Integrated Inspection Report 05000263/2022003
ML22307A182
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/14/2022
From: Laura Kozak
NRC/RGN-III/DORS/RPB3
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2022003
Download: ML22307A182 (18)


See also: IR 05000263/2022003

Text

Mr. Christopher Domingos

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION

REPORT 05000263/2022003

Dear Christopher Domingos:

On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at Monticello Nuclear Generating Plant. On October 6, 2022, the NRC inspectors

discussed the results of this inspection with you and other members of your staff. The results of

this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Laura L. Kozak, Acting Branch Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

Docket No. 05000263

License No. DPR-22

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

November 14, 2022

Signed by Kozak, Laura

on 11/14/22

ML22307A182

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

LKozak:ve

DATE

11/14/2022

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2022003

Enterprise Identifier:

I-2022-003-0050

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

July 01, 2022 to September 30, 2022

Inspectors:

J. Corujo-Sandin, Senior Reactor Inspector

T. McGowan, Senior Resident Inspector

D. Melendez-Colon, Reactor Inspector

V. Myers, Senior Health Physicist

C. Norton, Senior Resident Inspector

L. Rodriguez, Senior Reactor Inspector

Approved By:

Laura L. Kozak, Acting Branch Chief

Reactor Project Branch 3

Division of Operating Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Monticello Nuclear Generating Plant, in

accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs

program for overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

3

PLANT STATUS

Monticello began the inspection period at rated thermal power. At 7:00 pm on August 29, 2022,

the licensee lowered power to 95 percent of rated thermal power to accommodate wind and

solar generation and returned to rated thermal power at 8:00 pm on August 29, 2022. At

2:00 am on September 25, 2022, the licensee lowered power to 85 percent of rated thermal

power to accommodate wind and solar generation and returned to rated thermal power at

6:00 am on September 25, 2022. The unit remained at or near rated thermal power for the

remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.03) (1 Sample)

(1)

The inspectors evaluated that flood protection barriers, mitigation plans, procedures,

and equipment are consistent with the licensees design requirements and risk

analysis assumptions for coping with external flooding on August 24, 2022

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

Division 1 250-volt dc system, protected train, containing battery 13 associated

battery charger and dc distribution panel on July 26, 2022

(2)

High pressure coolant injection system (HPCI) during work week window: 2238 on

September 22, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated system configurations during a complete walkdown of

emergency diesel generator (EDG) 12 system on September 16, 2022

4

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1)

Fire zone 13-B, reactor feed pump and lube oil reservoir room on July 05, 2022

(2)

Fire zone 3-A, recirculation motor generator set room on July 05, 2022

(3)

Fire zone 31-A, emergency filtration building (EFT) first floor, division 1 on

July 05, 2022

(4)

Fire zone 5-C, fuel pool skimmer tank room on July 06, 2022

(5)

Fire zone 13-C, turbine building 911' elevation east MCC area on July 06, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1)

Flood zone PAB-1

71111.07T - Heat Exchanger/Sink Performance

Heat Exchanger (Service Water Cooled) (IP Section 03.02) (2 Samples)

The inspectors evaluated heat exchanger performance on the following:

(1)

13 Residual Heat Removal Service Water Pump Cooler (P-109C)

(2)

'A' Residual Heat Removal Room Air Cooling Unit (V-AC-5)

Ultimate Heat Sink (IP Section 03.04) (1 Sample)

The inspectors evaluated the ultimate heat sink performance on the following:

(1)

The ultimate heat sink, specifically Sections 03.04.b and 03.04.c were completed

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1)

The inspectors observed and evaluated licensed operator performance in the control

room during testing and the return to service of the HPCI system on

September 22, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated integrated scenarios during shift 2 simulator

training on August 11, 2022

5

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1)

Electric fire pump discharge air vent on August 10, 2022

(2)

Secondary containment isolation dampers on August 31, 2022

(3)

Core spray pump 11 relay maintenance, calibration, and testing on

September 13, 2022

(4)

HPCI turbine speed governor EG-M replacement on September 21, 2022

Aging Management (IP Section 03.03) (1 Sample)

The inspectors evaluated the effectiveness of the aging management program for the

following SSCs that did not meet their inspection or test acceptance criteria:

(1)

Steam jet air ejector valve failure on May 13, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

Emergent work activity to address water found in the residual heat removal (RHR)

14 pump upper bearing oil reservoir sample on July 8, 2022

(2)

Initial implementation of the FLEX maintenance provisions of FP-WM-SCH-01, online

scheduling process, to repair shaft seal leak on P-902A, off gas recombiner

condensate cooling pump 11 on July 14, 2022

(3)

Emergent work activity to address steam leaks on HPCI system, root valves on

July 27, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

501000066143, SW21-1 & SW22-1, residual heat removal service water (RHRSW)

system to service water system check valves, failed inservice testing

(2)

501000066330, unable to dial out on phone system

(3)

501000066684, vibration data bad P109D, RHRSW pump 14

(4)

501000065942, flex forklift storage improvement

6

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1)

Instrument air compressors controller upgrade

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system

operability and/or functionality:

(1)

RHR 11 service water pump following pump replacement on July 1, 2022

(2)

RHR 14 pump following motor upper bearing cooling water leak repair on

July 8, 2022

(3)

EDG 11 following planned preventive maintenance on July 13, 2022

(4)

HPCI steam leak repairs (root isolation valves) on July 25, 2022

(5)

Secondary containment isolation dampers on August 31, 2022

(6)

Hydraulic control unit for CRD 10-39 (accumulator replacement) on

September 06, 2022

(7)

HPCI turbine stop valve on September 22, 2022

(8)

HPCI turbine water induction protection system exhaust drain hi-hi level switch on

September 22, 2022

(9)

HPCI solenoid valve (CV-2043) on September 22, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability

and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (4 Samples)

(1)

Recombiner train outlet hydrogen analyzer surveillance on July 07, 2022

(2)

Security system emergency diesel generator operability check on July 07, 2022

(3)

Fire detection and instrumentation detector sensitivity check for battery rooms and

cable spreading room on July 20, 2022

(4)

HPCI system surveillance testing on September 22, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1)

HPCI quarterly pump and valve tests on July 08, 2022

7

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1)

Licensed operator retraining scenario with graded emergency action level

classification on September 26, 2022

RADIATION SAFETY

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1)

The inspectors evaluated environmental monitoring equipment and observed

collection of environmental samples

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the implementation of the licensees radiological

environmental monitoring program

GPI Implementation (IP Section 03.03) (1 Sample)

(1)

The inspectors evaluated the licensees implementation of the Groundwater

Protection Initiative program to identify incomplete or discontinued program elements

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

(1)

July 1, 2021 through June 30, 2022

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1)

July 1, 2021 through June 30, 2022

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1)

July 1, 2021 through June 30, 2022

71152A - Annual Follow-Up Problem Identification and Resolution

Annual Follow-Up of Selected Issues (Section 03.03) (2 Samples)

8

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1)

The inspectors reviewed the effectiveness of corrective actions associated with power

to security equipment on July 7, 2022

(2)

The inspectors reviewed the effectiveness of corrective actions associated with

documentation annotation and the failure to follow own process governing

documenting results in various field records on August 03, 2022

71152S - Semiannual Trend Problem Identification and Resolution

Semiannual Trend Review (Section 03.02) (2 Samples)

(1)

The inspectors reviewed the licensees corrective action program for potential

adverse trends in documentation that might be indicative of a more significant safety

issue

(2)

The inspectors reviewed the licensees corrective action program for potential

adverse trends in status control (i.e., bump sensitive equipment) that might be

indicative of a more significant safety issue

INSPECTION RESULTS

Observation: Follow-Up Review of Corrective Actions Associated with Past

Documentation Annotation Pertaining to Maintenance and Surveillance Activities

71152A

During the inspection period, the inspectors reviewed various documentation on recent

preventive maintenance procedures and surveillance activities performed by site

maintenance and operations personnel. The inspectors did not observe any issues pertaining

to improper usage of markings for non-applicable steps, changing steps without appropriate

approvals, or failure to perform independent verifications when required.

Observation: Corrective Actions Associated with Bump Sensitive Equipment

71152S

On April 21, 2022, both fuel oil (FO) pumps, P-160B and P-160-D, were found running for

emergency diesel generator (EDG) 12. Vortex considerations with both FO pumps running

resulted in the inoperability but not the non-functionality of EDG 12. A vortex formed in the

first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of diesel operation at rated load would not have interrupted the flow of fuel from

the storage tank to the day tank. The licensee returned the FO pumps to a normal lineup and

declared EDG 12 operable. The licensee entered this issue into the corrective action program

as QIM 50100062468, EDG FO pumps found running, EDG 12 inoperable. The licensee

determined that workers likely bumped the switches while climbing a scaffold approximately

three feet from the FO pump switches. The licensee protected the switches with covers to

preclude future bumping.

On July 21, 2022, Xcel identified in QIM 501000064902 that Monticello had issues with

status control of plant equipment that directly impacted emergency systems relied upon to

protect public health and safety. The QIM established that workers were not effectively

identifying and eliminating bump-sensitive component risks, consistently applying verification

practices, and that marked status control areas were under-utilized to notify workers of

sensitive equipment.

9

In August 2022, the licensee formed a multidisciplinary team to identify and recommend

solutions to eliminate or reduce the risk associated with bump sensitive equipment. The team

identified and initiated corrective actions for dozens of items.

Observation: Corrective Actions Associated with Power to Security Equipment

71152S

On July 7, 2021, while testing security equipment, a component in the power supply failed to

properly respond. The licensee entered this event into their corrective action program as

quality issue management (QIM) 501000053835. The licensee performed an apparent cause

evaluation and identified that the station personnel did not demonstrate adequate

troubleshooting and teamwork needed to identify that a system was not properly configured.

Contributing causes included a lack of system knowledge, a lack of sensitivity to security

significance, and inadequate procedures.

The inspectors verified that corrective actions to address the apparent cause and contributing

causes were addressed. Corrective actions included revising the troubleshooting process to

include security, revising operator rounds to include the component, training operators on

these components, training security on the impacts of inoperable security equipment, revising

the applicable test procedure to include clear prerequisite verification steps, updating security

procedures, creating alarm response procedures associated with these components, revising

maintenance surveillance procedures. The inspectors observed the testing of the

components on July 7, 2022, and verified corrective actions effectively prevented recurrence

of the event.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 6, 2022, the inspectors presented the integrated inspection results to

Christopher Domingos, Site Vice President, and other members of the licensee staff.

On July 28, 2022, the inspectors presented the radiation protection inspection results to

Ms. Michelle Neal, Director Nuclear Fleet Operations, and other members of the

licensee staff.

On August 26, 2022, the inspectors presented the triennial heat sink inspection results to

Shawn Hafen, Plant Manager, and other members of the licensee staff.

10

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1478

External Flood Monthly and Annual Surveillance

24

EWI-08.19.01

Cable Condition Monitoring Program

10

Procedures

FP-PE-CBL-01

Cable Condition Monitoring Program

5

71111.01

Work Orders

700091077-010

Underground Vaults for Water - Inspection

08/23/2022

NH-36051 (M-

133)

P&ID Diesel Oil System

U

NH-36051-1 (M-

133)

P&ID Diesel Oil System

77

NH-36249 (M-

123)

P&ID (Steam Side), High Pressure Coolant Injection System

85

NH-36249-1 (M-

123-1)

P&ID HPCI Hydraulic Control & Lubrication System

78

NH-36250 (M-

124)

P&ID (Water Side), High Pressure Coolant Injection System

87

Drawings

NH-36664 (M-

112)

P&ID RHR Service Water & Emergency Service Water

Systems

97

Ops Man

B.09.08.05

Emergency Diesel Generators

62

Ops Man B.09.09-

02 (Description of

Equipment)

250 VDC System

6

71111.04

Procedures

Ops Man B.09.09-

06

250 VDC System (Figures)

5

Strategy A.3-03-A

Fire Zone 3-A, RECIRC MG Set Room

9

Strategy A.3-05-C

Fuel Pool Skimmer Tank Room

6

Strategy A.3-13-B

Fire Zone 13-B, RX Feed Pump and Lube Oil Reservoir

Room

14

Strategy A.3-13-C

Turbine Building 911' Elevation East MCC Area

12

71111.05

Fire Plans

Strategy A.3-31-A

EFT Building 1st Floor (Division 1)

12

Calculations07-035

Monticello Generating Plant Internal Flooding Analysis

0

71111.06

Procedures

C.4-I

Operations Manual Section: Abnormal Procedures, Plant

Flooding

19

11

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

08-085

Post LOCA Reactor Building Heatup Analyses for EPU

0F

Calculations97-083

Acceptance Criteria for RHRSW Flow Loop Checks in

Procedure 7070

0

Calibration

Records

FI-7189 Card 6

FI-7189: Division 1 RHR/RHR-SW/CS Systems Test

Instrument, Card 6

03/17/2021

501000049337

FI-7189 Indicating Higher Than Actual

03/09/2021

501000049639

FI-7189 Impact on 13 RSW Pump Baseline

03/17/2021

501000056747

ECCS Pump Availability Question

10/05/2021

501000057418

IST Annual Trending Review

10/19/2021

501000058725

Repeat - Condenser Fouling

12/02/2021

Corrective Action

Documents

501000062175

RHR RM Cooling Units PRA Model Concern

04/12/2022

501000065806

2022 UHS: RHRSW IST Procedures ISTB-3550

08/24/2022

501000065812

22UHS: Unknown Flow Noise in A RHR Rm

08/24/2022

501000065826

22UHS: Enhancements to A.6, Acts of Nature

08/24/2022

501000065848

22UHS: Temp Gradient Across RHRSW-14

08/24/2022

501000065853

22UHS: RHRSW Flow Loop Cal Units

08/25/2022

501000065873

22UHS: Clarify GL 89-13 HX Criteria

08/25/2022

501000065884

22UHS: NRC Observations

08/25/2022

Corrective Action

Documents

Resulting from

Inspection

501000065901

22UHS: M&TE Process Post FI-7189 Failure

08/25/2022

NH-36664

P&ID RHR Service Water & Emergency Service Water

Systems

97

Drawings

NH-36665

P&ID Service Water System & Make-Up Intake Structure

109

601000003242

RHR Flow Loop Calibration

03/18/2022

Engineering

Changes

6EQVENG27783

Replace V-4AC-4 and V-AC-5 Cooling Coils

02/28/2020

A.6

Acts of Nature

64

B.08.01.04-05

Emergency Service Water

32

C.4-B.08.01.01.A

Loss of Service Water

14

C.6-020-A-17

Southeast Equip Rm V-AC-5 High Temp

10

C.6-CWT104

River Level - Low

0

C.6-CWT502

River Flow - Low

0

DBD-S.04

Intake Structure

7

DBD-T.19

Design Bases Document: External Considerations

D

71111.07T

Procedures

EWI-08.22.01

Generic Letter 89-13

14

12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

I.05.25

Zebra Mussel Inspection

9

00449322

Mech - Replace 13 RHRSW Motor Cooling Coil

10/28/2013

00518804

Mech-P-109C, Clean 13 RHRSW Motor Cooler Per

4058-03-PM

01/18/2018

700039942-0010

RHR Service Water System Instrument Maintenance

Procedure

03/03/2020

700047296

4058-3 (Clean 13 RHRSW Motor Clr P-109C)

12/16/2021

700055078

PM 4126 (Inspect West Service Water Bay)

09/28/2021

700057971

PM 4125 (Inspect East Service Water Bay)

04/21/2021

700059226

4058-5 A RHR RM Air Cooling Unit V-AC-5

07/14/2020

700060484

Intake Bay/Traveling Screen Forebays Inspection

09/28/2021

700082689-0010

A RHR Room Air Cooling Unit V-AC-5 Internal Cleaning,

External Cleaning and Visual Inspection

05/12/2022

700087674

FI-7189, Replace Indicator

03/17/2021

700089703-0020

RHRSW-14/68, SAWA Valve Testing

08/16/2022

700091195-0010

P-109C, Generate Pump Curve

12/14/2021

700098226-0010

"A" RHRSW Quarterly Pump and Valve Tests

03/09/2022

700099950-0010

14 ESW Quarterly Pump and Valve Tests

04/19/2022

700102185-0010

"A" RHRSW Quarterly Pump and Valve Tests

06/10/2022

Work Orders

700103955-0010

SW-103 and SW-104 Valve Operability Test

07/20/2022

Miscellaneous

Simulator

Exercise Guide

(SEG) MT-LOR-

22D-001S

Licensed Operator Requalification, Cycle 22D Integrated

Scenario (Simulator)

08/02/2022

0255-06-IA-1

HPCI Quarterly Pump and Valve Tests

109

1069

HPCI Flow Control System Dynamic Test Procedure

27

7136

HPCI System Instrumentation Maintenance

15

71111.11Q

Procedures

B.03.02-05

Opening HPCI Steam Line Isolation Valves, MO 2304 and

2305

63

Corrective Action

Documents

501000066352

4kVB-34 Kept Charging After Closing

09/12/2022

NE-36404-5

152-505 Elementary

78

71111.12

Drawings

NH-36808 (M-

P&ID - Air Flow Diagram Reactor Building Upper Part

77

13

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

157)

NX-8875-50-8

152-505 Internal

E

4048-PM

Secondary Containment Isolation Damper Maintenance

29

4115-PM

HPCI System Inspection

34

4850-505-PM

152-505, 11 CS Pump Relay Maintenance, Calibration and

Test Tripping

9

FP-MA-ES-01

Electrical Safety

13

Procedures

FP-PE-RLP-01

License Renewal Implementation

9

700074627-0020

Secondary Containment Isolation Damper

08/31/2022

700076209-0030

HPCI Turbine Speed Governor EGM

09/21/2022

Work Orders

700085022

Electric Fire Pump Air Vent Rebuild

08/10/2022

Corrective Action

Documents

501000065007

HPCI Steam Line De-Pressure Time

07/26/2022

Drawings

NH-54817-4

P&ID Off Gas Modification Train 'A'

83

1376-02

RHR Pump Motor Oil Sampling

7

FP-WM-SCH-01

Online Scheduling Process

27

Procedures

QF-2007

Planning and Approval of High Risk or Scheduled Work

Risk, Off Gas Recombiner Condensate Cooling Pump

3

700082311-0010

I-HPCI-R-7

07/27/2022

700106547-0010

I-HPCI-R-6

07/27/2022

700108898-0030

P-202D/MTR, Correct Oil Cooler Leakage

07/07/2202

71111.13

Work Orders

700108898-20

P-202D/MTR Pressure Test Installed Coil

07/07/2022

501000065942

FLEX Forklift Storage Improvement

0

501000066143

SW 21-1 and SW 22-1 Failed IST Testing

09/05/2022

501000066330

Unable to Dial Out on Phone System

0912/2022

501000066382

FLEX Equipment not Returned by End of Day

0

501000066386

Trend: Lack of Reverence for FLEX Equipment

0

Corrective Action

Documents

501000066684

Vibration Data Bad P-109D

09/23/2022

71111.15

Procedures

B.08.08-05

Plant Communications System

10

71111.18

Corrective Action

Documents

Resulting from

Inspection

501000065522

NRC Identified Work Plan Typo (Wrong Component

Identified in Work Plan Title)

08/09/2022

14

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Drawings

NH-36049-2

P&ID Instrument Air System

87

Engineering

Changes

601000002842

Commercial Change Package, Instrument Air Compressor

SEQC-1 Replacement

0

Work Orders

700087578-0017

17 IAC C-446 Elektronikon Installation

0

0074

Control Rod Drive Exercise

71

0187-01

Emergency Diesel Generator 11/Emergency Service Water

11 Quarterly Pump and Valve Tests

107

4048-PM

Secondary Containment Isolation Damper Maintenance

29

4115-PM

HPCI System Inspection

34

Procedures

7100

CRD-HCU Instrument Maintenance Procedure

8

700006422-0040

(PMT)

HPCI Turbine Stop Valve

1

700054643-0170

Post Maintenance Test/Return to Service Instructions

Emergency Diesel Generator 11

1

700082311-0020

LS-23-90 Lower Root Isolation Valve

07/25/2022

700106547-0020

LS-23-90-Upper Root Isolation Valve

07/25/2022

700107976-0090

PMT/RTS Instructions RHRSW 11 Pump

3

700108898-0040

P-202D/MTR, Cooling Coli PMT/RTS

07/07/2022

700109666-0020

Hydraulic Control Unit for Control Rod Drive 10-39

09/07/2022

7001111934-0020 LS-23-98 PMT

09/22/2022

71111.19

Work Orders

700112562-0030

(PMT)

SV-2043 Air Leaking Past Exhaust Port

0

NH-36249 (M-

123)

P&ID (Steam Side) High Pressure Cooling Injection System

85

Drawings

NH-3649-1 (M-

123-1)

P&ID HPCI Hydraulic Control & Lubrication System

78

0211

Recombiner Train Outlet Hydrogen Analyzer Procedures

47

0255-06-IA-1

HPCI Quarterly Pump and Valve Tests

109

0298-02

Security System Emergency Generator Operability Check &

Alarm

31

ISP-FIR-1147-07

Fire Detection Instrumentation Detector Sensitivity Check for

Battery Rooms and Cable Spreading Room

3

71111.22

Procedures

NH-36250 (M-

P&ID (Water Side) High Pressure Coolant Injection System

87

15

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

124)

71114.06

Miscellaneous

RQ-SS-201

Scenario Evaluation Guide

0

Calibration

Records

5829

Radiological Environmental Monitoring Air Sampler

Calibration

11/01/2021

545502

GEL Laboratories Analysis Report

06/22/2021

550647

GEL Laboratories Analysis Report

08/19/2021

550648

GEL Laboratories Analysis Report

08/19/2021

556389

GEL Laboratories Analysis Report

10/19/2021

558022

GEL Laboratories Analysis Report

11/03/2021

Miscellaneous

ODCM-07.01

Radiological Environmental Monitoring Program

26

I.05.33

Weekly Radiological Environmental Monitoring Procedures

11

I.05.36

Semiannual Shoreline Sediment and Fish Sampling

4

I.05.39

Monthly Radiological Environmental Analysis Report

Verification

3

I.05.43

Radiological Environmental Monitoring Air Sampler

Calibration and Maintenance

3

Procedures

I.05.51

Radiological Environmental Monitoring Vegetation Sampling

3

71124.07

Work Orders

700081451

Meteorological Tower Preventative Maintenance

10/22/2021

Corrective Action

Documents

501000063695

HPCI UA Not Entered into Phoenix

06/08/2022

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

High Pressure Injection System; 3rd Quarter 2021 through

2nd Quarter 2022

08/10/2022

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

Emergency AC Power Systems; 3rd Quarter 2021 through

2nd Quarter 2022

08/10/2022

Miscellaneous

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

Heat Removal Systems; 3rd Quarter 2021 through 2nd

Quarter 2022

08/10/2022

71151

Procedures

FP-R-PI-01

Preparation of NRC Performance Indicators

10

501000053835

Loss of Security Power during 0298-02

07/07/2021

Corrective Action

Documents

602000020940

Apparent Cause Evaluation, Loss of Security Power during

0298-02

09/01/2021

71152A

Drawings

NF 85716

Security System Circuit Diagram 480 MCC-191, MCC-192,

79

16

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

& MCC-193

501000062468

EDG FO Pumps Found Running, EDG 12 Inoperable

04/21/2022

501000064804

Water Gong Not Working

07/18/2022

501000065326

Switch Covers Needed for Status Control

08/05/2022

Corrective Action

Documents

501000065376

Evaluate Plexiglass Covers in the Plant

08/05/2022

Miscellaneous

Licensee Internal

Spreadsheet

Status Control Walkdown Work Sheet

08/08/2022

0000-A

Operations Daily Log - Mode 1

109

0010

Reactor SCRAM Functional Test

32

003

Drywell High Pressure SCRAM and Group 2, 3 & SCTMT

Isolation Test and Calibration Procedure

37

0030

ECCS High Drywell Pressure Sensor

23

0356

Stack/Vent Iodine/Particulate Sample

24

FP-G-DOC-4

Procedure Processing

43

Procedures

OSP-AN2-0567

Monitor ADS Pneumatic Supply

9

71152S

Work Orders

700093480-0010

Warehouse No.1/No.2 Fire Suppression

07/18/2022