28 April 2021 | 2020 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | |
L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations | 20 April 2021 | Preparation and Scheduling of Operator Licensing Examinations | |
L-MT-21-017, Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 2 | 20 April 2021 | Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 2 | Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML21106A218 | 14 April 2021 | NRC Letter Re NRC Office of Investigations Report No. 3-2020-006 | |
ML21099A090 | 8 April 2021 | Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000263/2021011 | Operator Manual Action Open Phase Condition |
ML21067A038 | 7 April 2021 | U.S. NRC Analysis of Northern States Power Company'S Initial and Updated Decommissioning Funding Plans for the Prairie Island Nuclear Generating Plant, Units 1 and 2, and Monticello Nuclear Generating Plant Independent Spent Fuel Storage in | Decommissioning Funding Plan Authorized possession limits |
ML21088A180 | 29 March 2021 | Decommissioning Funding Status Reports | |
ML21085A858 | 26 March 2021 | Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000263/2021010 | Stroke time Temporary Modification Aging Management Job Performance Measure Large early release frequency Coronavirus |
L-MT-21-016, Nuclear Material Transaction Report | 25 March 2021 | Nuclear Material Transaction Report | |
ML21084A261 | 25 March 2021 | Summary of Nuclear Property Insurance | |
ML21084A266 | 25 March 2021 | Guarantee of Payment of Deferred Premiums | |
L-MT-21-015, Nuclear Material Transaction Report | 22 March 2021 | Nuclear Material Transaction Report | |
L-MT-21-002, Northern States Power Company - Nuclear Material Transaction Report | 5 March 2021 | Northern States Power Company - Nuclear Material Transaction Report | |
IR 05000263/2020006 | 4 March 2021 | Annual Assessment Letter for the Monticello Nuclear Generating Plant (Report 05000263/2020006) | Open Phase Condition Exemption Request Coronavirus |
IR 05000263/2020010 | 2 March 2021 | Reissue - Monticello Nuclear Generating Plant - Biennial Problem Identification and Resolution Inspection Report 05000263/2020010 | Stroke time Internal Flooding Past operability Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Pandemic Coronavirus COVID-19 Flow Induced Vibration Operability Assessment Power Uprate |
ML21057A050 | 26 February 2021 | Submittal of Fitness for Duty Performance Data for 2020 | Fitness for Duty |
ML21070A104 | 11 February 2021 | 8 to the Updated Safety Analysis Report | Safe Shutdown Fire Protection Program |
ML21029A298 | 29 January 2021 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000263/2021002 | Nondestructive Examination Aging Management Foreign Material Exclusion Scaffolding |
L-MT-21-003, Submission of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) | 27 January 2021 | Submission of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) | |
ML21013A454 | 21 January 2021 | Request for Withholding Information from Public Disclosure | |
IR 05000263/2020004 | 20 January 2021 | Integrated Inspection Report 05000263/2020004 | High winds Internal Flooding Enforcement Discretion Functionality Assessment Foreign Material Exclusion Operability Determination Time Critical Operator Action Coronavirus COVID-19 Fire Protection Program Coast down |
ML21013A422 | 13 January 2021 | Biennial Problem Identification and Resolution Inspection Report 05000263/2020010 | Stroke time Internal Flooding Past operability Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Pandemic Coronavirus COVID-19 Flow Induced Vibration |
ML20352A349 | 8 January 2021 | Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation | High Radiation Area Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML20328A038 | 8 January 2021 | Regulatory Audit Summary License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B | |
ML20317A136 | 22 December 2020 | Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0174 (COVID-19)) | Exemption Request Pandemic Coronavirus COVID-19 |
ML20346A097 | 21 December 2020 | Request for Alternative for Examination of Reactor Pressure Vessel Threads in Flange | |
L-MT-20-036, Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times | 21 December 2020 | Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX Fukushima Dai-Ichi Thermoset Scram Discharge Volume Large early release frequency Earthquake Fuel cladding Offsite Circuit Very Early Warning Fire Detection |
L-MT-20-045, 2020 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 16 December 2020 | 2020 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | |
ML20336A160 | 9 December 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
IR 05000263/2020301 | 9 December 2020 | NRC Initial License Examination Report 05000263/2020301 | Job Performance Measure |
IR 05000263/2020402 | 3 December 2020 | Security Baseline Inspection Report 05000263/2020402 (Cover Letter Only) | Affidavit |
L-MT-20-031, 10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2020 | 10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20324A631 | 25 November 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
L-MT-20-043, Update to the Monticello Technical Specification Bases | 24 November 2020 | Update to the Monticello Technical Specification Bases | |
IR 05000263/2020003 | 9 November 2020 | Integrated Inspection Report 05000263/2020003 | Packing leak Internal Flooding Temporary Modification Functionality Assessment Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000263/2020015 | 9 November 2020 | NRC Inspection Report 05000263/2020015 | Safe Shutdown Past operability Probabilistic Risk Assessment Significance Determination Process Large early release frequency Fire Protection Program |
L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | 3 November 2020 | License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Offsite Dose Calculation Manual Anticipated operational occurrence Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML20307A017 | 2 November 2020 | Request for Alternative for Core Support Structure Weld Examination | Incorporated by reference |
ML20293A256 | 16 October 2020 | Operator Licensing Examination Approval | |
IR 05000263/2020013 | 13 October 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000263/2020013 | Stroke time Anchor Darling Squib Operability Determination Power-Operated Valves Coronavirus COVID-19 Weak link |
ML20275A394 | 1 October 2020 | Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at the Monticello Nuclear Generating Plant | Temporary Modification Aging Management Maintenance Rule Program Coronavirus |
IR 05000263/2020401 | 22 September 2020 | Security Baseline Inspection Report 05000263/2020401 (Cover Letter Only) | Affidavit |
L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 22 September 2020 | License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
ML20210M014 | 8 September 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules | Time of Discovery |
IR 05000263/2020005 | 1 September 2020 | Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2020005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000263/2020002 | 3 August 2020 | Integrated Inspection Report 05000263/2020002 | Packing leak Past operability Anchor Darling Temporary Modification Functionality Assessment Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower Weak link Unidentified leakage Siren Exclusive Use |
ML20153A804 | 31 July 2020 | Co. - Issuance of Amendments Revising Emergency Action RA3 | |
ML20213C714 | 31 July 2020 | Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant - Submittal of Quality Assurance Topical Report (NSPM-1) | |
ML20184A013 | 22 July 2020 | Units 1 and 2 and Prairie Island ISFSI - Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Sections I, II, IV, and VI (EPID L-2020-LLE-0108 (COVID-19)) | Exemption Request Pandemic Coronavirus |
L-MT-20-024, Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | 20 July 2020 | Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | |
ML20174A545 | 15 July 2020 | Request for Alternative for Pressure Isolation Valve Testing | Incorporated by reference |
ML20183A165 | 30 June 2020 | Public Webinar to Discuss NRC 2019 End-Of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant and Monticello Nuclear Generating Plant | |
ML20183A176 | 30 June 2020 | Public Webinar to Discuss NRC 2019 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant and Monticello Nuclear Generating Plant | |
IR 05000263/2020014 | 30 June 2020 | License Renewal Phase IV Report 05000263/2020014 | Coatings Aging Management License Renewal Subsequent License Renewal Coronavirus COVID-19 |
L-MT-20-015, Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan | 8 June 2020 | Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan | |
ML20153A401 | 1 June 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Liquid penetrant |
ML20135G992 | 29 May 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Liquid penetrant |
ML20134H958 | 29 May 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Weld Overlay Liquid penetrant |
IR 05000263/2020012 | 26 May 2020 | Inspection of the Implementation of EA-13-09: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Report 05000263/2020012 | FLEX B.5.b Coronavirus COVID-19 |
L-MT-20-013, 2019 Annual Radiological Environmental Operating Report | 14 May 2020 | 2019 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
ML20133K053 | 14 May 2020 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
L-MT-20-014, 2019 Annual Radioactive Effluent Release Report | 14 May 2020 | 2019 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20134H928 | 12 May 2020 | Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000263/2020013 | Commercial Grade Dedication Squib Power-Operated Valves Weak link |