IR 05000263/2023501

From kanterella
Jump to navigation Jump to search
Emergency Preparedness Inspection Report 05000263/2023501
ML23193A997
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/13/2023
From: Steven Orth
NRC/RGN-III
To: Hafen S
Northern States Power Company, Minnesota
References
IR 2023501
Download: ML23193A997 (1)


Text

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - EMERGENCY PREPAREDNESS INSPECTION REPORT 05000263/2023501

Dear Shawn Hafen:

On June 29, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness & Incident Response Branch Division of Radiological Safety and Security Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2023501

Enterprise Identifier:

I-2023-501-0008

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

June 26, 2023 to June 29, 2023

Inspectors:

G. Hansen, Sr. Emergency Preparedness Inspector

T. Hartman, Senior Project Engineer

J. Kutlesa, Emergency Preparedness Inspector

J. Nance, Operations Engineer

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness & Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise on June 27, 2023. The exercise scenario simulated an event at the Monticello Nuclear Generating Plant that initiated with the declaration and notification of an Unusual Event in response to the failure of a manual scram to reduce reactor power to less than 4%.

The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of an Alert, Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation - Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on May 25,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===

(1) April 1, 2022 through March 31, 2023 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) April 1, 2022 through March 31, 2023 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) April 1, 2022 through March 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 29, 2023, the inspectors presented the emergency preparedness inspection results to Shawn Hafen and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000053609

EP Drill - Procedure May Not Be Adequate

06/29/2021

501000053654

EP DRILL: ERO Activation Notification

06/29/2021

501000053680

EP Drill - State Phones Ringing Together

06/30/2021

501000054217

EP Drill Potential Trend

07/22/2021

501000054930

EP Exercise-Dispatch of Emergency Teams

08/10/2021

501000054938

EP Exercise Info Given Prior to Earning

08/10/2021

501000063364

EP Drill Missed Staffing Deadline

05/25/2022

501000063720

EP Drill Staffing Issue

06/08/2022

501000063880

EP Drill - PAR Flow Chart Clarification

06/14/2022

501000063891

EP Drill - Procedure Enhancement

06/14/2022

501000063901

EP Drill Inconsistent Scenario

06/14/2022

501000065965

EP Drill: Miscomm with TSC on Staffing

08/30/2022

501000066010

EP DRILL: Offsite Agency Phone Numbers

08/30/2022

501000066062

EP Drill Staffing Challenges

09/01/2022

501000066626

EP Drill: Difficulty Verify ERO Roster

09/23/2022

501000068033

EP TT Drill - Incomplete Notification

11/01/2022

Corrective Action

Documents

501000070511

Adverse Trend in Shift Manager DEP

2/07/2023

Miscellaneous

E-PLAN

Monticello Nuclear Generating Plant Emergency Plan

A.2-101

Classification of Emergencies

A.2-106

Activation and Operation of the TSC

A.2-107

Activation and Operation of the OSC

A.2-201

On-Site Protective Action

A.2-205

Personnel Accountability

A.2-206

Work Control During Emergencies

A.2-213

Responsibilities of the Emergency Director

A.2-402

On-Site Radiological Monitoring

A.2-501

Communications During an Emergency

A.2-504

Emergency Communicator Duties in the TSC and OSC

A.2-801

Responsibilities of the Emergency Manager

71114.01

Procedures

A.2-802

Activation and Operation of EOF

71114.08

Miscellaneous

Monticello Nuclear Generating Plan (MNGP) Emergency

04/24/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Plan (EP) 2023 Exercise Scenario

Emergency Response Organization (ERO) Drill Participation

Performance Indicator Records

04/01/2022-

03/31/2023

Drill and Exercise Participation (DEP) Performance Indicator

Records

04/01/2022-

03/31/2023

71151

Miscellaneous

Alert Notification System (ANS) Reliability Performance

Indicator Records

04/01/2022-

03/31/2023