Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000263/2022003
ML22139A309
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/19/2022
From: Jorge Corujo-Sandin
NRC/RGN-III/DRS/EB2
To: Domingos C
Northern States Power Co
References
IR 2022003
Download: ML22139A309 (11)


See also: IR 05000263/2022003

Text

May 19, 2022

Mr. Christopher Domingos

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR AN NRC TRIENNIAL HEAT EXCHANGER/SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000263/2022003

Dear Mr. Domingos:

On August 22, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite

portion of the Triennial Heat Exchanger/Sink Performance Inspection at Monticello Nuclear

Generating Plant. This inspection will be performed in accordance with NRC baseline

Inspection Procedure 71111.07.

The Triennial Heat Exchanger/Sink Performance Inspection focuses on service water cooled

heat exchangers, closed loop heat exchangers and the ultimate heat sink (UHS). The

inspection verifies that the selected service water cooled heat exchanger(s), closed loop heat

exchanger(s) and the UHS remain capable of performing their intended safety functions.

The inspection includes 1 week onsite. The inspection team will consist of two NRC inspectors.

The current inspection schedule is as follows:

Preparation week: August 15-19, 2022

Onsite week: August 22-26, 2022

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, a request for documents needed for the inspection is enclosed. The information

request has been divided into three groups:

The first group lists information necessary for the initial inspection scoping activities.

This information should be available to the lead inspector no later than June 27,

2022. The lead inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers by July 11, 2022.

The second group is needed to support the in-office preparation activities. This set

of documents, including the calculations associated with the selected heat

exchangers, should be available at the Regional Office no later than August 01,

2022. This information should be separated for each selected component, especially

if provided electronically (e.g., folder with component name that includes

C. Domingos -2-

calculations, condition reports, maintenance history, etc.). During the in-office

preparation activities, the inspector may identify additional information needed to

support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the inspector on

August 15, 2022. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the inspector as the

documents are generated.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Carrie Seipp of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9741 or via e-mail at jorge.corujo-sandin@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

C. Domingos -3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

Signed by Corujo-Sandin, Jorge

on 05/19/22

Jorge Corujo-Sandin, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

C. Domingos -4-

Letter to Christopher Domingos from Jorge Corujo-Sandin dated May 19, 2022.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR AN NRC TRIENNIAL HEAT EXCHANGER/SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000263/2022003

DISTRIBUTION:

Jessie Quichocho

Robert Orlikowski

RidsNrrDorlLpl3

RidsNrrPMMonticello

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Shelbie Lewman

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML22139A309

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JCorujo-Sandin:mb

DATE 05/19/2022

OFFICIAL RECORD COPY

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

HEAT EXCHANGER/SINK PERFORMANCE

REQUEST FOR INFORMATION

I. ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number: 05000263/2022003

Onsite Inspection Dates: August 22-26, 2022

Inspection Procedure: IP 71111.07, HEAT EXCHANGER/SINK PERFORMANCE

Jorge Corujo-Sandin, Senior Reactor Inspector, DRS

Lead Inspector: 630-829-9741

jorge.corujo-sandin@nrc.gov

Teammates: Daneira Meléndez-Colón, Reactor Inspector, RIII/DRS

I. Information Requested by: June 27, 2022

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

a. Identify if the heat exchanger is service water cooled or a closed loop heat

exchanger.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous 3 years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

Enclosure

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

8. Provide a list of all corrective action documents, with a short description, associated

with the UHS for the previous three years or since the last corrective action program

document list was sent to the NRC for the previous Triennial heat sink performance

inspection.

II. Information Requested by: August 01, 2022

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the

GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

4. Copies of the selected corrective action program documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i. Establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. Demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. Correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. Evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. Evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

2

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for the

heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

6. For the ultimate heat sink (UHS):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS.

d. Copy of the document (e.g., UFSAR, Technical Requirements Manual or

procedure) that states the maximum cooling water system inlet temperature limit

that still allows full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and Design Specification.

g. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS including procedures for loss of this systems.

h. Provide a list of calculations (with a short description), which currently apply to

UHS.

i. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the UHS.

j. Provide a list of any design change (with a short description) performed on the

UHS since the last heat sink performance inspection.

7. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion of the

inspection.

III. Information Requested to be Available for Inspection Preparation by: August 15, 2022

1. For the specific service water cooled heat exchangers selected:

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria).

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

3

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

c. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

d. Information regarding any alarms which monitor on-line performance.

e. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

f. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

h. Copy of the vendor manuals including component drawings for each heat

exchanger.

i. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

j. Copy of the operating procedures that ensure that the maximum cooling water

system inlet temperature limit is not exceeded.

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

l. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

m. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

p. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

4

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

2. For the specific closed loop heat exchangers selected:

a. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

b. Copy of the vendor manuals including component drawings for each heat

exchanger.

c. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

d. Copy of the operating procedures that ensure that the maximum cooling water

system inlet temperature limit is not exceeded.

e. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

f. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

g. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

h. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

i. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

j. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

k. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

3. For the review of the operation of the UHS:

For review of the operation of the service water system and UHS:

a. Copies of any design change performed on the UHS. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance

inspection.

5

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

b. Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

c. Copies of procedures for a loss of UHS. Provide documentation that the

instrumentation, which is relied on for decision-making is available and

functional.

d. Copies of procedures for a loss of service water system.

e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp).

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.

Also, provide copies of the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

g. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

For the review of the performance testing of the safety-related service water system

(or equivalent) and the UHS:

h. Copies of the last two performance tests, such as the American Society of

Mechanical Engineers in-service test, for the pumps, valves, and, if applicable,

the towers fans in the safety-related service water system. If the components are

not performance tested, please provide documentation verifying performance by

the methods actually used.

i. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed longer than

3 years, then provide the last flow test.

j. Copies of the documents that demonstrate that flow balance testing will continue

to be periodically done in the future.

k. Copies of procedures used to monitor interface valves between the safety related

section of the service water system and the non-safety related section and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

l. Copies of the procedures that verify the performance of risk significant non-safety

functions and the associated results. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

6

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE DOCUMENT REQUEST

4. For review of the UHS Containment Device or Dam:

a. Copies of the toe of the weir or embankment inspection procedures and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

b. Copies of the inspection procedures of the rip rap protection placed on excavated

side slopes and the associated results. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

c. Copies of the dam inspection procedures that monitor the integrity of the heat

sink and the associated results. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

d. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

e. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

f. Copies of the inspection procedures for the verification of the structural integrity

of underwater UHS and the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

g. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater diving

inspections and/or sediment removal activities. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

h. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

i. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

If the information requested above is not be available, please contact Jorge Corujo-Sandin as

soon as possible at 630-829-9741 or via e-mail at jorge.corujo-sandin@nrc.gov.

7