Integrated Inspection Report 05000263/2022002
ML22208A148
Person / Time
Site: Monticello 
Issue date: 07/28/2022
From: Hironori Peterson
Region 3 Branch 3
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2022002
Download: ML22208A148 (16)


Text

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000263/2022002

Dear Mr. Domingos:

On June 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant. On July 21, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2022002

Enterprise Identifier:

I-2022-002-0050

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

April 01, 2022 to June 30, 2022

Inspectors:

C. Norton, Senior Resident Inspector

G. Hansen, Sr. Emergency Preparedness Inspector

T. McGowan, Resident Inspector

V. Myers, Senior Health Physicist

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Monticello began the inspection period at rated thermal power. On May 9, 2022, the unit was down powered to 80 percent to accommodate increased wind supply and returned to 100 percent. On May 18, 2022, the unit was reduced to 32 percent for a control rod sequence exchange and condenser cleaning. The unit returned to 100 percent on May 23, 2022, and remained at 100 percent rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of potential deepening extreme drought and hot summer months for the following systems:

cooling tower structures 11 and 12, divisions 1 and 2 125 volt dc battery rooms, ventilation, and intake structure traveling screens on June 22, 2022

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Control rod drive hydraulic control station on April 8, 2022
(2) Division 2 emergency diesel generator (EDG) starting air system while division 1 EDG removed from service for 12-year maintenance on April 12, 2022
(3) Division 1 EDG starting air system while division 2 EDG removed from service for 2-year maintenance on April 28, 2022
(4) High pressure coolant injection system inlet steam drains on May 4, 2022
(5) Division 2 residual heat removal service water (RHRSW) system (protected train) on June 7, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the station 345 kV and 230 kV switchyard on April 21, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone (FZ) 2-B, east hydraulic control unit area on April 27, 2022
(2) FZ 19-C, feedwater pipe chase on April 27, 2022
(3) FZ 17, turbine building north cable corridor 941' on April 27, 2022
(4) FZ 16, turbine building east & west corridor, elevations 911' and 931' on April 27, 2022
(5) FZ control room on April 27, 2022

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the shift 3 onsite fire brigade training and performance during an observation of practical live fire training located at Hennepin Technical College in Eden Prairie, Minnesota on June 10, 2022

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during reduction of reactor power for rod sequence exchange on May 17, 2022

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator retraining simulator evaluation on May 31, 2022

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Division 2 filtration service water piping replacement on June 03, 2022
(2) High pressure coolant injection maintenance window on June 23, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Emergent EDG 11 electric fuel pump 125 VDC ground, unplanned EDG outage extension on April 15, 2022
(2) Reactor water cleanup system pipe leak connecting regenerative heat exchangers 11 and 12 on May 24, 2022
(3) Main condenser tube sheet fouling caused by elevated river flow and excessive debris at intake structure on May 18, 2022
(4) RHRSW 11 pump replacement on June 30, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Division 2 EDG inoperable but available due to both fuel oil transfer pumps running,

===501000062468

(2) An anticipated transient without SCRAM inverter light is out, 501000063570
(3) RHRSW 11 pump alert range, 501000063699
(4) RHRSW 11 pump differential pressure in required action range,501000063933

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01)===

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) OSP-EDG-0550-12, 12 EDG consolidated testing, following emergency cycle 12 preventative maintenance, Work Order 7000084768
(2) Division 2 emergency service water leakage test on June 03, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Standby gas treatment train 'A' quarterly test on May 04, 2022
(2) Emergency service water 14 quarterly pump and valve test on June 03, 2022
(3) Spent fuel pool and reactor building exhaust plenum monitor calibration on June 24, 2022

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:

Annual siren inspection and maintenance records for the period from May 2020 to May 2022

Monthly alert notification system (siren) tests for the period from May 2020 to May 2022

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the emergency preparedness organization

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Licensed operator retraining, loss of stator water cooling with high power anticipated transient without SCRAM on May 31,

RADIATION SAFETY

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Reactor building ventilation

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry

Internal Dosimetry (IP Section 03.03) (2 Samples)

The inspectors evaluated the following internal dose assessments:

(1) Dose assessment performed on 05/12/2021
(2) Dose assessment performed on 06/28/2021

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situations:

(1) Extremity monitoring for control rod drive changeout

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) April 01, 2021 through March 31, 2022

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) April 01, 2021 through March 31, 2022

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2021 through March 31, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) July 1, 2021 through March 31, 2022 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) July 1, 2021 through March 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 21, 2022, the inspectors presented the integrated inspection results to Mr. C. Domingos, Site Vice President, and other members of the licensee staff.

On April 21, 2022, the inspectors presented the radiation protection inspection results to Mr. K. Nyberg, Director of Site Performance Operations Support, and other members of the licensee staff.

On June 16, 2022, the inspectors presented the emergency preparedness baseline inspection results to Mr. R. White, Director of Nuclear Security and Emergency Preparedness, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NH-36265 (M-

153)

Office and Control Building Air Flow Diagram

Drawings

NH-36489-2 (M-

800-1)

Circulating Water System P&ID

1444

Pre and Post Severe Weather Inspection Checklist

FP-WM-SR-01

Seasonal Readiness Program

Procedures

Ops Man

B.08.07-02

Heating and Ventilation

71111.01

Work Orders

700088409

PM 11 Cooling Tower Structure

04/21/2022

NH-36051

P&ID Diesel Oil System

NH-36244

Control Rod Hydraulic System

NH-36249

High Pressure Coolant Injection System

NH-36664 (M-

2)

P&ID RHR Service Water & Emergency Service Water

Systems

Drawings

NH-36665 (M-

811)

P&ID Service Water System and Make-Up Intake Structure

109

B.09.03-05

345 kV Substation, System Operation

B.09.04-05

230 kV Substation, System Operation

71111.04

Procedures

FP-OP-PEQ-01

Protected Equipment Program

A.3-02-B

East HCU Area

A.3-09

Control Room

A.3-16

Corridor, Turbine Building East and West

(Elevations 911' and 931')

A.3-17

Turbine Building North Cable Corridor 941'

Fire Plans

A.3-19-C

F.W. Pipe Chase

71111.05

Miscellaneous

Refresher

Training for

Operators (Fire

Brigade)

Fire Brigade Training (Live Fire) - Shift 3

06/10/2022

Miscellaneous

RQ-SS-200

Loss of Stator Water Cooling with High Power ATWS

71111.11Q

Procedures

2300

Reactivity Adjustment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Ops Man C.2-05

(Part B)

Power Reduction

Calculations

608000000828

Acceptance Review for Backseating MO-2035

501000064141

HOCI Drain Pot Level LS-23-90/2 Alarms

06/21/2022

Corrective Action

Documents

501000064161

Valve Found Leaking in HPCI ROOM (LS-23-90 Upper Root

Isolation)

06/22/2202

Corrective Action

Documents

Resulting from

Inspection

501000064180

Thermal Cycling Effects on MO-2035

06/22/2022

NH-36249

P&ID Steam Side High Pressure Coolant Injection System

Drawings

NH-36665 (M-

811)

P&ID Service Water System and Make-Up Intake Structure

107

71111.12

Work Orders

700085070

Replacement Division 2 FSW Pipe

501000062285

Unexpected 11 Battery Ground Alarm

04/15/2022

Corrective Action

Documents

501000063307

RWCU leak

05/23/2022

Drawings

NH-36254 (M-

28)

P&ID Reactor Water Cleanup System

8006-01

Partial Condenser Isolation and Entry Procedure (Inner

Loop)

Procedures

8006-02

Partial Condenser Isolation and Entry Procedure (Outer

Loop)

700106976

RWCU Regenerative HX 11

05/23/2022

71111.13

Work Orders

700107976

RHRSW Pump Replacement

501000062468

EDG FO Pumps Found Running, 12 EDG Inoperable

04/21/2022

501000063570

A ATWS Inverter Light is Out

06/01/2022

501000063699

RHRSW Pump Alert Range

06/09/2022

Corrective Action

Documents

501000063933

RHRSW Pump dp in Required Action Range

06/16/2022

NX-16162-1-10

ATWS Elementary Diagram Anticipated Transient Without

SCRAM Recirculation Pump Trip System

NX-16162-1-2

ATWS Elementary Diagram

Drawings

NX-16162-1-3

ATWS Elementary Diagram

71111.15

Procedures

255-05-1A-1-1

A RHRSW Quarterly Pump and Valve Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

501000062640

EDG Overspeed Limit Switch Fail

04/27/2022

4106-01

Emergency Diesel 1 Cycle Maintenance

Procedures

OSP-EDG-0550-

Emergency Diesel Generator Consolidated Testing

700061183-0020

SW to V-EAC-14A Check Valve

71111.19

Work Orders

700084768-01

Emergency Diesel Precision Maintenance Critical

Component

04/28/2022

Drawings

NH-36881 (M-

145)

Standby Gas Treatment Flow Diagram

0068

Spent Fuel Pool & Reactor Building Exhaust Plenum Monitor

Calibration

253-01

SBGT A Train Quarterly Test

71111.22

Procedures

255-11-III-4

ESW Quarterly Pump and Valve Test

501000040374

ERO Pagers Not Activated by Callout System

05/07/2020

501000047678

Siren S-46 Performance Trending

01/12/2021

501000049221

ANS PANS Siren Activation Test Issue

03/03/2021

501000053844

PANS (1359) Siren Activation Issue

07/07/2021

501000058346

Potential PANS Siren Adverse Trend

2/27/2021

501000061174

MNGP ANS Design Report Discrepancy

03/10/2022

501000061999

Potential Failure

04/06/2022

Corrective Action

Documents

501000062411

AC Power Disconnected from 2 PANS sirens

04/29/2022

Siren Testing and Maintenance Data

06/01/2021 -

04/30/2022

Annual PANS Performance Review Records

06/01/2020 -

05/31/2022

Miscellaneous

ANS

Alert and Notification System Design Report

700067305-0010

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification

10/23/2020

700075031-0010

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification

05/20/2021

71114.02

Work Orders

700083271-0010

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification

10/13/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

700091533-0010

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification

04/12/2022

MNGP 1359

Public Alert Notification Systems (PANS) Weekly Cancel

Signal Test and Monthly Activation Test

Procedures

MNGP 1408

Annual PANS Performance Review

501000040374

ERO Pagers Not Activated by Callout System

05/07/2020

Corrective Action

Documents

501000056704

ERO Position with Minimum Staff Qualified

10/04/2021

Monticello Nuclear Generating Plant On-Shift Staffing

Analysis

5A

ERO 4 Team Duty Roster

05/12/2022

ERO Training and Qualification Records (Sample -15

personnel)

06/15/2022

Miscellaneous

ERO Augmentation Drill Records

05/01/2020 -

03/31/2022

5790-102-04

Emergency Call List - NUE

105

5790-104-04

Emergency Call List - Alert/Site Area/General

133

A.2-001

Emergency Organization

A.2-10

Activation and Operation of the OSC

A.2-111

Activation and Operation of the Alternative Facilities During

a Security Threat

A.2-802

Activation and Operation of the EOF

FL-BEP

Fleet Emergency Plan Training Program Description

MNGP 1317

Emergency Alert Notification System Test

71114.03

Procedures

MT-BEP

Monticello Emergency Plan Training Program Description

501000042396

EP HP Mini-Drill Critique Report

07/17/2020

501000045279

NUE Follow-up Actions

10/08/2020

501000046971

SCBA Bottles Needed by May 2021

2/08/2021

501000047766

Control Room Habitability Survey New Chemical

01/14/2021

501000048506

PA Speakers Making Buzzing Noise

2/08/2021

501000048867

PA Speakers 985 Non-Audible

2/19/2021

501000053100

Wide Range Gas Monitor Adverse Trend

06/11/2021

501000053359

Seals Missing from OSC Cabinet

06/22/2021

71114.05

Corrective Action

Documents

501000053609

EP Drill-Procedure May Not Be Adequate

06/29/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000053641

EP Drill Field Team Equipment Issues

06/29/2021

501000057175

EP Medical Drill - Knowledge Gaps

10/13/2021

501000062592

Current LOA with Wright County

04/26/2022

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification Records

06/01/2020-

04/30/2022

EP Critique Report - 2020 EP Medical Drill

2/20/2020

EP Critique Report - 2021 EP Medical Drill

11/23/2021

EP Critique Report - 2020 HP Mini Drill 1

08/07/2020

EP Critique Report - 2020 HP Mini Drill 2

01/20/2021

EP Critique Report - 2021 HP Mini Drill 1

07/12/2021

Monticello 8 Year EP Drill / Exercise Cycle Objectives Table

05/31/2022

22 Monticello Emergency Planning Guide

01/01/2022

EP Critique Report - 20A Table-Top Drill Series Report

11/19/2020

EP Critique Report - 20B Table-Top Drill Series Report

09/13/2021

EP Critique Report - August 20, 2021, NRC Evaluated

Exercise

09/24/2021

EP Critique Report - June 29, 2021, EP Full Scale Drill

08/06/2021

1102-01

Emergency Equipment Inventory Records

06/01/2020-

03/31/2022

1102-02

Emergency Equipment Inventory Records

06/01/2020-

03/31/2022

1441-01

Quarterly EOF Ventilation Testing Records

06/01/2020-

04/30/2022

1441-02

Annual EOF Ventilation Testing Records

11/01/2020-

2/31/2021

KLD TR-040

Monticello Nuclear Generating Plant Population Update

Analysis -2020

10/26/202

KLD TR-505

Monticello Nuclear Generating Plant Evacuation Time

Estimate

Miscellaneous

QF0174-EP-2021

Nuclear Oversight Emergency Preparedness Annual

Evaluation; Emergency Preparedness Program Evaluation

(Fleet/MT/PI)

2/17/2021

Procedures

Monticello Nuclear Generating Plant Emergency Plan

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1410

Semi-Annual Auto-Dialing Telephone Notification System

Testing and Maintenance Verification

FP-EP-SURV-05

Requirements for Annual Independent Review of EP

Program

MNGP 1225

Emergency Procedures Monthly Contact Verification

MNGP 1230

MNGP 1230

71114.06

Procedures

5790-101-02

Emergency Action Level Matrix

Corrective Action

Documents

501000061365

Steam Jet Air Ejector Room Air Sample

03/16/2022

Miscellaneous

SCBA Test Results

2/23/2021

210122

Repair/Replace Reactor Water Cleanup Valves

71124.03

Radiation Work

Permits (RWPs)

215509

Control Rod Drive Changeout

Corrective Action

Documents

501000049517

Unexpected Dose on Dosimeters

03/12/2021

Internal Dose Assessment

06/28/2021

Internal Dose Assessment

05/12/2021

Miscellaneous19-002

Technical Basis Document for the Sensitivity Study of

ARGOS 4/5, PM7 and GEM-5 Monitors

FP-RP-DP-01

Dosimetry Program

71124.04

Procedures

FP-RP-IDA-01

Internal Dose Assessment

NRC Performance Indicator Data;

Emergency Preparedness - Drill/Exercise Performance;

3rd Quarter 2021 - 1st Quarter 2022

07/01/2021 -

03/31/2022

NRC Performance Indicator Data;

Emergency Preparedness - ERO Readiness

07/01/2021 -

03/31/2022

NRC Performance Indicator Data;

Emergency Preparedness - Alert and Notification System

07/01/2021 -

03/31/2022

QF0445

NRC and Data Collection and Submittal - Safety System

Functional Failures (April 2021 through March 2022)

Miscellaneous

QF0445

NRC Data Collection and Submittal - Reactor Coolant

System Total Leakage (April 2021 through March 2022)

71151

Procedures

FP-PA-PI-02

NRC and MOR Performance Indicator Reporting

16