Letter Sequence Request |
---|
EPID:L-2021-LLR-0021, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051) (Closed, Withdrawn) |
|
|
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-024, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024)2023-07-11011 July 2023 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024) L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan ML22067A0842022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-28 (LMT-22-007) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) L-MT-21-051, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051)2021-12-23023 December 2021 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051) ML21305A0672021-11-0101 November 2021 Clone of 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing (IST) Ten-Year Interval PR-02 (L-MT-21-054) ML21278A1852021-10-0505 October 2021 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049) L-MT-21-041, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041)2021-08-31031 August 2021 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041) L-MT-21-038, 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2021-08-17017 August 2021 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-20-004, 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval2020-02-14014 February 2020 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval L-MT-20-001, 10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing2020-01-16016 January 2020 10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing L-MT-19-028, 2019 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report; Second Steam Dryer Inspection Summary2019-08-0909 August 2019 2019 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report; Second Steam Dryer Inspection Summary L-MT-17-059, 2017 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report2017-08-0909 August 2017 2017 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report L-MT-15-064, Cycle 27 Inservice Inspection Summary Report2015-08-26026 August 2015 Cycle 27 Inservice Inspection Summary Report ML14212A0712014-07-30030 July 2014 10 CFR 50.55a Request No. Vr 05: Proposed Alternative to Lnservice Testing Requirements Pursuant to 10 CFR 50.55a(a)(3)(ii) L-MT-14-037, CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Lnservice Inspection Interval2014-06-0606 June 2014 CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Lnservice Inspection Interval L-MT-14-021, Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval2014-02-28028 February 2014 Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval ML13308B2192013-10-11011 October 2013 Enclosure 3 - MNGP Evaluation EC-22537 - 2013 H8-H9 Shroud Support Structure Indications Update ML13308B2182013-10-0808 October 2013 Enclosure 2- BWRVIP Inspection Summary Report ML13308B2172013-10-0808 October 2013 Enclosure 1 - Cycle No. 26 and 1R26 2013 Refueling Outage Inservice Inspection: Interval 4, Period 3 and Interval 5, Period 1, Owner'S Activity Report (OAR-1) L-MT-13-060, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Inspection Program Plan Review2013-07-17017 July 2013 Response to Request for Additional Information Regarding Fifth 10-Year Inservice Inspection Program Plan Review L-MT-12-094, In-service Testing (IST) Program Plan for Safety Related Seismic Restraints (Snubbers) for the Fifth 10-Year Interval2012-11-30030 November 2012 In-service Testing (IST) Program Plan for Safety Related Seismic Restraints (Snubbers) for the Fifth 10-Year Interval L-MT-12-019, CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval2012-02-28028 February 2012 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval L-MT-12-017, CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Inspection Interval2012-02-28028 February 2012 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Inspection Interval L-MT-12-020, Fifth Ten-Year Lnservice Testing Plan2012-02-28028 February 2012 Fifth Ten-Year Lnservice Testing Plan L-MT-12-018, Fifth Ten-Year Lnservice Inspection Plan2012-02-28028 February 2012 Fifth Ten-Year Lnservice Inspection Plan L-MT-12-011, Supplement to 10CFR50.55a Requests Associated with the Fourth and Fifth Lnservice Lnspection Ten-Year Intervals2012-02-15015 February 2012 Supplement to 10CFR50.55a Requests Associated with the Fourth and Fifth Lnservice Lnspection Ten-Year Intervals L-MT-11-046, Cycle 25 Inservice Inspection Summary Report2011-08-23023 August 2011 Cycle 25 Inservice Inspection Summary Report L-MT-09-078, Submittal of Cycle No. 24 Inservice Inspection Summary Report for Inservice Inspection and ASME Section Xl Repairs and Replacements2009-08-0707 August 2009 Submittal of Cycle No. 24 Inservice Inspection Summary Report for Inservice Inspection and ASME Section Xl Repairs and Replacements L-MT-07-058, Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements2007-07-27027 July 2007 Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements L-MT-05-088, 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval2005-09-27027 September 2005 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval L-MT-05-078, Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements2005-07-12012 July 2005 Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements L-MT-05-039, Fourth Interval Inservice Inspection Examination Plan. Revision 32005-04-26026 April 2005 Fourth Interval Inservice Inspection Examination Plan. Revision 3 L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 22004-09-16016 September 2004 Fourth Interval Inservice Inspection Examination Plan, Revision 2 L-MT-03-056, Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements2003-08-25025 August 2003 Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements L-MT-03-023, Response to Request for Additional Information Regarding Fourth 10-Year Interval Inservice Testing Program Relief Request Number No.VR-012003-04-29029 April 2003 Response to Request for Additional Information Regarding Fourth 10-Year Interval Inservice Testing Program Relief Request Number No.VR-01 ML0235205912002-12-0606 December 2002 to Engineering Work Instruction EWI-09.04.01, Inservice Testing Program. ML0233806832002-11-22022 November 2002 Part 2 of 2, Monticello, Request for Review and Approval of Relief Request Associated with Fourth 10-Year Interval Inservice Testing Program Plan Submittal ML0233701072002-11-22022 November 2002 Part 1 of 2, Monticello, Request for Review and Approval of Relief Request Associated with Fourth 10-Year Interval Inservice Testing Program Plan Submittal ML0217102272002-06-0606 June 2002 Inservice Testing Program for Engineering Work Instruction, Revision 8 ML0211905312002-04-0101 April 2002 Revision 7 to EWI-09.04.01, Inservice Testing Program. ML0208603482002-03-12012 March 2002 Part 1 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements ML0208605512002-03-12012 March 2002 Part 2 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 ML0208606762002-03-12012 March 2002 Part 3 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 ML0208606932002-03-12012 March 2002 Part 4 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 ML0203203662002-01-11011 January 2002 Inservice Inspection Plan Submittal of Relief Request Number 14 for the Third Ten Year Interval 2023-07-31
[Table view] Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] |
Text
WEB-BASED PROPOSED ALTERNATIVE SUBMISSION 10 CFR 50.55a(z)(1)
Submission Date: February 18, 2022 Submitted By: Mary Emanuelson Document Sensitivity: Non-Sensitive Licensee: Xcel Energy Plant Unit(s) and Docket No(s): Monticello (05000263)
Licensee
Contact:
Mary Emanuelson mary.emanuelson@xcelenergy.com (612) 330-5850 Project
Title:
10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)
Proposed Alternative Number or Identifier:
VR-07 Request Type:
10 CFR 50.55a(z)(1)
Inservice Inspection (ISI) or Inservice Testing (IST)
Inservice Testing (IST)
Requested Completion Date:
February 28, 2023 Brief Description of Proposed Alternative Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter 'NSPM', hereby requests NRC authorization of this 10 CFR 50.55a request to support the implementation of the sixth IST ten-year interval for Monticello Nuclear Generating Plant (MNGP). Proposed Relief Request VR-07 requests to adopt American Society of Mechanical Engineers (ASME) Code Case OMN-26,
'Alternate Risk-Informed and Margin Based Rules for Inservice Testing of Motor Operated Valves [MOVs].'
Proposed Duration of Alternative (in terms of ISI/IST Program Interval with Start and End Dates):
This request, upon approval, will be applied to the MNGP sixth IST ten-year interval starting October 1, 2022 and is scheduled to end May 31, 2032.
Applicable ASME Code Requirements The following paragraphs and subparagraphs in Mandatory Appendix III of the ASME OM Code are affected by this Request to adopt Code Case OMN-26.Appendix III, III-3310 'lnservice Test Interval', subparagraph (c): 'The maximum inservice test interval shall not exceed 10 yr.
MOV inservice tests conducted per para. III-3400 may be used to satisfy this requirement.'Appendix III, III-3700 'Risk-Informed MOV Inservice Testing'. Risk-informed MOV inservice testing that incorporates risk insights in conjunction with performance margin to establish MOV grouping, acceptance criteria, exercising requirements and testing interval may be implemented. Appendix III, Subparagraph III-3721,
'[High Safety Significant Component (HSSC)] MOVs': 'HSSC MOVs shall be tested in accordance with para. III-3300 and exercised in accordance with para. III-3600 HSSC MOVs that can be operated during plant operation shall be exercised quarterly, unless the potential increase in core damage frequency (CDF) and large early release (LER) associated with a longer exercise interval is small.'Appendix III, III-3722 '[Low Safety Significant Component (LSSC)] MOVs', subparagraph (d): 'LSSC MOVs shall be inservice tested at least every 10 yr. in accordance with para. III-3310.'
Applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code), or ASME Operation and Maintenanceâ-of Nuclear Power Plants (OM Code), Edition and Addenda ASME OM Code, Operation and Maintenance of Nuclear Power Plants, 2017 Edition with no Addenda.
Current ISI or IST Program Interval Number and Start/End Dates MNGP is currently on its fifth IST ten-year interval that is scheduled to end on September 30, 2022. The MNGP sixth IST ten-year interval begins on October 1, 2022.
Applicable ASME Code Components and/or System Description Active safety related MOVs that are required by Subsection ISTC of the 2017 Edition of the ASME OM Code to be tested in accordance with Appendix III entitled Preservice and Inservice Testing of Active Electric Motor-Operated Valve Assemblies in Water-cooled Reactor Nuclear Power Plants.
Reason for Request
In accordance with 10 CFR 50.55a(z)(1), NSPM is requesting approval to adopt OMN-26 in conjunction with implementing Mandatory Appendix III as part of the 2017 Edition of the OM Code at the MNGP.
Code Case OMN-26 better aligns the inservice test intervals in Mandatory Appendix III to the Risk and Margin Based Licensee MOV Programs developed in response to NRC Generic Letter 96-05, 'Periodic Verification of Design-Basis Capability of Safety-Related Motor Operated Valves,' that have been in effect since 1998. There is no formal technical basis in Appendix III for limiting the maximum inservice test interval to 10 years. Code Case OMN-26 establishes a structured risk-informed approach for determining inservice intervals that provides
an acceptable level of quality and safety while providing NSPM additional inservice test schedule flexibility Full Description of Proposed Alternative NSPM proposes to implement OMN-26 alternative risk and margin informed rules for inservice testing of MOVs in its entirety at MNGP as described below:
Proposed Alternative to III-3310(c)
The maximum inservice test interval shall not exceed 10 years unless Risk Informed Inservice Testing under the alternative provisions of Code Case OMN-26 to para. III-3700. MOV inservice tests conducted per para. III-3400 may be used to satisfy this requirement.
Proposed Alternative to III-3700 Risk-informed MOV inservice testing that incorporates risk insights in conjunction with MOV Functional Margin to establish MOV grouping, acceptance criteria, exercising requirements and test interval may be implemented.
Proposed Alternative to III-3721 HSSC MOVs shall be tested in accordance with para. III-3300 and exercised in accordance with para. III-3600 while applying the following HSSC MOV Risk insights and limitations.
a) HSSC MOVs that can be operated during plant operation shall be exercised quarterly, unless the potential increase in core damage frequency (CDF) and large early release (LER) associated with a longer exercise interval is small.
b) For HSSC MOVs, the maximum inservice test interval shall be established in accordance with Table 1 of OMN-26 as shown below.
Table 1 HSSC MOV - Margin Based Maximum Inservice Test Intervals HSSC MOV Functional Maximum lnservice Test If MOV is routinely(A) operated at Design Margin(D) Interval (Years) Basis Pressure Conditions- Max lnservice Test Interval (Years)(B)
Low (< 5%) 2 4 Medium ( 5% and < 10%) 4 9 High ( 10% and < 20%) 9 9 Very High ( 20%) 9 12 OMN-26 Table 1 Notes:
(A) Occurs at a periodicity no less frequent than once a refueling outage.
(B) To utilize these intervals, test strokes at or exceeding design basis system conditions must be in the applicable safety function direction(s) and have no applicable operating experience, degradation, or diagnostic test anomaly with the potential for adverse impact on MOV functional margin or the capability of the MOV to perform its design basis function.
(D) For the purpose of this code case, the MOV functional margin limits apply to the As-Left MOV condition at the start of the inservice test interval and include applicable test uncertainties and allowance for service-related degradation.
Proposed Alternative to III-3722 (d)
For LSSC MOVs, the maximum inservice test interval shall be established in accordance with Table 2 of OMN-26, as shown below.
Table 2 LSSC MOV - Margin Based Maximum Inservice Test Intervals LSSC MOV Functional Margin(D) Maximum Inservice Test If MOV is routinely(A) operated at Design Interval (Years) Basis Pressure Conditions- Max lnservice Test Interval (Years)(B)
Low (< 5%) 4 9 Medium ( 5% and < 10%) 9 12 High ( 10% and < 20%) 12 12
Very High ( 20%) 12 16(c)
OMN-26 Table 2 Notes:
(A) Occurs at a periodicity no less frequent than once a refueling outage.
(B) To utilize these intervals, test strokes at or exceeding design basis system conditions must be in the applicable safety function direction(s) and have no applicable operating experience, degradation, or diagnostic test anomaly with the potential for adverse impact on MOV functional margin or the capability of the MOV to perform its design basis function.
(C) Operating plants that have acquired the requisite test data to satisfy Appendix III, paragraphs III-3310(b) or III-3722(c) must complete once cycle of collecting diagnostic test data at an extended test interval, minimum 9 and maximum 12 years, before extending the test interval by engineering evaluation to the maximum 16-year test interval.
(D) For the purpose of this code case, the MOV functional margin limits apply to the As-Left MOV condition at the start of the inservice test interval and include applicable test uncertainties and allowance for service-related degradation.
Description of Basis for Use The requested relief to adopt OMN-26 is in line with the current Joint Owners Group (JOG) MOV Periodic Verification (PV) Test Program implemented at MNGP in response to NRC Generic Letter 96-05. Both the JOG MOV PV Program and Code Case OMN-26 provide a Risk-Margin based methodology that establishes limitations for maximum inservice test intervals for MOVs. Code Case OMN-26 simply provides a reasonable extension of this Risk-Informed philosophy based on the lessons learned and accumulated MOV performance data gathered during MOV Performance Verification Testing. Appendix III alone, isolated from OMN-26, provides no such methodology other than a maximum limit for the inservice test interval regardless of Risk or Margin.
The requested allowed maximum inservice test intervals are modest extensions with many of the Low Risk MOVs extending from 10 to 12 years (20% increase). This test interval change can be readily adopted with no loss of MOV performance and/or safety system reliability provided that no adverse performance trends are indicated. MNGP's MOV Performance Trending Governance will ensure that only MOV's with good performance history, high stable margins and no adverse diagnostic trends would be candidates for the OMN-26 based inservice test interval extensions.
The requested High Margin Maximum interval changes afforded by OMN-26 align with NSPM's desire to adopt a divisional MOV outage testing strategy that reduces the implementation burden of MOV lnservice Testing and allows greater flexibility in optimizing safety system availability. The current six and ten-year JOG Program based High-Margin Maximum Intervals do not support this strategy.
The requested relief reduces the maximum test interval for HSSC MOVs allowed by Appendix III from ten years to nine years commensurate with Risk Informed Methodology. Further under this relief request, NSPM will treat MNGP MOVs currently classified as Medium Risk by the 3-Tier JOG Risk Ranking as HSSC thereby providing more rigorous periodic verification requirements for the applicable valves especially those with less than high margin.
The requested relief takes credit for routine design basis differential pressure testing (DBDPT) of MOVs to justify extending the maximum Inservice test interval to 12 Years for Very High Margin HSSC MOVs and 16 years for Very High Margin LSSC MOVs.
With the exception of Low Risk MOVs routinely operated at design basis differential pressure (D-P) conditions, Code Case OMN-26 does not allow maximum MOV Inservice Test intervals to exceed ten years unless the associated MOVs are classified as High Margin or Very High Margin. Most High Risk MOVs are limited to four years or less for Low/Medium Margins and most Low Risk MOVs are limited to nine years or less for Low/Medium Margins. Code Case OMN-26 provides more rigorous requirements targeted specifically to Low/Medium Margin MOVs than currently allowed under Appendix III. This Risk/Margin approach is in line with accepted Risk-Informed Strategies such as the JOG MOV PV Program.
For the majority of applicable MOVs (i.e., those MOVs not subject to periodic stroking under design basis D-P conditions), the Code Case limited the scope to only High Margin Valves for extending test intervals incrementally beyond current limits:
Test intervals for High Risk MOVs go from six to nine years Test intervals for Low Risk MOVs go from ten to twelve years (Note: Twelve years is aligned for all Boiling Water Reactor nuclear power plants (BWRs) with either 18- or 24- month refueling cycles).
The Table below provides a detailed comparison of the Maximum MOV Test Intervals for the JOG MOV Program, Mandatory Appendix III and Code Case OMN-26 that NSPM seeks to adopt at MNGP via this relief request. MOVs identified with Bold and Underline type have maximum MOV inservice test intervals exceeding the current Appendix III ten-year limit.
Table 3 MNGP Maximum MOV Test Intervals Based on Code Case OMN-26
OMN-26 Table 3 Notes:
(A) Code Case Maximum Inservice Test Intervals for all Low/Medium Margin MOVs are less than or equal to current ten-year Appendix III limit. (i.e., Code Case is more conservative than Appendix III for Low/Medium Margin MOVs).
(B) Code Case Maximum Inservice Test Intervals for Low/Medium Margin HSSC MOVs are equal to the current JOG MOV PV Program limits of two/four years respectively. (Code Case intervals are aligned with JOG MOV).
(C) Code Case Maximum Inservice Test Intervals for Low/Medium Margin LSSC MOVs (four/nine years) are less than the current JOG MOV PV Program Limits of six/ten years respectively.
(D) The following four categories of MOVs have maximum inservice test intervals that exceed the current ten-year limit:
- a. High Margin, LSSC MOVs (12 years)
- b. Very High Margin, HSSC MOVs that are periodically stroked at design basis DP conditions (DBDPT) (12 years)
- c. Medium Margin, LSSC MOVs that are periodically DBDPT (12 years)
- d. Very High Margin, LSSC MOVs that are periodically DBDPT (16 years)
(E) Except for Low Margin HSSC MOVs, the Maximum MOV Inservice Test Intervals are optimized for Divisional Outage Scheduling (i.e.,
4, 9, 12, 16 years). Twelve years is optimal for both BWRs and supports both 18-month and 24-month refueling outages.
(F) To utilize these intervals, test strokes at or exceeding design basis system conditions must occur at a periodicity no less frequent than once a refueling cycle, must be in the applicable safety function direction(s), and the MOV must have no applicable operating experience, degradation or diagnostic test anomaly with the potential for adverse impact on MOV functional margin or the capability of the MOV to perform its design basis function. These routine strokes during the inservice test interval are not required to be diagnostically monitored.
(G) Operating plants that have acquired the requisite test data to satisfy Appendix III, paragraphs III-3310(b) or III-3722(c) must complete one cycle of collecting diagnostic test data at an extended test interval, minimum 9 and maximum 12 years, before extending the test interval by engineering evaluation to the maximum 16-year test interval.
(H) The MOV functional margin limits apply to the As-Left MOV condition at the start of the inservice test interval and includes applicable test uncertainties and allowance for service-related degradation. The inservice test interval is uniquely established for each MOV based on margin and risk classification of the MOV.
Describe Hardship or Unusual Difficulty NOT APPLICABLE Any Additional Information (submission attachments listed here)
NOT USED (No Attachments)
Precedents H.B Robinson Steam Electric Plant, Unit 2 â SER for Proposed Alternative Request IST-RR-9 Regarding the Sixth 10-Year Interval Inservice Testing Program, dated November 4, 2021 (ADAMS Accession Number ML21259A099). Braidwood Units 1 and 2, Calvert Cliffs Units 1 and 2, Clinton Power Station, RE Ginna, Limerick Generating Station Units 1 and 2, Nine Mile Point Units 1 and 2, Peach Bottom Units 2 and 3 - SER for Proposed Alternative to Utilize Code Case OMN-26, dated September 1, 2020 (ADAMS Accession Number ML20232A171).
References
- 1. ASME OM Code Case OMN-26, Alternate Risk-Informed and Margin Based Rules for Inservice Testing of Motor Operated Valves.