Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000263/2023010
ML23059A352
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/01/2023
From: Atif Shaikh
NRC/RGN-III/DORS/ERPB
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2023010
Download: ML23059A352 (1)


See also: IR 05000263/2023010

Text

Christopher Domingos

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR NRC COMMERCIAL GRADE DEDICATION INSPECTION:

INSPECTION REPORT 05000263/2023010

Dear Christopher Domingos:

On July 10, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a commercial

grade dedication (CGD) inspection at Monticello Nuclear Generating Plant (MNGP). This

inspection will be performed in accordance with NRC Inspection Procedure 71111.21N.03,

Commercial Grade Dedication.

The inspection will evaluate the implementation of MNGPs process for dedicating

commercial-grade items, as required in applicable portions of Title 10 of the Code of Federal

Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power

Plants and Fuel Reprocessing Plants, to ensure reasonable assurance is provided that these

items will perform their intended safety function. Additionally, the inspection will evaluate

implementation of MNGPs procurement process for safety-related components, as required in

Appendix B.

The inspection may include an onsite information gathering visit by the lead inspector. The

inspection will include 2 weeks onsite and will consist of three NRC inspectors (including the

lead inspector). The current inspection schedule is as follows:

Preparation weeks:

June 26-30, 2023, and July 3-7, 2023

Onsite weeks:

July 10-14, 2023, and July 24-28, 2023

March 1, 2023

C. Domingos

2

Experience with previous baseline inspections of similar depth and length has shown that this

type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee

staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection

scoping activities. This information should be provided to the lead

inspector no later than May 5, 2023. The lead inspector will

communicate the initial selected set of samples no later than

May 26, 2023.

The second group of documents requested are those items needed

to support our in-office preparation activities. This set of documents

should be provided to the lead inspector no later than June 23, 2023.

During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

The third group includes the additional information above, a

schedule of plant activities associated with the inspection during the

onsite period, and any additional requests resulting from the

potential information gathering visit. This information should be

available to the team onsite on July 10, 2023.

The fourth group includes supporting information to be provided

throughout the onsite inspection. Specifically, corrective action

documents and answers to questions developed during the

inspection are requested to be provided as the documents are

generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Atif Shaikh. We understand that our licensing contact for

this inspection is Carrie Seipp of your organization. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9824 or via email at Atif.Shaikh@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

C. Domingos

3

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Atif Shaikh, Senior Reactor Inspector

Engineering and Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 05000263

License No. DPR-22

Enclosure:

Commercial Grade Dedication Inspection

Request for Information

cc: Distribution via LISTSERV

Signed by Shaikh, Atif

on 03/01/23

C. Domingos

4

Letter to Christopher Domingos from Atif Shaikh dated March 1, 2023.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR NRC COMMERCIAL GRADE DEDICATION

INSPECTION: INSPECTION REPORT 05000263/2023010

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

Paul Zurawski

RidsNrrDorlLpl3

RidsNrrPMMonticello

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23059A352

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

AShaikh:gmp

DATE

03/01/2023

OFFICIAL RECORD

Enclosure

COMMERCIAL GRADE DEDICATION INSPECTION

REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000263/2023010

Onsite Inspection Dates:

July 10-14, 2023, and July 24-28, 2023

Inspection Procedure:

IP 71111.21N.03, Commercial Grade Dedication

Lead Inspector:

Atif Shaikh, Senior Reactor Inspector, RIII/DORS/ERPB

630-829-9824

Atif.Shaikh@nrc.gov

Teammates:

Ijaz Hafeez, Senior Reactor Inspector, RIII/DORS/EB2

Kevin Barclay, Senior Reactor Inspector RIII/DORS/EB2

II.

LOGISTICS

Email the following inspection logistics to the lead inspector by June 9, 2023, or

sooner:

1.

Inspection room name/number, directions from the main access facility, and phone

number.

2.

Interview room name/number.

3.

Response team contact information (names and phone numbers), and

team roles (e.g., management sponsor, lead, inspector counterpart).

4.

Any site access/badging actions needed for each inspector.

5.

Any dosimetry actions needed for each inspector.

6.

Entrance meeting time and location.

7.

Confirmation that the team will have access to a licensee computer

with a nearby printer.

8.

Confirmation that the team will have Wi-Fi access.

9.

Cafeteria location and hours.

10. Inspection response team normal working hours.

11. Any potential resource conflicts during the inspection (e.g., emergency drills

and all-staff meetings).

2

12. Current management and engineering organizational chart.

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding

this information request. Provide the information electronically in PDF files, Excel, or

other searchable formats, preferably via an electronic sharing service (CERTREC,

ShareFile, Box, etc.). Specific Excel formats for various enclosure items may be

requested to assist in inspection sample selection. If you do not have access to any of

these services or similar, we can provide you access to Box, which can be used to

upload/download and share documents. The files should contain descriptive names

and be indexed and hyperlinked to facilitate ease of use. Information in lists should

contain enough information to be easily understood by someone who has knowledge of

light-water reactor technology.

1.

Information Requested for Selection of Samples

The following information is requested by May 5, 2023, or sooner, to facilitate the

initial sample selection.

Note: If you are unable to provide items 1.1. through 1.16. as requested, please

reach out to the lead inspector as soon as possible.

1.1.

Risk-Ranking of the top 500 components from your site-specific

probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include

values for Risk Achievement Worth, Risk-Reduction Worth, and

Fussell-Veseley. Please provide the ranking in an excel spreadsheet that

contains the importance measures and the description of the basic event

(e.g., not just the basic event designator).

1.2.

Risk-ranking of the top 500 components (i.e., Large Early Release Frequency

(LERF)) from your site-specific PSA similar to the request in Item 1.1.

(Provide in Excel format.)

1.3.

Provide a list of the top 500 cut-sets from your PSA. Provide the descriptions

of the basic events in the list of cut-sets. (Provide in Excel format.)

1.4.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency.

(Provide in Excel format.)

1.5.

List of commercial-grade items, with a brief description of application, that

have been dedicated for safety-related applications. These items may be

dedicated by the site or dedicated by a vendor (or other licensee) and

procured by the site. Please note whether the item has been installed in the

plant. Please include the component equipment identification of the proposed

or installed item location which can be correlated to the lists provided in Items

1.1 and 1.2. The list should encompass the past 6 years of dedication

activities.

3

1.6.

List of any commercial grade-items that failed after completing the dedication

process. The list should encompass the past 6 years of dedication activities.

1.7.

List of components procured as safety-related, with descriptions, if not

included above. Please note whether the component has been installed in the

plant. Please include the component equipment identification of the proposed

or installed location which can be correlated to the lists provided in Items 1.1

and 1.2. The list should encompass the past 6 years of procurement activities.

List of corrective action program documents, with descriptions, related to

commercial-grade items, procurement, or storage, including any items that

failed after completing the dedication process. The list should encompass the

past 6 years of these activities.

1.8.

List components procured as safety-related or commercial-grade items

intended to be dedicated for safety-related applications that are on hold

because of concerns identified during receipt, dedication, or from operating

experience/corrective action program as applicable. If possible, the list should

identify the systems and equipment in which these items were intended for

use.

1.9.

List of components procured as safety-related or commercial-grade items

dedicated for safety-related applications, in the past 6 years, where the

procurement/dedication process was expedited to support rapid turnaround

(less than 7 days). Please include the component equipment identification of

the proposed or installed location which can be correlated to the lists provided

in Items 1.1 and 1.2.

1.10. Procedures for dedicating commercial-grade items and for procurement of

safety-related components. Also include procedures controlling counterfeit,

fraudulent, and suspect items.

1.11. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

1.12. Electronic copies of simplified plant drawings (if available). Note: these may

be uncontrolled documents such as big notes, training diagrams, etc.

1.13. List of systems, system numbers/designators, and corresponding names.

1.14. List of site contacts that will be associated with the inspection.

1.15. Copy of qualifications, as applicable, of personnel who performed

commercial-grade dedication, safety-related component procurement, and/or

receipt inspection/testing activities within the past 6 years.

2.

Information Requested to Support Inspection Preparation Activities

The following information is requested by March 23, 2023, or sooner, to facilitate

inspection preparation.

4

This document request is based on typical documents that a generic plant might

have. As such, this document request is not meant to imply that any specific plant

is required to have all of the listed documents. In addition, your plant-specific

document titles may vary from the document titles listed below.

This information should be separated for each selected sample, especially if

provided electronically (e.g., folder with sample name that includes specifications,

inspection reports, dedication information, etc.).

2.1.

Purchase requisitions and purchase orders;

2.2.

Other pertinent vendor/licensee correspondence;

2.3.

Original and updated design specifications;

2.4.

Catalog specifications;

2.5.

Procurement basis evaluation such as like-for-like, equivalency,

plant design change packages, drawing and specification

updates;

2.6.

10 CFR 50.59 documentation, if applicable;

2.7.

Material receiving reports, packing lists/invoices, and other shipping

documents;

2.8.

Receipt inspection reports and any related test reports;

2.9.

Other documents to trace the item from the time it was dedicated to

the time it was installed, tested, and accepted;

2.10. Certificates of conformance/compliance/quality;

2.11. Vendor test and inspection reports;

2.12. Third-party or sub-vendor test and inspection reports;

2.13. Shelf-life information;

2.14. Vendor dedication/partial dedication information;

2.15. Design/material/process change history information;

2.16. Completed commercial-grade dedication documentation including:

2.16.1 Safety classification;

2.16.2 Identification of safety functions/application requirements;

2.16.3 Identification of critical characteristics;

5

2.16.4 Identification of verification methods and acceptance criteria

for the critical characteristics;

2.16.5 Evaluation of credible failure modes, if applicable; and

2.16.6 Identification of the suppliers quality assurance program that meets

10 CFR Part 50, Appendix B.

2.17. Any deviation from design, material, and performance characteristics

relevant to the safety function (nonconformance dispositions);

2.18. Documents showing objective evidence:

2.18.1 Special test and inspection procedures and results;

2.18.2 Commercial-grade survey reports -item, design, material, and specific

performance characteristic (relevant to safety function); and

2.18.3 Source inspection reports.

2.19. Completed post-installation test procedure and results;

2.20. Completed stock or material issue forms and installation work orders or

reports; and

2.21. Historical performance information, including corrective action documents,

maintenance rule performance, failure analysis or root cause analysis for any

failed components, and system health reports related to the installed

component.

3.

Additional Information to be Provided on July 10, 2023, Onsite

3.1. During the in-office preparation activities, the team will be making final

selections and may identify additional information needed to support the

inspection. The lead inspector will provide a list of the additional information

needed during the week of July 3, 2023.

3.2. Schedule of any activities to be conducted on the selected samples during the

two onsite inspection weeks (e.g., installation, testing, inspection, etc.).

3.3. Schedule of separate interviews with knowledgeable plant personnel for each

of the components selected during the beginning of the first onsite week.

Interviews will discuss the dedication/procurement process, selected critical

characteristics of each sample, installation, and performance of installed

items. This can include, but is not limited to, plant personnel from procurement

engineering, other engineering disciplines, operations, maintenance, or any

other departments that are cognizant of the dedication/procurement,

installation, and acceptance criteria/methods of each component including

component/system health.

6

4.

Information Requested to be Provided Throughout the Inspection:

4.1. Any corrective action documents generated as a result of the teams questions

during this inspection as the documents are generated.

4.2. List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide daily by

2 p.m. to each inspector. It is recommended to provide the lead inspector

with a master list sorted by inspector and each inspector with a list

containing only the items originated by that inspector.

If you have questions regarding the information requested, please contact the lead inspector.